文档库 最新最全的文档下载
当前位置:文档库 › 软件工程第8版部分课后习题答案

软件工程第8版部分课后习题答案

软件工程第8版部分课后习题答案
软件工程第8版部分课后习题答案

课后习题:

?What are the differences between generic software product development and custom software development?

?Solution:

The essential difference is that in generic software product development, the specification is owned by the product developer. For custom product development, the specification is owned by the customer. Of course, there may be differences in development processes but this is not necessarily the case.

重要区别为:在通用软件的开发过程中,详细说明(规格说明书)由产品开发者来制定,在定制软件产品开发过程中,详细说明(规格说明书)由客户来制定。

?What are the four important attributes which all software products should have? Suggest four other attributes that may sometimes be significant.

?Solution:

For important attributes are maintainability可维护性,

dependability 可靠性, performance(efficiency)有效性and

usability可用性.

Other attributes that may be significant could be reusability可复用性 (can it be reused in other applications),

distributability 可分发性(can it be distributed over a network

of processors), portability可移植性 (can it operate on

multiple platforms) and inter-operability互用性 (can it work

with a wide range of other software systems).

?What is the difference between a software process model and a software process? Suggest two ways in which a software process model might be helpful in identifying possible process improvements.

?Solution:

A software process is what actually goes on when software is

developed. A software process model is an abstraction and

simplification of a process. Process models can be used to help

understand real processes and to identify which aspects of these

processes could be supported by CASE tools. 软件过程就是指在

软件开发过程中所做的一些事情。软件过程模型是过程的抽象和简化。

过程模型可用于帮助理解真正的过程,并可用于识别过程中的哪些方

面可用CASE工具支持。

?Giving reasons for your answer based on the type of system being developed, suggest the most appropriate generic software process model that might be used as a basis for managing the development of the follow systems:

1) Anti-lock braking system

2) Virtual reality system

3) University accounting system

4) Interactive timetable

Solution:

(a) Anti-lock braking system: Safety-critical 安全鉴定system so

method based on formal transformations with proofs of

equivalence等价 between each stage.

(b) Virtual reality system: System whose requirements cannot be

predicted预知 in advance预先地 so exploratory programming

model is appropriate.

(c) University accounting system: System whose requirements should

be stable because of existing system therefore waterfall model

is appropriate.

(d) Interactive timetable交互式时间表: System with a complex user

interface but which must be stable and reliable. Should be based

on throw-away prototyping to find requirements then either

incremental development or waterfall model.

?Why a software system that is used in a real world environment must change or become progressively(日益增多地) less useful?

?Solution:

Systems must change because as they are installed in an environment the environment adapts to them and this adaptation naturally

generates new/different system requirements. 这种适应自然生成

新的系统需求

Furthermore, the system's environment is dynamic and constantly generates new requirements as a consequence of changes to the

business, business goals and business policies.商务的目标以及

政治相关Unless the system is adapted to reflect these

requirements, its facilities will become out-of-step with the

facilities needed to support the business and, hence, it will

become less useful.

?Why a good programmers is not always be a good software managers?

?Solution:

Management activities such as proposal writing, project planning and personal selection require a set of skill including

presentation 表述能力and communication skills交流的能力.

Organizational skills组织能力 and the ability to communicate

with other project team members.

Programming skills are distinct from these, it is common that they lack human communication skills他们缺乏交流技巧是一个普

遍的事实. So it does not follow that good programmers can

re-orient their abilities to be good managers.

管理活动包括提出书面建议,项目规划和进度,人员选择和评价,项目监督和评审,和其他队友的交流能力等。程序设计者的任务就不是这些,他们不需要和人交流的能

力,如果按照做好一个程序设计者的要求去做管理者的话,他肯定不是一个号的管

理者。

?Why the process of project planning is iterative and why a plan must be continually不断地reviewed during a software project.

?Solution:

Project planning can only be based on available information. At the beginning of a project, there are many uncertainties in the

available information and some information about the project and

the product may not be available. As the project develops, more

and more information becomes available and uncertainties are

resolved. The project plan therefore must be reviewed and

updated regularly to reflect this changing information

environment.

软件项目地规划取决于有用地信息。在项目进行期间不断产生新的信息,所以必须经常性的修改原有的计划。原本有用的信息可能会不再有用,

而原本一些不确定的信息反而会变得有用。最初对象目本身的估算是

实验性的,所以计划需要不断的修改。

Suggest who might be stakeholders in a university student records system.

The stakeholders in a student records system include:

University central administration including those responsible for registration, payment of fees, exams and assessment and

graduation. 大学管理中心,包括报到,交纳学费,考试,作业和毕

业等

The students whose details are recorded in the system. 记录在这个系统中的学生

University departmental administrators who supply information to the system and use information from it. 大学部门管理者,需要

提供和使用这些信息

Academic staff that use information from the system. 使用系统信息的学院成员

Data protection officers (local and national). 数据保护工作者

Potential employers of students(who may require information from the system). 潜在的学生中的雇佣者

在学生记录系统中的参与者包括:

。学校管理中心包括负责学生注册,缴费,考试,评估,毕业事宜的相关人员

。那些被记录具体信息的学生

。把学生信息录入到系统并使用系统信息的学校部门人员

。使用这些信息的学术人员

。数据安全人员(本地和国家的)

。潜在的雇用学生的人(或许需要用到这个系统里面的信息)

7.3 For three of the viewpoints identified in the library system.

LIBYSY, suggest three requirement that could be suggested by stakeholders associated with that viewpoint.

Solution:

You can tackle this problem using a brainstorming approach.

Obviously, there are many alternatives to the solutions

suggested here. Note the printing conflict is deliberate.

Viewpoint: Library manager

Requirement: Access to the LIBSYS system shall be restricted to accredited users of the library.

Requirement: The LIBSYS system shall provide a reporting facility that allows usage reports (who used the system, how often, what libraries were accessed) to be created and printed.

Requirement: The LIBSYS system shall be configured so that only document printing on specific library servers is permitted.

Viewpoint: Users

Requirement: The LIBSYS system shall be accessible from any location, including locations away from the university campus.

Requirement: It shall be possible to save LIBSYS queries, recall them and modify them for subsequent use.

Requirement: The LIBSYS system shall allow documents to be printed on user printers.

Viewpoint: System managers

Requirement: The restart time of the LIBSYS system after failure shall not exceed 5 minutes.

Requirement: The LIBSYS system shall provide a backup facility for user’s personal workspaces.

Requirement: The LIBSYS system shall be available for a range of platforms including Windows 2000, Windows XP and Mac OS X.

7.4 The LIBSYS system has to include support for cataloguing

new documents where the system catalog may be distributed across

several machines. What are likely to be the most important types

of non-function requirement associated with the cataloguing

facilities?

?Solution:

Important non-functional attributes for the cataloging services might be:

? Availability (because the system may be required at any time)

? Security (because the books data base musn’t be corrupted)

? Efficiency (because the system must respond quickly to each transaction)

For the browsing services, usability is also very important as these services should be easy to use without extensive training.

?Discuss an example of a type of system where social and political factors might strongly influence the system requirement. Explain why these factors are important in your example.

?Solution:

An example of a system where social and political factors influence system requirements is a system to manage the costs of public

healthcare. Politicians are anxious both to control costs and

to ensure that the best public image of the healthcare system

is provided. There is a potential conflict in such a system

between administrators who are driven by treatment costs and

doctors who are (or should be) driven by treatment effectiveness.

The requirements for the system might therefore embed particular

policies which are included as a result of organizations factors

(e.g. ensure that administrators can vet treatment costs) rather

than technical requirements.

社会和政治因素影响系统需求的一个例子是管理成本和公共卫生保健的系统。政治家们对控制成本和确保提供最好的卫生保健系统都很关心。

在这样一个系统中这本来就是一对潜在的矛盾,系统管理人员关心的

治疗成本而医生们关心的治疗效果。此时系统需求可能要建立在特殊

的包括一系列组织因素的政策上而不是技术需求。

11.1 Why it may be necessary to design the system architecture before the specification are written?

Solution:

The architecture may have to be designed before specifications are written to provide a means of structuring the specification and

developing different sub-system specifications concurrently,

to allow manufacture of hardware by sub-contractors and to

provide a model for system costing.

体系结构设计过程输出了一个体系结构的设计文档,这样的设计文档包含了一系列图形化的系统模型描述和一些相关的描述文本。该文当描述了系统如何有子系统构成以

及每个子系统如何有模块构成。

11.4 Giving reasons for your answer, suggest an appropriate

structural model for the following systems:

1.an automated ticket-issuing system used by passengers at a

railway station

2. a computer-controlled video conferencing system that allows

video, audio and computer data to be visible to several

participants at the same time.

3. a robot floor-cleaner that is intended to clean relatively clear

spaces such as corridors, the cleaner must be able to sense walls

and other sbstructions.

Solution:

Ticket issuing system . The most appropriate architectural model is a centralised model with a shared repository of route and

pricing information. This means that changes are immediately

available to all machines. As little local processing is

necessary, there is no real advantage in

a client-server architecture. The centralised system also allows

global information and route use to be collected and processed.

Video conferencing system. The most appropriate is a client-server model. The reason for this is the need for a lot of local

processing to handle multimedia data.

Robot floor cleaner. The most appropriate model is a repository model where all sub-systems place information in the repository

for other sub-systems to use. In the case of AI systems as this

would be, a special kind of repository called a blackboard is

normally used.

?11.4.1一个在铁路站旁,供乘客使用的自动售票系统

答:自动售票系统。最合适的架构模型是有共享数据仓库和定价信息的集中式控制模型。当使用这种模型时,所有机子能立即获取改变的信息。

由于没有局部处理的必要,所以使用客户/服务架构没有什么优势。集

中式控制系统允许全局信息和路径被收集和处理。

?11.4.2一个允许在同一时间段,视频,音频,计算机数据对很多参与者是可见的计算机控制视频会议系统

答:视频会议系统。最合适的是使用客户/服务模型。很多局部过程用来处理多媒体数据。

?11.4.3一个清洁机器人,主要用来清理一些地方比如走廊。该清洁机器人必须能感应墙和其他的障碍物。

答:清洁机器人。最适合的模型是贮藏式模型。这时所有的子系统把信息存放在其他子系统得贮藏室,以备后用。以AI系统为例,一种特殊的贮藏室叫做“黑板”被使用

?11.8 Discuss their advantages and disadvantages as far as distributability is concerned of the data-flow model and the object model. Assume that both single machine and distributed versions of an application are required.

?就分布性讨论数据流模型和对象模型的优点和缺点。假设应用程序的淡季和分布式版本都是必需的。

?Solution:

Both models can be distributed where each transformation in a DFD is implemented as a separate process and each object is

implemented as process. Problem with functional decomposition

is the need for shared state which must also be implemented as

one or more processes. In the object model, distributing objects

is a problem if inheritance is involved as this creates a lot

of network traffic.

两种模型都能作为分布式,数据流程图中的每个转换都可以看作是个分离的过程,而每个对象也可以作为过程实现。函数的分解需要共享状态,

并表示为一个或多个过程。在对象模型中分布对象是个问题,对象如

果继承的话就如同它的创建一样会造成很多网络阻塞。

?14.2 Using examples, explain the difference between an object and an object class.

?Solution:

?用例子,解释对象和对象类之间的不同。

An object class is a generic description of a set of entities (or objects) which have common characteristics and which are

recognizably the same in some or all respects. Objects are

specific instances in the real-world or in a system where values

have been assigned to the characteristics defined in the object

class. The set of values assigned to the object characteristics

may distinguish that object from all other objects but need not

do so. In the real-world, we only see objects and construct

object classes as abstract entities. In programs, we often only

define object classes and construct objects whose lifetime is

no longer than the execution time of the program.

对象类就是定义实体(或者说对象)的类型说明,包含可以被识别的相似的公共特征。对象是真实世界或是在系统中的通过对象类对其属性进行

赋值的特殊实例。给对象的赋值操作可用于识别与其他所有对象的区

别,尽管不需如此。在现实世界中,我们只能看到对象和作为抽象实

体的构造对象类。在程序中,我们通常可以定义对象类和构造对象,

它们的声明周期不超过程序的执行时间。

?An example of an object class is a BOOK which has attributes (characteristics) such as AUTHOR, TITLE, PUBLISHER, DATE OF PUBLICATION, etc.

一个叫做“BOOK”的对象类的例子,属性有诸如……

?An example of an object or instance of this object class is the specific book:

一个关于这个对象类的对象的例子“specific book”

?AUTHOR: Ian Sommerville

?TITLE: Software Engineering

?EDITION: 7

?PUBLISHER Addison-Wesley

?DATE 2004

?If we wished to define a book object which was distinct from all other objects, we would need to add another characteristic to the object class such as OWNER.

?16.2 Suggest situations where it is unwise or impossible to provide a consistent user interface.

?说明在什么情况下提供前后一致的用户界面是不明智的或是不可能的。

?Solution:

A consistent user interface may be impossible to produce for complex

systems with a large number of interface options. In such systems,

there is a wide imbalance between the extent of usage of

different commands so for frequently used commands, it is

desirable to have short cuts. Unless all commands have short cuts,

then consistency is impossible.

It may also be the case in complex systems that the entities manipulated are of quite different types and it is inappropriate

to have consistent operations on each of these types.

An example of such a system is an operating system interface. Even MacOS which has attempted to be as consistent as possible has

inconsistent operations that are liked by users.

For example, to delete a file it is dragged to the trash but dragging

a disk image to the trash does not delete it but unmounts that

disk.

一致性的用户界面也许不可能提供给拥有大量选项的复杂系统。

在这样的系统中,经常使用的不同命令的使用程度有很大差异,因此

我们希望用快捷方式。除非所有的命令都有快捷方式,否则一致性的

界面是不可能的。

此外在复杂的操作界面中有不同类型的操作实体,这些不同类型的操作实体拥有相同的操作是不可能的。

开放型操作系统就是这样一个系统的例子。甚至是竭力做到尽可能一致性界面的苹果操作系统(MacOS)都会根据不同的用户喜好而由

此产生矛盾。

再举个例子,用户要删除一个文件,只要把它拉到垃圾回收站,而删掉一个磁盘映像可不能这样,那要卸载那个磁盘。

?16.3 What factors have to be taken into account in the design of menu-based interface for …wa lk-up? system such as bank ATMs? Write a critical commentary on the interface of an ATM that you use.

?在为“临街的”系统(如ATM机)涉及基于菜单的界面时,必须考虑哪些因素?请对你所使用的ATM机的界面提出批评意见。

Solution:

Factors to be taken into account when designing 'walk up and use' systems are:

? System users may be infirm, or disabled so will not be able to respond quickly to requests.

? Users may not be able to speak the native language of the country where the machine is installed.

? System users may be completely unfamiliar with technology and may make almost any kind of error in using the machine. The interface

must minimise the number of possible errors and must be resilient

to any possible error.

? Some system users are likely to be intimidated by many options.

On the other hand, as users gain familiarity with the system,

they may expect to use it for a wider range of banking services.

? Different people may understand the meaning of icons in different ways.

? If the system has navigation options, users are almost certain to become lost.

? Most users will want to use the system for very simple functions

(e.g. withdraw cash from an ATM) and will want to do this as

quickly as possible.

There are many different ATM interfaces so each must be considered separately. Problems which I have found are:

When is it possible to cancel a transaction? What happens when I do so? What will I have to re-input if I restart the transaction?

There is not usually any way of saying give me the maximum amount of money I may withdraw today.

Some machines only support single transactions - there is no way of saying I will be making several transactions and the same

validation process is applicable to all of them.

?16.5 Discuss the advantages of graphical information display and suggest four applications where it would be more appropriate to use graphical rather than digital displays of numeric information.

?Solution:

?试述图形显示的优点,指出适合用图形显示数值而不适合用数字显示的四种应用。

Advantages are ‘at a glance’ magnitude indication and relative magnitude indication. Any applications where these are

important might be mentioned:

? Temperature control

? Speed indicators

? Weather statistics

? Relative comparisons of cars, etc.

优点是匆匆一眼就能获得数值暗示和相对数值暗示。

这里有四个适于图形显示信息,而不适用于数字显示信息的例子.

温度计速度指示器气候统计表一些相关的比较表格.

?17.3 When would you recommend against the use of an agile method for developing a software system?

?你在什么情况下会建议不采用敏捷方法进行软件系统开发?

Agile methods should not be used when the software is being developed by teams who are not co-located – if any of these teams use

agile methods, it is very difficult to coordinate their work with

other teams. Agile methods should probably also be avoided for

critical systems where the consequences of a specification error

are serious. In those circumstances, a system specification that

is available before development starts makes a detailed

specification analysis possible. However, some ideas from agile

approaches such as test first development are certainly

applicable to critical systems.

当几个软件开发团队不在同一个地方时不可用敏捷方法。如果其中一个团队用了敏捷方法,就很难跟其它团队协调工作.敏捷方法也要避免用在

关键系统,在规格错误的情况下如果用这个方法,会导致严重的后果.

在开发系统之前规格就可以用的情况下,可以做详细的规格分析使用

敏捷方法成为可能.然而,一些敏捷方法中的思想像测试优先开发

(Test First Development–TFD 又称先行测试开发)当然是可以适用

于关键系统的.

?17.5 Explain why test-first development helps the programmers develop a better understanding of the system requirements. What are the potential difficulties with test-first development?

?解释为什么测试优先开发能帮助程序员获得对系统需求的更好的理解。测试优先的开发有什么潜在的困难。

Test-first development helps with understanding the requirements because, in order to write a test, you have to analyse the

requirements in detail to discover what is intended. In many

cases, you may find that writing a test is impossible because

the requirements are incomplete.

The problem with test-first development is that some tests are very difficult to write because they require a system infrastructure

to be in place before anything can be tested.

?测试优先开发帮助我们更好地理解需求,因为你要写一个测试程序,就需要分析需求,探究详细意图。

?有时候,在需求不全的情况下,你会发现写一个测试是不可能的。测试优先开发的问题就在于是一些测试很难写,因为在任何一个测试之前都要一个就绪的系统底层结构.

?17.6 Suggest four reasons why the productivity rate of programmers working as a pair is roughly the same as two programmers working individually.

?给出四个理由说明为什么结对编程和单个程序员编程的软件生产率基本上是一样的。

Reasons why pair programming is as efficient as the same number of programmers working individually:

Pair programming leads to continuous informal reviewing. This discovers bugs more quickly than individual testing.

Information sharing in pair programming is implicit – it happens during the process.

Individual programmers have to spend time explicitly sharing information.

Pair programming encourages refactoring (the code must be understandable to another person). This reduces the costs of

subsequent development and change.

In pair programming, people are likely to spend less time in fine-grain optimization as this does not benefit the other

programmer.

结对编程和同等数量的编程人员单独编程一样有效的原因:

1.结对编程会引发连续非正式地复查,这样会比单独编程更快地发现错误。

2.结对编程过程中,信息是共享的。单独编程中,人们不得不花时间来共

享信息。

3.结对编程鼓励重构(代码需要让其他人看懂),这样减少了后期开发和

变动的成本。

4.结对编程可能花更少的时间在细节优化上,因为这对其他程序员来说没

有好处。(译者注:没看懂)

?17.8 A software manager is involved in the project development of a software design support system

?that supports the translation of software requirements to a form software specification. Comment on the advantages and disadvantages of the following development strategies:

?假设一个软件管理者参与了一个开发某个软件设计支持系统的项目,此系统是要支持将软件需求翻译成形式化软件描述。请评论下列开发策略的优点和缺点。

a)* Develop a throw-away prototype, evaluate, it then review the system

requirements. Develop the final system using C.

开发抛弃式原型,评估,然后审查系统需求。用C语言开发此系统。

Throw-away prototyping

Fast development and rapid feedback from users.

Likely to result in reasonable requirements.

Needs multiple development languages.

Costs more.

丢弃原型化方法:

快速的开发和快速的用户反馈.

可以带来合理的需求.

需要多种开发语言.

花费更高.

?b)* Develop the system from the existing requirements using Java, the modify it to adapt to any changed user requirements.

?适用java从现存的需求开始开发系统,然后修改它使之适应任何变更的用户需求。

Develop using C and X-windows

Fewer problems with training.

Known management strategy.

Requirements likely to be wrong so needs post-delivery modification.

训练几乎没问题

已知的管理策略.

需求可能的错误的,所以要交付修改.

?c)* Develop the system using incremental development with a user involved in the development team.

?适用增量式方法并让用户参与到开发团队来开发此系统。

Evolutionary prototyping

Fast feedback from users.

Rapid system delivery.

Readily adapted to evolving requirements.

Hard to manage.

Lack of standards for portability etc.

Likely to be unstructured causing future maintenance problems.

进化的方法.

快速的用户反馈.

快速的系统交付.

容易适应改变的需求.

很难管理

缺少可移植性的标准.

无特定系统结构,将导致以后的维护困难.

?18.2 Suggest why the saving in cost from reusing existing software is not simply proportional to the size of the components that are reused.

?解释下为什么通过复用已有的软件所节省的成本并不简单地与所适用的组件规模成比例。

?Solution:

If savings from reuse were proportional to the amount of code reused, then reusing 2000 lines of code would save twice as much as

reusing 1000 lines of code. However, to reuse 2000 lines of code,

that code must be understood and the costs of program

understanding are not linear – the more code to be understood,

the more effort it takes to understand it.

Furthermore, more changes may be required, the larger the amount of code reused so this also adds to the costs of reusing more

code.

Of course, all this is only true if the code has to be understood before it is reused. If it can be reused without change, then

savings from reusing large chunks of code tend to be

proportionally greater than savings from reusing small code

fragments.

如果复用节约的成本和复用的代码成比例,那么复用2000行代码就相当于复用两次1000行代码了。然而,复用2000行代码,那些代码必须

要被理解,程序理解的费用不是线性的——越多的代码,就需要越多

的努力去理解的。

而且,当需要更多的改动时,就需要更大量的代码复用,这也增加了成本。

?18.3 Give four circumstances where you might recommend against software reuse.

?给出你认为不应该适用软件复用的4种情况。

Solution:

Circumstances where software reuse is not recommended:

If the business status of the code provider is dubious. If the provider goes out of business, then no support for the reused

code may be available.

In critical applications where source code is not available. Testing the code to the required standards may be very difficult.

In small systems where the costs of reuse are comparable to the savings that result if code is reused.

In systems where performance is a critical requirement – specially developed code can usually be made more efficient.

?一如果代码提供商的运作状况不确定,或者提供商歇业,不支持代码的复用。

?二关键部分的代码不可用。要测试这些代码以达到所需标准,可能非常困难。

?三再利用所花的成本和再利用所节省下来的差不多的小型系统

四在一些关键需求在于性能的系统里,专门开发的代码通常更有效率。

?18.4 Why are patterns an effective form of design reuse? What are the disadvantages to this approach to reuse?

?为什么模式是一种有效的设计复用形式?这种复用方式的缺点是什么?

Patterns are an effective form of design reuse because the reflect accumulated wisdom that has been collected over several

applications rather than a single application (By definition,

a pattern is something that should appear in more than one

application). There are two problems with patterns for reuse.

The first is knowing which patterns actually have been

documented and then finding these patterns - the time taken to

do this can be significant. The second is that patterns are by

their nature generalisations so their performance is likely to

be limited. If performance is critical, then a special-purpose

tailored approach to a problem will almost always be more

effective.

?模式是一种有效的再利用设计,是因为它是很多人在应用中积累出来的智慧.这种方法有两种缺点:

?知道哪一个模式被存档,找到这些模式所花的时间是必要的.

? 2.很多模式是一般化的,很多性能可能被限制.如果性能是主要要求的话,那么为某一个问题问题特别研究的方法总是更有效率的.

?Identify six possible risks that can arise when systems are constructed using COTS. What steps can a company take to reduce these risks?

?Risks that can arise when systems are constructed using COTS include:

?Vendor risks: Failure of vendor to provide support when required

?Vendor goes out of business or drops product from its portfolio

?Product risks: Incompatible event/data model with other systems

?Inadequate performance when integrated with other systems

?Product is undependable in intended operating environment

?Process risk: Time required to understand how to integrate product is higher than expected.

?The risks can be addressed by only dealing with vendors that use an escrow system so that source code is available if they go out of business, by extensive research and testing of product capabilities before use, discussion with other users etc. In general though, because

?COTS are provided by external vendors, risk reduction is difficult.

?卖主风险:卖方无法提供必要的支持,卖方歇业或结束产品开发.

?产品风险:和其它系统不兼容,和其它系统组装时性能下降,在特定环境下,产品不可靠.

?过程风险:理解如何组装产品的时间超出预期.

?可以通过使用第三方系统来解决.这样的话,可以通过深入的研究,投入使用前的产品兼容性的测试,和其它用户讨论等方法来保证源代码的可用,如果卖方

歇业的话.

?通常,COST是由卖方提供的,要减少风险是困难的.

?19.1 Why is it important that all component interactions are defined through “requires” and “provides” interfaces?

?It is important to define all interactions through requires and provides interfaces so that the use of the component is completely independent of its implementation. If component interactions use some knowledge of the components that is not defined in the requires/provides interfaces then the coupling between the components is increased and it is harder to interchange one component for an equivalent component with the same interfaces.

?19.3 What are the fundamental differences between components and web services (see Chapter 12).

软件工程试题及答案34385

软件工程期末试卷(A) 说明:本试卷为04级计算机专业(专升本)软件工程期末试卷,总计100分,时间100分钟 一、选择题:(每题1分,共20分)(将答案写在题号前的()中) ( C )1. 软件是()。 A. 处理对象和处理规则的描述 B. 程序 C. 程序及其文档 D. 计算机系统 ( B )2. 软件需求规格说明的内容不应包括()。 A. 主要功能 B. 算法的详细描述 C. 用户界面及运行环境 D. 软件的性能 ( B )3. 程序的三种基本控制结构是()。 A. 过程、子程序和分程序 B. 顺序、选择和重复 C. 递归、迭代和回溯 D. 调用、返回和转移 ( D) 4. 面向对象的分析方法主要是建立三类模型,即( )。 A) 系统模型、ER模型、应用模型 B) 对象模型、动态模型、应用模型 C) E-R模型、对象模型、功能模型 D) 对象模型、动态模型、功能模型 ( C ) 5. 在E-R模型中,包含以下基本成分( )。 A) 数据、对象、实体 B) 控制、联系、对象 C) 实体、联系、属性 D) 实体、属性、操作 ( A ) 6. 各种软件维护的类型中最重要的是( )。 A) 完善性维护B) 纠错性维护C) 适应性维护D) 预防性维护 ( B ) 7.软件测试的目标是()。 A. 证明软件是正确的 B. 发现错误、降低错误带来的风险 C. 排除软件中所有的错误 D. 与软件调试相同 ( D )8.软件生命周期中所花费用最多的阶段是() A.详细设计 B.软件编码 C.软件测试 D.软件维护 ( C )9.若有一个计算类型的程序,它的输入量只有一个X,其范围是[-1.0, 1.0],现从输入的角度考虑一组测试用例:-1.001, -1.0, 1.0, 1.001.设计这组测试用例的方法是()A.条件覆盖法 B.等价分类法 C.边界值分析法 D.错误推测法 ( D )10、详细设计的基本任务是确定每个模块的( )设计 A.功能 B.调用关系 C.输入输出数据 D.算法 ( A )11.设函数C(X)定义问题X的复杂程序,函数E(X)确定解决问题X需要的工作量(时间)。对于两个问题P1和P2,如果C(P1)>C(P2)显然E(P1)>E(P2),则得出结论E(P1+P2)>E(P1)+E(P2)就是:() A.模块化的根据B.逐步求精的根据C.抽象的根据D.信息隐藏和局部化的根据 ( D )12.下面几种白箱测试技术,哪种是最强的覆盖准则() A.语句覆盖B.条件覆盖C.判定覆盖D.条件组合覆盖

软件工程习题及答案

软件工程习题及答案 一、选择题: 1. 为了提高测试的效率,应该。 A、随机地选取测试数据 B、取一切可能的输入数据作为测试数据 C、在完成编码后制定软件的测试计划 D、选择发现错误可能性大的数据作为测试数据 2. 与设计测试数据无关的文档是。 A、需求说明书 B、设计说明书 C、源程序 D、项目开发设计 3. 结构设计是一种应用最广泛的系统设计方法,是以为基础、自顶向下、逐步求精和模块化的过程。 A、数据流 B、数据流图 C、数据库 D、数据结构 4. 概要设计的结果是提供一份。 A、模块说明书 B、框图 C、程序 D、数据结构 5. 需求分析是由分析员经了解用户的要求,认真细致地调研、分析,最终应建立目标系统的逻辑模型并写出。 A、模块说明书 B、软件规格说明书 C、项目开发计划 D、合同文档

6. 注释是提高程序可读性的有效手段,好的程序注释占到程序总量的。 A、1/6 B、1/5 C、1/4 D、1/3 7. 变换型和事务型是程序结构的标准形式。从某处获得数据,再对这些数据作处理,然后将结果送出是属于。 A、变换型 B、事务型 8. PAD(Problem Analysis Diagram)图是一种工具。 A、系统描述 B、详细设计 C、测试 D、编程辅助 9. 分层数据流图是一种比较严格又易于理解的描述方式,它的顶层描绘了系统的。 A、总貌 B、细节 C、抽象 D、软件的作者 10. 数据流图中,当数据流向或流自文件时,。 A、数据流要命名,文件不必命名 B、数据流不必命名,有文件名就足够了 C、数据流和文件均要命名,因为流出和流进数据流是不同的 D、数据流和文件均不要命名,通过加工可自然反映出 11. 分析员是。 A、用户中系统的直接使用者 B、用户和软件人员的中间人 C、软件的编程人员 D、用户和软件人员的领导 12. 在软件开发中,有利于发挥集体智慧的一种做法是。

软件工程试题及答案

4. 面向对象的分析方法主要是建立三类模型,即( D )。 A) 系统模型、ER模型、应用模型 B) 对象模型、动态模型、应用模型 C) E-R模型、对象模型、功能模型D) 对象模型、动态模型、功能模型 5. 在E-R模型中,包含以下基本成分( )。 A) 数据、对象、实体B) 控制、联系、对象C) 实体、联系、属性 D) 实体、属性、操作 9.若有一个计算类型的程序,它的输入量只有一个X,其范围是[, ],现从输入的角度考虑一组测试用例:, , , . 设计这组测试用例的方法是( c ) A.条件覆盖法 B.等价分类法C.边界值分析法 D.错误推测法 10、详细设计的基本任务是确定每个模块的( d )A.功能B.调用关系C.输入输出数据 D.算法 11.设函数C(X)定义问题X的复杂程序,函数E(X)确定解决问题X需要的工作量(时间)。对于两个问题P1和P2,如果C(P1)>C(P2)显然E(P1)>E(P2),则得出结论E(P1+P2)>E(P1)+E(P2)就是:( a ) A.模块化的根据 B.逐步求精的根据 C.抽象的根据 D.信息隐藏和局部化的根据13.面向数据流的设计方法把( D )映射成软件结构。 A.数据流 B.系统结构 C.控制结构 D.信息流 14.内聚程度最低的是( A.偶然 )内聚A.偶然 B.过程 C.顺序 D.时间 15.确定测试计划是在( D )阶段制定的.A.总体设计 B.详细设计 C.编码 D.测试 16.需求分析的产品是( D ) A.数据流程图案 B.数据字典 C.判定表D.需求规格说明书 17.数据字典是软件需求分析阶段的最重要工具之一,其最基本的功能是( C ) A.数据库设计 B.数据通信 C.数据定义 D.数据维护 18.( D )引入了“风险驱动”的思想,适用于大规模的内部开发项目。 A.增量模型 B.喷泉模型 C.原型模型D.螺旋模型 (×)2、系统测试的主要方法是白盒法,主要进行功能测试、性能测试、安全性测试及可靠性等测试。 (×)4、软件需求分析的任务是建立软件模块结构图。 (√)5、尽可能使用高级语言编写程序(×)6、以结构化分析方法建立的系统模型就是数据流图。 (×)7、进行总体设计时加强模块间的联系。(×)8、编码时尽量多用全局变量. (√)9、用CASE环境或程序自动生成工具来自动生成一部分程序.(×)10、软件测试是要发现软件中的所有错误。 1. 软件生命期各阶段的任务是什么答:软件生命期分为7个阶段:1、问题定义:要解决的问题是什么 2、可行性研究:确定问题是否值得解,技术可行性、经济可行性、操作可行性 3、需求分析:系统必须做什么 4、总体设计:系统如何实现,包括系统设计和结构设计 5、详细设计:具体实现设计的系统 6、实现:编码和测试 7、运行维护:保证软件正常运行。 2、软件重用的效益是什么?

软件工程课后习题参考答案

1.简述软件开发的本质。 答:软件开发的本质就是实现问题空间的概念和处理逻辑到解空间的概念和处理逻辑之间的映射。P19 2.简述实施软件开发的基本途径。 答:实施软件开发的基本途径是系统建模。所谓系统建模,是指运用所掌握的知识,通过抽象,给出该系统的一个结构——系统模型。P19 3.简述何谓模型以及软件开发中所涉及的模型。 答:模型是一个抽象。该抽象是在意图所确定的角度和抽象层次对物理系统的一个描述,描述其中的成分和成分之间所具有的特定语义的关系,还包括对该系统边界的描述。 软件开发中所涉及的模型可分为两大类,一类称为概念模型,描述了系统是什么;另一类统称为软件模型,描述了实现概念模型的软件解决方案。 4.简述软件开发所涉及的两大类技术。 答:软件开发所涉及的两大类技术为:一是求解软件的开发逻辑,二是求解软件的开发手段。 5、简述需求与需求规约的基本性质。 答:需求的基本性质:1) 必要的,该需求是用户所要求的。2)无歧义的,该需求只能用一种方式解释。3)可测的,该需求是可进行测试的。4)可跟踪的,该需求可从一个开发阶段跟踪到另一个阶段。5)可测量的,该需求是可测量的。 需求规约的基本性质:1)重要性和稳定性程度:按需求的重要性和稳定性,对需求进行分级。2)可修改的:在不过多地影响其他需求的前提下,可以容易地修改一个单一需求。 3)完整的:没有被遗漏的需求。4)一致的:不存在互斥的需求。 6、简述软件需求的分类。

答:软件需求可以分为两大类:一类是功能需求,一类是非公能需求,而非公能需求可 7、举例说明功能需求和非功能需求之间的基本关系。 答: 非功能需求可作用于一个或多个功能需求,例如 非功能需求可作用于一个或多个功能需求 其中,非功能需求1作用于功能需求1和功能需求3等;非功能需求2作用于功能需求2等。P24 8、有哪几种常用的初始需求发现技术 答:有5种常用的需求发现技术:自悟、交谈、观察、小组会和提炼。P26 9、简述需求规约的3种基本形式。 (1) 非形式化的需求规约。非形式化的需求规约即以一种自然语言来表达需求规约,如同使用一种自然语言写了一篇文章。(2) 半形式化的需求规约。半形式化的需求规约即以半形式化符号体系(包括术语表、标准化的表达格式等)来表达需求规约。(3)形式化的需求规约。形式化的需求规约即以一种基于良构数学概念的符号体系来编制需求规约,一般往往伴有解释性注释的支持。 P29 10、简述软件需求规约的内容和作用。 答:软件需求规约的内容有:引言、总体描述、特定需求、附录、索引。P28 需求规约的作用可概括为以下4点:1)需求规约是软件开发组织和用户之间一份事实上的技术合同书,是产品功能及其环境的体现。2)对于项目的其余大多数工作,需求规约是一个管理控制点。3)对于产品/系统的设计,需求规约是一个正式的、受控的起始点。4)需求规约是创建产品验收测试计划和用户指南的基础。P31 11、简述需求规约在项目开发中的基本作用。 答:需求规约的作用可概括为以下4点:1)需求规约是软件开发组织和用户之间一份事实上的技术合同书,是产品功能及其环境的体现。2)对于项目的其余大多数工作,需求

软件工程习题及答案

软件工程习题及答案

软件工程习题及答案 一、选择题: 1. 为了提高测试的效率,应该。 A、随机地选取测试数据 B、取一切可能的输入数据作为测试数据 C、在完成编码后制定软件的测试计划 D、选择发现错误可能性大的数据作为测试数据 2. 与设计测试数据无关的文档是。 A、需求说明书 B、设计说明书 C、源程序 D、项目开发设计 3. 结构设计是一种应用最广泛的系统设计方法,是以为基础、自顶向下、逐步求精和模块化的过程。 A、数据流 B、数据流图 C、数据库 D、数据结构 4. 概要设计的结果是提供一份。 A、模块说明书 B、框图 C、程序 D、数据结构 5. 需求分析是由分析员经了解用户的要求,认真细致地调研、分析,最终应建立目标系统的逻辑模型并写出。 A、模块说明书 B、软件规格说明书 C、项目开发计划 D、合同文档 6. 注释是提高程序可读性的有效手段,好的程序注释占到程序总量的。 A、1/6 B、1/5 C、1/4 D、1/3 7. 变换型和事务型是程序结构的标准形式。从某处获得数据,再对这些数据作处理,然后将结果送出是属于。 A、变换型 B、事务型 8. PAD(Problem Analysis Diagram)图是一种工具。 A、系统描述 B、详细设计 C、测试 D、编程辅助 9. 分层数据流图是一种比较严格又易于理解的描述方式,它的顶层描绘了系统的。 A、总貌 B、细节 C、抽象 D、软件的作者 10. 数据流图中,当数据流向或流自文件时,。 A、数据流要命名,文件不必命名 B、数据流不必命名,有文件名就足够了 C、数据流和文件均要命名,因为流出和流进数据流是不同的 D、数据流和文件均不要命名,通过加工可自然反映出

软件工程课后习题答案

软件工程课后习题答案 习题1 略。 习题2 略。 习题3 略。 习题4 2.在什么情况下应该使用形式化说明技术?使用形式化说明技术时应遵守哪些准则? 人们在理解用自然语言描述得规格说明时,容易产生二义性。为了克服非形式化方法得缺点,人们把数学引入软件开发工程,创造了基于数学得形式化说明技术。 应用形式化方法得准则: (1)应该选用释放得表示方法; (2)应该形式化,但不要过分形式化; (3)应该估算成本; (4)应该有形式化方法顾问随时提供咨询; (5)不应该放弃传统得开发方法; (6)应该建立详尽得文档; (7)不应该放弃质量标准; (8)不应该盲目依赖形式化方法; (9)应该测试、测试再测试; (10)应该重用。 4.用有穷状态机说明自动化图书馆流通系统

习题5 略。 习题6 略。 习题7 略。 习题8 略。 习题9 1.什么就是面向对象方法学?它有哪些优点? 面向对象方法学,就是尽可能模拟人类习惯得思维方式,使开发软件得方法与过程尽可能接近人类认识世界解决问题得方法与过程,从而使得实现解法得解空间(也称为求解域)与描述问题得问题空间(也称为问题域)在结构上尽可能一致。 优点: 1.与人类习惯得思维方法一致; 2.稳定性好; 3.可重用性好; 4.较易开发大型软件产品; 5.可维护性好 10.建立订货系统得用例模型。 分析如下:从对这个订货系统得需求可以知道,仓库管理员通过放在仓库中得终端把零件入库/出库市事务报告给订货系统,系统接受到事务信息之后应该处理事务;采购员需要使用订货系统提供得产生报表功能,以获取订货报表。综上所述,用例如下: 习题10 1.用面向对象方法分析研究本书习题2第2题中描述得储蓄系统,试建立它得对象模型、动态模型与功能模型。

《软件工程》试题及参考答案(第6套)

第一部分选择题 一、单项选择题(本大题共20小题,每小题1分,共20分) 在每小题列出的四个备选项中只有一个是符合题目要求的,请将其代码填写在题后的括号内。错选、多选或未选均无分。 1、()是软件生存期中的一系列相关软件工程活动的集合,它由软件规格说明、软件设计与开发、软件确认、软件改进等活动组成。 A 软件过程 B 软件工具 C 质量保证 D 软件工程 2、在各种不同的软件需求中,功能需求描述了用户使用产品必须要完成的任务,可以在用例模型或方案脚本中予以说明,()是从各个角度对系统的约束和限制,反映了应用对软件系统质量和特性的额外要求。 A 业务需求 B 功能要求 C 非功能需求 D 用户需求 3、软件测试计划开始于需求分析阶段,完成于()阶段。 A 需求分析 B 软件设计 C 软件实现 D 软件测试 4.下面关于面向对象方法中消息的叙述,不正确的是( )。 A. 键盘、鼠标、通信端口、网络等设备一有变化,就会产生消息 B.操作系统不断向应用程序发送消息,但应用程序不能向操作系统发送消息 C. 应用程序之间可以相互发送消息 D.发送与接收消息的通信机制与传统的子程序调用机制不同 5.美国卡内基—梅隆大学SEI提出的CMM模型将软件过程的成熟度分为5个等级,以下选项中,属于可管理级的特征是( )。 A.工作无序,项目进行过程中经常放弃当初的计划 B.建立了项目级的管理制度 C.建立了企业级的管理制度 D.软件过程中活动的生产率和质量是可度量的 6.在McCall软件质量度量模型中,()属于面向软件产品修改。 A.可靠性B.可重用性C.适应性 D.可移植性 7.软件生命周期中所花费用最多的阶段是() A.详细设计 B.软件编码 C.软件测 试 D.软件维护 8.需求分析阶段的任务是确定() A.软件开发方法 B.软件开发工具 C.软件开发费 D.软件系统的功能

软件工程课后习题(含答案)

第一章练习题 一、填空题 1、软件工程三要素是:方法、工具、过程。 2、软件开发方法是指软件开发过程中所应遵循的方法和步骤。 二、名词(术语)解释: 1、可靠性---是指在给定的时间间隔内,程序成功运行的概率。可靠性是衡量软件质量的一个重要目标。 2、可理解性---指系统具有清晰的结构,能直接反映问题的需求。可理解性有助于控制软件系统的复杂性,并支持软件的维护、移植和重用。 三、问答题 1、面向对象方法的优点是什么? 答:(1)将现实世界问题向面向对象解空间直接映射,实现对现实世界的直接模拟。 (2)以数据为中心,而不是基于对功能的分解,使得软件结构相对稳定,软件的重用性、可靠性、可维护等特性都较好。 2、可视化开发方法的优点有哪些? 答:(1)简化了图形用户界面的设计和编码工作,将开发的注意力主要集中在程序的执行逻辑和工作流程上。 (2)软件开发简单,易学、易上手。 (3)专业或非专业人员都能参与软件开发活动。 第二章练习题 一、填空题: 1、软件工程过程是:为获得软件产品,在软件工具支持下由软件人员完成的一系列软件工 程活动。 2、一个软件从定义、开发、使用和维护,直到最终被废弃,所经历的生存过程经历的生存过程称为软件生存期或叫生命期。 3、软件生命周期的阶段划分为3个时期是:定义时期、开发时期、维护时期。 4、软件工程标准的5个层次是:国际标准、国家标准、行业标准、企业规范、项目规范。 二、简答题: 1、瀑布模型的优点有哪些? 答:1、强迫开发人员采用规范的技术方法; 2、严格地规定了每个阶段必须提交的文档; 3、每个阶段结束前必须正式进行严格的技术审查和管理复审。 2、瀑布模型的缺点是什么? 答:1、在软件开发的初期阶段就要求做出正确、全面、完整的需求分析对许多应用软件来说是极其困难的。 2、在需求分析阶段,当需求确定后,无法及时验证需求是否正确、完整。 3、作为整体开发的瀑布模型,由于不支持产品的演化,缺乏灵活性,对开发过程中很 难发现的错误,只有在最终产品运行时才能暴露出来,从而使软件产品难以维护。

软件工程试题及答案

综合练习一答案 一.选择题: 1.软件危机出现于____,为了解决软件危机,人们提出了用____的原理来设计软件,这是软件工程诞生的基础。 A.50年代末 B.60年代初C.60年代末 D.70年代初 A.运筹学B.工程学 C.软件学 D.软件学 E.数字 2.开发软件需高成本和产品的低质量之间有着尖锐的矛盾,这种现象称作____。 A.软件投机B.软件危机C.软件工程D.软件产生 3.产生软件危机的原因有如下几点,除了______。 A、软件开发过程未经审查 B、软件开发不分阶段,开发人员没有明确的分工 C、所开发的软件,除了程序清单外,没有其他文档 D、采用工程设计的方法开发软件,不符合软件本身的特点 4.软件工程学是应用科学理论和工程上的技术指导软件开发的学科,其目的是____。 A.引入新技术提高空间利用率B.用较少的投资获得高质量的软件 C.缩短研制周期扩大软件功能D.硬软件结合使系统面向应用 5.请按顺序写出软件生命期的几个阶段____,____ ,____,____,____,____。 A.维护 B.测试 C.详细设计 D.概要设计 E.编码 F.需求分析6.瀑布模型把软件生存周期划分为软件定义、软件开发和____三个阶段,而每一阶段又可细分为若干个更小的阶段。 A.详细设计B.可行性分析C.运行及维护D.测试与排错7.划分软件生存周期的阶段时所应遵循的基本原则是_____。 A、各阶段的任务尽可能相关性 B、各阶段的任务尽可能相对独立 C、各阶段的任务在时间上连续 D、各阶段的任务在时间上相对独立 8.一个软件项目是否进行开发的结论是在______文档中作出的。 A、软件开发计划 B、可行性报告 C、需求分析说明书 D、测试报告 9.分析员是____。 A.用户中系统的直接使用者B.用户和软件人员的中间人 C.软件的编程人员 D。用户和软件人员的领导 10.下列叙述中,_______不属于数据字典的作用。 A、作为编码阶段的描述工具 B、为用户与开发人员之间统一认识 C、作为概要设计的依据 D、为需求分析阶段定义各类条目 11.使用结构化分析方法时,采用的基本手段是____。 A.分解和抽象 B.分解和综合C.归纳与推导D.试探与回溯12.结构化系统分析主要是通过____进行分析的。 A.算法分解B.控制结构分解 C.数据结构分解D.处理功能分解13.分层数据流图是一种比较严格又易于理解的描述方式,它的顶层描述了系统的____。 总貌B.细节C.抽象D.软件的作者 13.变换型和事务型是程序结构的标准形式。从某处获得数据,再对这些数据作处理,然后将结果送出是属于____。 A.变换型 B 事务型 14.需求分析说明书不能作为______。

软件工程试题及答案(B)

B卷 一、选择题(每题2分,共40分) 1.软件项目的可行性研究要进行一次( C )需求分析。 A.详细的B.全面的C.简化的、压缩的D.彻底的 2、系统流程图用于可行性分析中的( A )的描述。 A.当前运行系统B.当前逻辑模型C.目标系统D.新系统 3、程序的三种基本控制结构的共同特点是( D ) A.不能嵌套使用B.只能用来写简单程序 C.已经用硬件实现D.只有一个入口和一个出口 4、维护中,因误删除一个标识符而引起的错误是( C )副作用。 A.文档B.数据C.编码D.设计 5、( D )是以提高软件质量为目的的技术活动。 A.技术创新B.测试C.技术创造D.技术评审 6、面向对象方法学的出发点和基本原则是尽可能模拟人类习惯的思维方式,分析、设计和 实现一个软件系统的方法和过程,尽可能接近于人类认识世界解决问题的方法和过程。因此面向对象方法有许多特征,如软件系统是由对象组成的;( C );对象彼此之间仅能通过传递消息互相联系;层次结构的继承。 A.开发过程基于功能分析和功能分解B.强调需求分析重要性 C.把对象划分成类,每个对象类都定义一组数据和方法D.对既存类进行调整 7、原型化方法是用户和设计者之间执行的一种交互构成,适用于( A )系统。 A.需求不确定性高的B.需求确定的C.管理信息D.实时 8、为了提高测试的效率,应该( D )。 A.随机地选取测试数据B.取一切可能的输入数据作为测试数据

C.在完成编码以后制定软件的测试计划D.选择发现错误可能性大的数据作为测试数据 9、使用白盒测试方法时,确定测试数据应根据( A )和指定的覆盖标准。 A.程序的内部逻辑B.程序的复杂结构C.使用说明书D.程序的功能 10、开发软件所需高成本和产品的低质量之间有着尖锐的矛盾,这种现象称做( C ) A.软件工程 B.软件周期 C.软件危机 D.软件产生 11、软件按照设计的要求,在规定时间和条件下达到不出故障,持续运行的要求的质量特性 称为( B )。 A.可用性 B.可靠性 C.正确性 D.完整性 12、瀑布模型的关键不足在于( B ) A.过于简单 B.不能适应需求的动态变更 C.过于灵活 D.各个阶段需要进行评审 13、软件维护的副作用主要有以下哪几种( C ) A.编码副作用、数据副作用、测试副作用 B.编码副作用、数据副作用、调试副作用 C.编码副作用、数据副作用、文档副作用 D.编码副作用、文档副作用、测试副作用 14、在下面的软件开发方法中,哪一个对软件设计和开发人员的开发要求最高( B)。 A、结构化方法 B、原型化方法 C、面向对象的方法 D、控制流方法 15、软件工程方法学的目的是:使软件生产规范化和工程化,而软件工程方法得以实施的主 要保证是( C)。 A、硬件环境 B、软件开发的环境 C、软件开发工具和软件开发的环境 D、开发人员的 素质 16、软件开发模型是指软件开发的全部过程、活动和任务的结构框架。主要的开发模型有瀑 布模型、演化模型、螺旋模型、喷泉模型和智能模型。螺旋模型将瀑布模型和演化模型相结合,并增加了(1),它建立在(2)的基础上,沿着螺线自内向外每旋转一圈,就得到(2)的一个新版本。喷泉模型描述了(3)的开发模型,它体现了这种开发方法创建软件的过程所固有的(4)和(5)的特征。 B(1) A、系统工程 B、风险分析 C、设计评审 D、进度控制 D(2) A、模块划分 B、子程序分解 C、设计; D、原型 A(3) A、面向对象 B、面向数据流 C、面向数据结构 D、面向事件驱动 D(4) A、归纳 B、推理 C、迭代 D、递归 A(5) A、开发各阶段之间无“间隙” B、开发各阶段分界明显 C、部分开发阶段分界明显 D、开发过程不分段 二、判断题(每题2分,共30分) 1.螺旋模型是在瀑布模型和增量模型的基础上增加了风险分析活 动。( T ) 2.数据字典是对数据流图中的数据流,加工、数据存储、数据的源和终点进行详细定义。 ( F ) 3.JAVA语言编译器是一个CASE工具。( T )。

软件工程试题库集及答案

综合练习一答案 选择题: 1.软件危机出现于____,为了解决软件危机,人们提出了用____的原理来设计软件,这是软件工程诞生的基础。 A.50年代末B.60年代初C.60年代末D.70年代初 A.运筹学B.工程学C.软件学D.软件学E.数字2.开发软件需高成本和产品的低质量之间有着尖锐的矛盾,这种现象称作____。 A.软件投机B.软件危机C.软件工程D.软件产生 3.产生软件危机的原因有如下几点,除了______。 A、软件开发过程未经审查 B、软件开发不分阶段,开发人员没有明确的分工 C、所开发的软件,除了程序清单外,没有其他文档 D、采用工程设计的方法开发软件,不符合软件本身的特点 4.软件工程学是应用科学理论和工程上的技术指导软件开发的学科,其目的是____。 A.引入新技术提高空间利用率B.用较少的投资获得高质量的软件 C.缩短研制周期扩大软件功能D.硬软件结合使系统面向应用5.请按顺序写出软件生命期的几个阶段____,____ ,____,____,____,____。 A.维护B.测试C.详细设计D.概要设计E.编码F.需求分析6.瀑布模型把软件生存周期划分为软件定义、软件开发和____三个阶段,而每一阶段又可细分为若干个更小的阶段。 A.详细设计B.可行性分析C.运行及维护D.测试与排错7.划分软件生存周期的阶段时所应遵循的基本原则是_____。 A、各阶段的任务尽可能相关性 B、各阶段的任务尽可能相对独立 C、各阶段的任务在时间上连续 D、各阶段的任务在时间上相对独立 8.一个软件项目是否进行开发的结论是在______文档中作出的。 A、软件开发计划 B、可行性报告 C、需求分析说明书 D、测试报告 9.分析员是____。 A.用户中系统的直接使用者B.用户和软件人员的中间人 C.软件的编程人员D。用户和软件人员的领导

软件工程课后习题答案

软件工程课后习题答案 第一章 一、什么是软件危机?它有哪些典型表现?为什么会出现软件危机? 软件危机是指在计算机软件开发、使用与维护过程中遇到的一系列严重问题和难题。它包括两方面:如何开发软件,已满足对软件日益增长的需求;如何维护数量不断增长的已有软件。软件危机的典型表现: (1) 对软件开发成本和进度的估计常常很不准确。常常出现实际成本比估算成本高出一个数量级、实际进度比计划进度拖延几个月甚至几年的现象。而为了赶进度和节约成本所采取的一些权宜之计又往往损害了软件产品的质量。这些都降低了开发商的信誉,引起用户不满。 (2) 用户对已完成的软件不满意的现象时有发生。 (3) 软件产品的质量往往是靠不住的。 (4) 软件常常是不可维护的。 (5) 软件通常没有适当的文档资料。文档资料不全或不合格,必将给软件开发和维护工作带来许多难以想象的困难和难以解决的问题。

(6) 软件成本、软件维护费在计算机系统总成本中所占比例逐年上升。 (7) 开发生产率提高的速度远跟不上计算机应用普及的需求。软件危机出现的原因: (1) 来自软件自身的特点:是逻辑部件,缺乏可见性;规模庞大、复杂,修改、维护困难。 (2) 软件开发与维护的方法不当:忽视需求分析;认为软件开发等于程序编写;轻视软件维护。 (3) 供求矛盾将是一个永恒的主题:面对日益增长的软件需求,人们显得力不从心。 二、假设自己是一家软件公司的总工程师,当把图1.1给手下的软件工程师们观看,告诉他们及时发现并改正错误的重要性时,有人不同意这个观点,认为要求在错误进入软件之前就清楚它们是不现实的,并举例说:“如果一个故障是编码错误造成的,那么,一个人怎么能在设计阶段清除它呢?”应该怎么反驳他? 答:在软件开发的不同阶段进行修改付出的代价是很不相同的,在早期引入变动,涉及的面较少,因而代价也比较低;在开发的中期,软件配置的许多成分已经完成,引入一个变动要对所有已完成的配置成分都做相应的修改, 不仅工作量大,而且逻辑上也更复杂,因此付出的代价剧增;在软件“已经完成”是在引入变动,当然付出的代价更高。一个故障是代码错误造成的,有时这种错误是不可避免的,但要修改的成本是很小的,因为这不是整体构架的错误。

《软件工程》复习题及答案

软件工程复习题 一、选择题: 1.开发软件所需高成本和产品的低质量之间有着尖锐的矛盾,这种现象称做(C)。 A.软件工程 B.软件周期 C.软件危机 D.软件产生 2.瀑布模型本质上是一种(A )模型。 A.线性顺序 B.顺序迭代 C.线性迭代 D.早期产品 3.瀑布模型存在的问题是(B )。 A.用户容易参与开发 B.缺乏灵活性C.用户与开发者易沟通 D.适用可变需求 4.螺旋模型是一种将瀑布模型和(A)结合起来的软件开发模型。 A.增量模型B.专家系统C.喷泉模型D.变换模型 5.原型化方法是用户和设计者之间执行的一种交互构成,适用于(A)系统。 A.需求不确定性高的 B.需求确定的C.管理信息 D.实时 6.下列有关软件工程的标准,属于国际标准的是(C ) A.GB B.ANSI C.ISO D.IEEE 7.结构化方法是一种基于(D)的方法。 A.数据结构 B.程序结构 C.算法 D.数据流 8.软件可行性研究实质上是要进行一次( A)需求分析、设计过程。 A、简化、压缩的 B、详细的 C、彻底的 D、深入的 9.可行性研究的目的是(D) A、分析开发系统的必要性 B、确定系统建设的方案 C、分析系统风险 D、确定是否值得开发系统 10.可行性研究是在(A)之前 A、系统开发 B、测试 C、试运行 D、集成测试 11.可行性研究需要的时间长短取决于系统的规模,一般来说,可行性研究的成本只是预期总成本的 (C)。 A、1% B、20% C、8% D、50% 12.我国正式颁布实施的(B)对计算机病毒的定义具有法律性、权威性。 A.《计算机软件保护条例》 B.《中华人民共和国计算机信息系统安全保护条例》 C.《中华人民共和国著作权法》 D.《计算机病毒防治管理办法》 13.效率是一个性能要求,因此应当在以下哪个阶段规定?B A、可行性分析 B、需求分析 C、概要设计 D、详细设计 14.需求规格说明书的作用不包括(D) A、软件验收的依据 B、用户与开发人员对软件要做什么的共同理解 C、软件可行性研究的依据 D、软件设计的依据 15.数据字典是用来定义(D)中的各个成份的具体含义的。 A、程序流程图 B、功能结构图 C、系统结构图 D、数据流程图 16.数据流程图是(A)方法中用于表示系统逻辑模型的一种图形工具。 A、SA B、SD C、SP D、SC 17.DFD中的每个加工至少有(A)。 A、一个输入流或一个输出流 B、一个输入流和一个输出流 C、一个输入流 D、一个输出流 18.需求分析阶段的关键任务是确定(D) A、软件开发方法 B、软件开发工具 C、软件开发费 D、软件系统的功能 19.在SD方法中全面指导模块划分的最重要的原则是(D)。 A、程序模块化 B、模块高内聚 C、模块低耦合 D、模块独立性

软件工程考试试题(含答案)

一、填空题(每空1分,共25分) 1.软件生存周期一般可以划分为,问题定义、____________、____________、设计、 编码、测试和____________。 2.基于软件的功能划分,软件可以划分成__________、__________、__________三种。 3.可行性研究,应从、技术可行性、运行可行性、和开 放方案可行性等方面研究。 4.系统流程图是描绘的传统工具。它的基本思想是用图形符号以 描绘系统里面的每个部件。 5.数据流图的基本四种成分:数据输入的源点和数据输出汇点、、 和。 6.结构化分析方法是面向________________进行需求分析的方法。结构化分析方法使 用________________与________________来描述。 7.是自动地共享类、子类和对象中的方法和数据的机制。 8.软件详细设计工具可分为3类,即________________、________________和 ________________。 9.为了在软件开发过程中保证软件的质量,主要采取下述措施:________________、 复查和管理复审、________________。 10.大型软件测试包括、、确认测试和 四个步骤。 1、可行性研究需求分析运行与维护 2、系统软件支撑软件应用软件 3、经济可行性法律可行性 4、物理系统黑盒子形式 5、加工数据流数据存储文件 6、数据流数据流图DFD 数据字典DD 7、继承性 8、图示工具、设计语言表格工具 9、审查测试 10、单元测试集成测试系统测试 二、单项选择题(每小题2分,共20分) 1 2 3 4 5 C C C A C 6 7 8 9 10 D D A C B 1.软件设计中划分模块的一个准则是()。 A、低内聚低耦合 B、低内聚高耦合 C、高内聚低耦合 D、高内聚高耦合 2.Jackson设计方法是由英国的M. Jackson提出的,它是一种面向()的软件 设计方法。

软件工程课后习题答案第五版

软件工程课后习题答案第五版 《软件工程导论》课后习题答案 第一章软件工程概论 1.什么是软件危机? 软件危机是指在计算机软件的开发和维护过程中所遇到的一系列严重问题。这些问题表现在以下几个方面: (1)用户对开发出的软件很难满意。 (2)软件产品的质量往往靠不住。 (3)一般软件很难维护。 (4)软件生产效率很低。 (5)软件开发成本越来越大。 (6)软件成本与开发进度难以估计。

(7)软件技术的发展远远满足不了计算机应用的普及与深入的需要。 2.为什么会产生软件危机? (1) 开发人员方面,对软件产品缺乏正确认识,没有真正理解软件产品是一个完整的配置组成。造成开发中制定计划盲目、编程草率,不考虑维护工作的必要性。 (2) 软件本身方面,对于计算机系统来说,软件是逻辑部件,软件开发过程没有统一的、公认的方法论和规范指导,造成软件维护困难。 (3) 尤其是随着软件规模越来越大,复杂程度越来越高,原有软件开发方式效率不高、质量不能保证、成本过高、研制周期不易估计、维护困难等一系列问题更为突出,技术的发展已经远远不能适应社会需求。 3.怎样克服软件危机? (1) 充分吸收和借鉴人类长期以来从事各种工程项目中积累的行之有效的有效原理、概念、技术与方法,特别是吸取几十年来人类从事计算机硬件研究和开发的经验教训。在开发软件的过程中努力作到良好的组织,严格的管理,相互友好的协作。

(2) 推广在实践中总结出来的开发软件的成功的技术和方法,并研究更好、更有效的技术和方法,尽快克服在计算机系统早期发展阶段形成的一些错误概念和作法。 (3) 根据不同的应用领域,开发更好的软件工具并使用这些工具。将软件开发各个阶段使用的软件工具集合成一个整体,形成一个很好的软件开发支环环境。 总之为了解决软件危机,既要有技术措施(方法和工具),又要有必要的组织管理措施。 4.构成软件项目的最终产品: 应用程序、系统程序、面向用户的文档资料和面向开发者的文档资料。 5.什么是软件生存周期? 软件生存周期是指从软件定义、开发、使用、维护到淘汰的全过程。 6.软件生存周期为什么划分成阶段? (1) 任何一个阶段的具体任务不仅独立,而且简单,便于不同人员分工协作,从而降低整个软件开发工作的困难程度。

软件工程课后习题答案

第一章 一、什么是软件危机?它有哪些典型表现?为什么会出现软件危机? 软件危机是指在计算机软件开发、使用与维护过程中遇到的一系列严重问题和难题。它包括两方面:如何开发软件,已满足对软件日益增长的需求;如何维护数量不断增长的已有软件。 软件危机的典型表现: (1) 对软件开发成本和进度的估计常常很不准确。常常出现实际成本比估算成本高出一个数量级、实际进度比计划进度拖延几个月甚至几年的现象。而为了赶进度和节约成本所采取的一些权宜之计又往往损害了软件产品的质量。这些都降低了开发商的信誉,引起用户不满。 (2) 用户对已完成的软件不满意的现象时有发生。 (3) 软件产品的质量往往是靠不住的。 (4) 软件常常是不可维护的。 (5) 软件通常没有适当的文档资料。文档资料不全或不合格,必将给软件开发和维护工作带来许多难以想象的困难和难以解决的问题。 (6) 软件成本、软件维护费在计算机系统总成本中所占比例逐年上升。 (7) 开发生产率提高的速度远跟不上计算机应用普及的需求。 软件危机出现的原因: (1) 来自软件自身的特点:是逻辑部件,缺乏可见性;规模庞大、复杂,修改、维护困难。 (2) 软件开发与维护的方法不当:忽视需求分析;认为软件开发等于程序编写;轻视软件维护。 (3) 供求矛盾将是一个永恒的主题:面对日益增长的软件需求,人们显得力不从心。 二、假设自己是一家软件公司的总工程师,当把图1.1给手下的软件工程师们观看,告诉他们及时发现并改正错误的重要性时,有人不同意这个观点,认为要求在错误进入软件之前就清楚它们是不现实的,并举例说:“如果一个故障是编码错误造成的,那么,一个人怎么能在设计阶段清除它呢?”应该怎么反驳他? 答:在软件开发的不同阶段进行修改付出的代价是很不相同的,在早期引入变动,涉及的面较少,因而代价也比较低;在开发的中期,软件配置的许多成分已经完成,引入一个变动要对所有已完成的配置成分都做相应的修改, 不仅工作量大,而且逻辑上也更复杂,因此付出的代价剧增;在软件“已经完成”是在引入变动,当然付出的代价更高。一个故障是代码错误造成的,有时这种错误是不可避免的,但要修改的成本是很小的,因为这不是 整体构架的错误。 三、什么是软件工程?它有哪些本质特征?怎样用软件工程消除软件危机? 1993年IEEE的定义:软件工程是:①把系统的、规范的、可度量的途径应用于软件开发、运行和维护过程,也就是把工程应用于软件;②研究①中提到的途径。 软件工程的本质特征: (1) 软件工程关注于大型程序(软件系统)的构造(2) 软件工程的中心课题是分解问题,控制复杂性(3) 软件是经常变化的,开发过程中必须考虑软件将来可能的变化 (4) 开发软件的效率非常重要,因此,软件工程的一个重要课题就是,寻求开发与维护软件的更好更有效的方法和工具 (5) 和谐地合作是开发软件的关键(6) 软件必须有效地支持它的用户 (7) 在软件工程领域中是由具有一种文化背景的人替具有另一种文化背景的人(完成一些工作)消除软件危机的途径: (1) 对计算机软件有一个正确的认识(软件≠程序) (2) 必须充分认识到软件开发不是某种个体劳动的神秘技巧,而应该是一种组织良好、管理严密、各类人员协同配合、共同完成的工程项目 (3) 推广使用在实践中总结出来的开发软件的成功技术和方法 (4) 开发和使用更好的软件工具

软件工程试题及答案

1. 软件生命期各阶段的任务是什么? 答:软件生命期分为7个阶段: 1、问题定义:要解决的问题是什么 2、可行性研究:确定问题是否值得解,技术可行性、经济可行性、操作可行性 3、需求分析:系统必须做什么 4、总体设计:系统如何实现,包括系统设计和结构设计 5、详细设计:具体实现设计的系统 6、实现:编码和测试 7、运行维护:保证软件正常运行。 2、软件重用的效益是什么? 答:1、软件重用可以显著地改善软件的质量和可靠性。 2、软件重用可以极大地提高软件开发的效率。 3、节省软件开发的成本,避免不必要的重复劳动和人力、财力的浪费。 3、自顶而下渐增测试与自底而上渐增测试各有何优、缺点? 答: ①自顶而下渐增测试 优点:不需要测试驱动程序,能够在测试阶段的早期实现并验证系统的主要功能,而且能够尽早发现上层模块的接口错误。 缺点:需要存根程序,底层错误发现较晚。 ②自底而上渐增测试 优点与缺点和自顶而下渐增测试相反。 4 、提高可维护性的方法有哪些? 答:在软件工程的每一阶段都应该努力提高系统的可维护性,在每个阶段结束前

的审查和复审中,应着重对可维护性进行复审。 在需求分析阶段的复审中,应对将来要扩充和修改的部分加以注明。在讨论软件可移植性问题时,要考虑可能要影响软件维护的系统界面。 在软件设计的复审中,因从便于修改、模块化和功能独立的目标出发,评价软件的结构和过程,还应对将来可能修改的部分预先做准备。 在软件代码复审中,应强调编码风格和内部说明这两个影响可维护性的因素。 在软件系统交付使用前的每一测试步骤中都应给出需要进行预防性维护部分的提示。 在完成每项维护工作后,都应对软件维护本身进行仔细认真的复审。 为了从根本上提高软件系统的可维护性,人们正试图通过直接维护软件规格说明来维护软件,同时也在大力发展软件重用技术。 简述软件测试要经过哪几个步骤,每个步骤与什么文档有关。 【解答】 测试过程按 4 个步骤进行,即单元测试(模块测试)、集成测试(子系统测试和系统测试)、确认测试(验收测试)和平行运行。 单元测试集中对用源代码实现的每一个程序单元进行测试,与其相关的文档是单元测试计划和详细设计说明书。 集成测试把已测试过的模块组装起来,主要对与设计相关的软件体系结构的构造进行测试。与其相关的文档是集成测试计划和软件需求说明书。 确认测试则是要检查已实现的软件是否满足了需求规格说明中确定了的各种需求,以及软件配置是否完全、正确。与其相关的文档是确认测试计划和软件需求说明书。 平行运行把已经经过确认的软件纳入实际运行环境中,与其他系统成份组合在一起进行测试。与其相关的文档:用户指南、使用手册等。 36.简述容错技术的四种主要手段,并解释。

软件工程课后参考答案

第一章课后参考答案 1.什么是软件危机?它们有哪些典型表现?为什么会出现软件危机? “软件危机”是指计算机软件的“开发”和“维护”过程中所遇到的一系列“严重问题”。这些问题决不仅仅是不能正常运行的软件才具有的,实际上,几乎“所有软件”都不同程度地存在这些问题。 它们有以下表现: (1)对软件开发成本和进度的估计常常很不准确; (2)用户对“已完成的”软件系统不满意的现象经常发生; (3)软件产品的质量往往靠不住; (4)软件常常是不可维护的; (5)软件通常没有适当的文档资料; (6)软件成本在计算机系统总成本中所占的比例逐年上升; (7)软件开发生产率提高的速度,远远跟不上计算机应用普及深入的趋势。 出现软件危机的主要原因 (1)与软件本身的特点有关 (2)与软件开发和维护过程中使用的方法不正确有关

2.假设自己是一家软件公司的总工程师,当把图1.1给手下的软件工程师们观看,告诉他们及时发现并改正错误的重要性时,有人不同意这个观点,认为要求在错误进入软件之前就清楚它们是不现实的,并举例说:“如果一个故障是编码错误造成的,那么,一个人怎么能在设计阶段清除它呢?”应该怎么反驳他? 答:在软件开发的不同阶段进行修改付出的代价是很不相同的,在早期引入变动,涉及的面较少,因而代价也比较低;在开发的中期,软件配置的许多成分已经完成,引入一个变动要对所有已完成的配置成分都做相应的修改,不仅工作量大,而且逻辑上也更复杂,因此付出的代价剧增;在软件“已经完成”时在引入变动,当然付出的代价更高。一个故障是代码错误造成的,有时这种错误是不可避免的,但要修改的成本是很小的,因为这不是整体构架的错误。 3.什么是软件工程?它有哪些本质特征?怎么用软件工程消除软件危机? 软件工程是指导知道计算机软件开发和维护的一门工程学科。采用工程的概念、原理、技术和方法来开发与维护软件,把经过时间考验而证明正确的管理技术和当前能够得到的最好技术方法结合起来,以经济地开发出高质量的软件并有效地维护它,这就是软件工程。 本质特征: (1)软件工程关注于大型软件的构造 (2)软件工程的中心课题是控制复杂性 (3)软件经常变化

相关文档
相关文档 最新文档