Zaoxu Zhu Faculty of Aerospace Engineering, Delft University of Technology PhD candidate Kluyverweg 1, 2629 HS Delft, the Netherlands z.zhu@tudelft.nl G. La Rocca (Faculty of Aerospace Engineering, Delft University of Technology), M.J.L. van Tooren (College of Engineering and Computing Ronald E. McNAIR Centre for Aerospace Innovation and Research, University of South Carolina)
ABSTRACT Harness 3D routing in aircraft Electrical Wiring Interconnection System (EWIS) design is very complex because of both the intrinsic complexity of EWIS and the increasing number of design constraints. The complexity hinders the improvement of the design efficiency and makes the design error prone. Considering that many harness components are selected from catalogues and the design work is largely repetitive and mostly rule based, there are many opportunities to automate a significant part of the design process. Nevertheless, none or very limited solutions to automate the 3D routing have been found. Aiming for the automation of harness 3D routing, in this research, an innovative approach has been proposed that models and solves the 3D routing problem as an optimization problem. The challenge to solve above optimization problem is that the number of design variables, namely the number of clamping points, is not known a priori. The number is actually an output of the 3D routing. In order to handle this challenge, a two-step, hybrid optimization strategy has been devised. The first step, called Initialization, generates a preliminary harness definition using a road map based path finding method without knowing the number of design variables. The second step, called Optimization uses conventional optimization method to refine the preliminary harness definition while satisfying all design constraints. This approach has been implemented into a software application and several cases have been executed to validate the system functionality. The results have demonstrated that the tool is capable of handling cases of representative complexity and design constraints and deliver 3D harness models in full automation. 1 DESIGN CHALLENGES IN THE DEVELOPMENT OF THE AIRCRAFT ELECTRICAL WIRING INTERCONNECTION SYSTEMS
The Electrical Wiring Interconnection System (EWIS) is a very complex system due to the inconnection requirements of aircraft avionics. The EWIS of the A380 (Figure 1), for example, contains 530km of cables, 100,000 wires and 40,300 connectors[2]. The complexity of the EWIS is deemed to further increase in new generation More-Electrical-Aircraft (MEA) and Full-Electrical-Aircraft (FEA) [3]. Significant advances in the design method of such a system are necessary, not only to efficiently address the growing amount of electronic systems to be interconnected, but also to comply with the growing amount of safety constraints stipulated by Certification Figure 1: Part of the Airbus A380[1] Authorities[4]. [1] The EWIS design process (see flow chart in Figure 2), consists of two main phases, generally addressed as electrical design and the physical design. In the electric design phase, the power and data signal interconnection between the various electronic components is defined; in the second phase the actual routing of the many wire harnesses is developed. The physical design can be divided further into three activities, namely Space Reservation, Main Routing Architecture design and 3D Routing. During the Space Reservation step, space is reserved in the aircraft to allow routing and integration of the EWIS. In this phase, EWIS designers
CEAS 2015 paper no. 138 Page | 1 This work is licensed under the Creative Commons Attribution International License (CC BY). Copyright ? 2015 by author(s).

and other designers responsible for the integration of other systems (e.g., air conditioning and antiicing) compete for the scarce space available on the aircraft for EWIS routes. The outcome of the Main Routing Architecture (MRA) design is the definition of the so-called motor way network (i.e. MRA) which designates the preliminarily routes to connect the main aircraft systems. In the 3D Routing phase the actual harnesses models are generated inside the aircraft Digital Mock-Up (DMU), making use of the reserved space and MRA, in order to connect the various systems according to the electrical definition established in the electrical design phase. The 3D routing of wire harnesses is particularly complex, not only because of the intrinsic complexity of the EWIS system, but also because of the sheer amount of design requirements to be respected (e.g. no go areas, areas requiring special cables Figure 2: Overview of the EIWS design (bottom) in the overall protections, allowable aircraft development process (top) bend radius of cables, allowed structure to clamp the harness, etc.), and the frequent changes in the aircraft structure that might force the designers, for example, to reconsider the position of some attachment points, or even define new routes because of reduced space availability. Due to the limited time allocated to perform their work and the frequent last minutes changes, wire harness designers work under high pressure and their work, which is still mostly manual (supported by Computer Aid Design (CAD) systems), is prone to errors. The methodology proposed in this paper addresses specifically this critical phase in the physical design process. Considering the fact that a large amount of harness components are selected from catalogues and that the nature of the wire harness design work is largely repetitive and mostly rule based, there are a lot of opportunities to automate the design process, thus releasing design engineers from lengthy and repetitive work and potentially increasing their creativity. A number of researchers [5-9] have focused on the automation of EWIS design. However, none or very limited solutions to automate the 3D routing part of the EWIS design process have been found. Also the current leading Mechanical CAD (MCAD) tools used in industry are not able to generate wire harness 3D models automatically and still demand a lot of manual work by expert designers. 2 KNOWLEDGE BASED ENGINEERING AND MULTIDISCIPLINARY DESIGN OPTIMIZATION TO AUTOMATE 3D ROUTING OF WIRE HARNESSES
This paper proposes a novel methodology to address the 3D routing challenges discussed in Section 1. In particular the proposed methodology aims at the following two main objectives: 1. Automate the generation of the 3D wire harness models, by capturing and systematically reusing the experts’ knowledge; 2. Automatically update wire harness models when changes occur, either in the routing environment, or in the electrical design phase of the EWIS. The proposed approach is based on the hypothesis that solving the routing problem is equivalent to solving an optimization problem. In this case, the objective function to minimize represents a cost function that accounts for both the total cost of the wire harness and the cost of the protection layers and support components required to route the harness in area with harsh environment (heat, vibration, etc.). The design variables represent the position of the various clamping points where the cables are fixed to the aircraft structure. The reader can imagine the position of these clamping points as the waypoints in a GPS route planner. The various design rules, such as minimum allowed
CEAS 2015 paper no. 138 Page | 2 This work is licensed under the Creative Commons Attribution International License (CC BY). Copyright ? 2015 by author(s).

bend radius, maximum distance between contiguous clamping points, and minimum distance between cable and support structure, can be formulated as constraints for the optimization problem. The technical implementation of the proposed approach is built on a combination of Knowledge Based Engineering (KBE)[10] and Multidisciplinary Design Optimization (MDO)[11] technologies. KBE technology is exploited to capture the typical rule-based approach of the wire harness design and to enable the automation of all the geometry manipulations and checks required to perform the routing task. MDO is used to systematically explore the large design space provided by the 3D routing problem, to discover minimum cost solutions that comply with the multitude of design constraints. Section 3 of this paper provides an overview of the EWIS architecture and the main design rules involved in wire harness routing. Sections 4 to 6 describe the actual definition of the optimization problem and its technical implementation. In Section 7 examples are provided that demonstrate the capability of the proposed approach to meet the two set objectives. 3 DESCRIPTION OF AIRCRAFT EWIS AND 3D ROUTING RULES
Subsection 3.1 provides a description of the aircraft EWIS and clarifies the focus area of the proposed methodology. Subsection 3.2 provides details on the design rules and checks to be applied during 3D routing. Both subsections introduce the terminology that is then used in the formulation of the optimization problem. 3.1 Description of the aircraft EIWS
The aircraft EWIS is a large and complex system that propagates through almost every part of the airframe and the engines. To facilitate manufacturing and installation, it is designed as a set of separate harnesses, which, during assembly, are connected at the so called production breaks points. The Figure 3: Hierarchical structure of the EWIS way the EWIS is split into different sets of harnesses strongly depends on the zones of the aircraft where the EWIS is routed. These zones are called wiring zones and differ from each other because of their environmental conditions, such as heat, vibration, and moisture. As consequence, each wiring zone demands different design rules. In practice, each wiring zone is independent from the others for what concerns the Figure 4: Examples of wire harnesses and their main design and installation process. components The earlier mentioned
CEAS 2015 paper no. 138 Page | 3 This work is licensed under the Creative Commons Attribution International License (CC BY). Copyright ? 2015 by author(s).

production breaks represent the only interface between the adjacent zones. The production breaks are predefined and generally not modified during the 3D routing process. Each wiring zone includes one or more harnesses, which connect the production breaks and the pieces of equipment installed in the given zone. Each wire harness is generally divided further into branches, components, and sub-components, as illustrated in the EWIS hierarchy structure shown in Figure 3 and the two annotated examples in Figure 4. A wire harness can contain one or more branches; each branch contains one bundle, and may include one or two connectors, protection layers, and some clamps; each bundle contains one or more wires, where electrical or data signals are transmitted. The points where more branches converge or split into multiple branches on a wire harness are called break-out points. When break-outs are present, it means the given harness has multiple origins and/or multiple destinations. As a consequence, a branch is defined as a part of a harness that locates between two break-outs or a break-out and a connector (including the connector). 3.2 The 3D routing rules
The 3D routing process is constrained by many design rules. Some of these design rules are described in the design specifications issued by the authorities to guarantee the safety of the aircraft; others have been developed by wire harness manufactures themselves, on the basis of experience and best practice. A subset of these rules has been selected in this research to prove the feasibility of the proposed approach for automatic 3D routing. The selected subset is representative of the various categories of rules and does not compromise the scalability of the proposed approach. These include the rules to check allowed bending radii, to check the geometry collision and maintain geometry attraction, for the definition of the clamping system, and for routing in critical wiring zones (in presence of heat sources or high flammability risk). All these rules are discussed in some detail in the following sub-sections. ..3.2.1 Bend radius violation check
A wire bundle or a cable must be bent within its allowed limits to avoid damage. The minimum allowed bend radius of a wire bundle is determined by the product of its diameter and allowed bend radius ratio, namely × . is the bundle diameter and ? is the allowed bend radius ratio, which mainly depends on the bundle material. The principle to select the bend radius ratio can be found in design specifications MIL-W-5088L[12] and Aircraft EWIS Best Practices[13]. The bend radius violation free of a bundle could be represented by an inequation ≥ × . is the minimum bend radius of the bundle centre curve. ..3.2.2 Collision checks and geometry attraction rules
When routing wire harnesses inside a wiring zone, it is necessary to check for three types of collisions: 1) collision between the harness and aircraft components, 2) collision between different branches of the same harness, and 3) collision Figure 5: Examples of three types of collision: (1) between harness and between the given harness geometry structure, (2) between branches of the same harness, (3) and previously generated between harnesses in the same wiring zone harnesses. Examples are illustrated in Figure 5. None of these three types of collisions is allowed. During 3D routing, harnesses have to be fixed to the airframe by means of some clamping device (from here on addressed as clamp). Indeed not all airframe components are suitable or allowed to
CEAS 2015 paper no. 138 Page | 4 This work is licensed under the Creative Commons Attribution International License (CC BY). Copyright ? 2015 by author(s).

be clamped. For example, wire harnesses cannot be fixed on aircraft systems. Rules are necessary to guarantee only allowable parts are used for clamping. To minimize space occupation, as well as the weight of the clamps, it is convenient to route the harnesses in proximity of the fixable structure (i.e. the structure that allows harnesses to be fixed on). In order to enable such design behaviour, so called geometry attraction rules have been implemented in this research. ..3.2.3 Clamping rules
Wire harnesses need to be fixed on the fixable structure at proper values of fixing and clamping distance (Figure 6). The fixing distance is the distance between the harness centre Figure 6: Definition of clamping and fixing distance curve and its fixing structure, measured in correspondence of the clamp. Harnesses must be installed with a sufficient slack to avoid any tension in bundles and wires. However, the fixing distance must be sufficiently large to avoid any contact (hence abrasion) between the slacked harness and the structure. On the other hand, the fixing distance should not be too large in order to limit the size (i.e. the cost and weight) of the clamps, stand-off, and brackets, as well the space occupied by the EWIS. Inside the fuselage, for example, the normal slack value is ? inch (measured from the bundle centre curve, in between two contiguous clamps). Therefore, the minimum fixing distance which does not lead to chaffing and abrasion can be calculated by the Equation (1). In practice, the actual fixing distance is always larger than this value to guarantee some margin.
min fixing distance = 1 / 2inch + harness radius
(1)
The clamping distance is the distance between two adjacent clamping points. In this research, not only clamps but also connectors and break-outs are considered as clamping points. The maximum allowed clamping distance depends on the harness material and the routing environment. For a normal harness routed in a no-vibration zone (e.g. fuselage) this distance is 24 inches. For rigid harnesses this distance is extended to 42 inches [12]. Inside engine mounted wings the clamping distance is smaller due to the engine vibration. ..3.2.4 Grey areas rules
In aircraft, there are lot of hazardous zones, such as humid, hot and vibratory areas. These zones are neither forbidden (i.e. black) nor free (i.e. white) for harnesses to go through. By employing special precautions such as protection covers and extra clamps, harness can be routed in those areas, which are addressed here as grey areas. In this research, routing rules have been implemented for hot and flammable zones, which influence the use of bundle protection and clamps respectively. ..3.2.4.1 Hot zones rules
Hot zones are common areas in an aircraft. They are located around high-temperature equipment such as resistors, exhaust stacks, and heating ducts. Harness exposed to high temperature suffers deterioration and deformation. Therefore, it is necessary to ‘insulate wires that must run through hot areas with a high-temperature insulation material...’[12]. The extra cost incurred by the use of dedicated protection can be avoided by routing the harness outside these hot zones if applicable, at the cost of a longer harness. It is difficult to predict the most cost efficient solution without a proper simulation.
CEAS 2015 paper no. 138 Page | 5 This work is licensed under the Creative Commons Attribution International License (CC BY). Copyright ? 2015 by author(s).

..3.2.4.2
Flammable zones rules
Areas in the surrounding of flammable fluids or gas pipes are examples of typical flammable zones. An arcing fault caused by broken wires in this area may result in a fire. For wire bundles routed above fluid lines, the design specifications demand that “the clamps should be of compression type and should be spaced so that, assuming a wire break, the broken wire will not contact hydraulic lines, oxygen lines, pneumatic lines, or other equipment whose subsequent failure caused by arcing could cause further damage. [13]” The larger amount of clamps that is necessary to route in these zones affects the total cost and weight of the harnesses. This extra clamping cost can be avoided by routing the harness outside flammable zones, at the cost of a longer harness. Similarly to the earlier mentioned case of hot zone, it is difficult to predict the most cost efficient solution. 4 DESIGN METHODOLOGY FOR AUTOMATIC 3D ROUTING
As anticipated in Section 2, the method proposed in this paper to automate wire harness 3D routing is based on the hypothesis that a routing problem can be solved as an optimization problem. In this case, the objective function is defined as a harness cost Figure 7: wire harness representation as used for the routing function, which depends optimization on the followings parameters: ? The length of the harness, computed as the summation of all the bundles length in the harness branches ? The amount of clamps used to fix the harness on the airframe ? The amount and type of protecting layers used when routing the harness through harsh areas. The design variables are represented by the coordinates of the clamping points and break-out points of the wire harness (see the black dots in Figure 7). These points work as way-points to route the wire harness inside the aircraft Digital Mock-up (DMU). The optimization parameters (i.e. the parameters that do not vary during the optimization) are: ? the position of the points where the given harness connect with the harnesses of a contiguous wiring zone (i.e. production breaks) or the receptacles of the various electrical systems ? the bundle diameters, determined by the number and gauge of the wires of this bundle. The optimization constraints are formulated on the basis of the earlier discussed design rules (i.e. minimum bend radius, maximum clamping distance, and minimum fixing distance). Equation (2) shows the mathematical formulation of this non-linear optimization problem.
min f ( x)
x
f ( x ) = ∑ f j ( x) = ∑L j ( x )Co j ( x )
j =1 j =1
m
m
(2)
with respect to x subject to Ci ( x) ≤ 0
The objective function ( ) is the cost of the entire harness. It is represented by the summation of is the design variables each branch cost ( ), where is the index of each branch (Figure 7).
CEAS 2015 paper no. 138 Page | 6 This work is licensed under the Creative Commons Attribution International License (CC BY). Copyright ? 2015 by author(s).

vector and it represents the clamps and break-out points. These design variables are also the way points to generate the centre curve of bundles. The branch cost ( ) is computed as the product of ( ). ( ) is the cost and is the length of branch and depends on the design variables . coefficient of branch and depends on its bundle diameter, the amount of clamping elements, and required protective layers for the grey areas. The coefficient may be different in different routing zone and/or when applying different design specifications. ( ) is the constraint function to account for each design rule mentioned before. 4.1 Two-step optimization strategy
The challenge to solve the optimization problem described above is that the number of design variables is not known a priori. Indeed, the number of clamping points is an output of the harness routing process. In order to handle this chicken-and-egg type of problem, a two-step, hybrid optimization strategy has been devised. In the first step, called Initialization, a grid of potential clamping points (i.e. the road map) is generated in front of the structural elements where the harness is allowed to attach. Then an optimization approach is applied to route a simplified harness model on such grids. As results of this initialization step, a preliminary routing of the harness is obtained together with the number and position of its way-points (i.e. the number of clamping and break-out points and their coordinates). At this point, being the number of design variables and their initial values known, a second optimization process can be applied. In this second step, called Optimization, the actual geometrical model of the wire harness is used, and the design variables are varied by the optimizer in order to minimize the cost objective function, while satisfying all the constraints. These two steps will be elaborated in the next two sections. 4.2 The KBE framework for hybrid optimization
KBE technology has been used to support the two-step optimization process by reading in the geometry of the aircraft (i.e. the routing environment), modelling the cables as b-splines curves, measuring length and bend radii, checking for geometry collisions, and so forth. In practice, a KBE application has been developed (using the commercial KBE system GDL[14]), to take care of all the geometry modelling and querying operations necessary 1) to compute the variable states and the objective function and 2) to evaluate the constraints function during the various optimization iterations. The computational framework developed to support the Figure 8: the Harness Design and Engineering Engine (DEE) hybrid optimization approach is called Harness Design and Engineering Engine (HDEE) and is based on the DEE concept described in [15-17]. Figure 8 illustrates the four main components of the DEE: the Initiator, the Optimizer, the Multi Model Generator (MMG), and the Analysis tools and their connections. The Initiator is
CEAS 2015 paper no. 138 Page | 7 This work is licensed under the Creative Commons Attribution International License (CC BY). Copyright ? 2015 by author(s).

responsible for generating the preliminary harness definition. The Optimizer is in the charge of the systematic exploration of the routing space and convergence checks. The MMG is the component responsible for the generation of the harness geometry model and the extraction from such model of the specific data required for the analysis tools. These analysis tools include modules to calculate the cost of the harness and check whether the harness configuration satisfies the design rules, such as bend radius violation and geometry collision. The first of the two optimization steps, the Initialization, is performed by the Initiator block and is discussed in Section 5. The other three blocks are used in the Optimization phase, which is described in section 6. 5 3D ROUTING INITIALIZATION
The initialization step is responsible for generating a preliminary harness definition, which is then used as starting point for the second optimization step. In the initialization phase, a road map-based optimization method is adopted. Similar to a conventional GPS navigation system or a path finding process for computer games[18, 19], this optimization method first builds a road map (e.g. a grid of nodes and connections) and then uses it to find a convenient path for the harnesses. However, typical path finding methods/algorithms, such as those implemented in GPS route planners, are able to find only paths that have one start and one destination point. These methods cannot solve the path finding problem for wire harnesses that have multiple start and destinations (addressed as multidestination), as the one schematized in Figure 7. In this research, the bi-level optimization strategy is proposed to handle the multi-destination feature. 5.1 The bi-level optimization strategy
The bi-level optimization decomposes the path finding an entire harness into harness (global) level and branch (local) level, as shown in Figure 9. These levels are coordinated by the break-out points. The global level optimization moves the break-out points to different nodes of the road map to explore the routing space. Meanwhile the local, road map based Figure 9: Architecture of the bi-level path finding optimization finds the path between method adjacent break-outs or between break-out and receptacle and returns the cost of the harness paths to the global optimizer to support its decision for the next iteration. This process iterates until the harness configuration is converged. The generation of the road map and the global and local optimization processes are detailed below. 5.2 Road map generation: routing environment discretization
The routing road map is a discretization of the 3D routing space. It is built in 3 steps (Figure 10): 1. Offset surfaces generation. In this step, the fixable surfaces of the aircraft DMU are used to generate a set of offset surfaces. The non-fixable surfaces in DMU, such as those of pipes or other system where it is not possible to fix wire harnesses, are excluded. The offset distance is determined by the fixing distance value, which was discussed in Section 3.2.4. 2. Offset surfaces tessellation. In this second step the offset surfaces are tessellated into triangles. The tessellation size, i.e. the distance between adjacent nodes in the tessellation, is fixed on the basis of the clamping distance value discussed in Section 3.2.4. 3. Tessellated surfaces merge. In this third step, the nodes on the adjacent tessellated surfaces are connected in order to generate one continuous 3D road map in front of the fixable structure. In this step, the geometry collision and clamping distance are considered for all edges of the map. If an edge collide with a geometry component or is longer than the allowed clamping distance, this edge will be excluded from the final 3D road map.
CEAS 2015 paper no. 138 Page | 8 This work is licensed under the Creative Commons Attribution International License (CC BY). Copyright ? 2015 by author(s).

Once the road map is generated, it will be possible to proceed with the preliminary 3D routing. Each node on the map will be used as potential clamping point, and any wire harness branch will be defined as a poly-line built by chaining contiguous edge elements in the road map. Attributes are assigned to the various edge elements of the road map to store information about the length of the given edge, and specific coefficient values to account for their presence in a certain harsh Figure 10: The 3 steps to generate the harness road environment area (the grey zones map (1) Offset; (2) Tessellation; (3) Map generation discussed in Section 3.2.5). The cost coefficients to account for the number of required clamps and the need of protection cover on each edge of the road map might differ according to the grey zone(s) crossed by the given edge. 5.3 Local level optimization A* algorithm [20] is adopted to handle the local level optimization. This optimization algorithm is able to find the optimum path between two given points, addressed as source node and destination node, without knowing a priori the number of design variables. The special A* algorithm used in this research differs from other A* algorithms in the two following aspects. ..5.3.1 Cost calculation method:
( ) A* algorithm uses cost function ( ) ( ) to evaluate the cost of the traversed nodes aiming to find the optimum path. Each of the nodes is addressed as when it is evaluated. ( ) is the movement cost from the source node to the current node . ( ) is an estimated movement cost from current node to the destination node. The movement cost is generally represented by a distance. The cost of a harness branch is the product of the harness length and the unit length cost. The calculation method is shown in Equation (3). The unit length cost consists of three parts: the unit length cost of the bundle ; the unit length cost of the clamp ; and the unit length cost of the protection covering !.
f (rbundle , pu , D, Cm , Ci L, Dclamp , coecovering , thcover ) = LCo = L (Cob + Coc + Cop ) (C + Ci ) = L(π rbundle 2 pu D + m + coecovering π pu D (2rbundle thcover + thcover 2 )) Dclamp
: length of bundle; the summation of the length of road map edges : the radius of bundle cross section ! : unit price : density of bundle
"# $
(3)
: clamping distance : material cost and installation cost of a clamp
)
, &"'( *
"'( )
: cost coefficient of bundle covering, representing different covering materials : thickness of bundle covering
CEAS 2015 paper no. 138 Page | 9 This work is licensed under the Creative Commons Attribution International License (CC BY). Copyright ? 2015 by author(s).

When calculating ( ), the actual value of the parameters will be used. When calculating the heuristic value ( ), the maximum clamping distance and cost coefficient of covering in the non-grey area will be used to keep the Admissibility[20] (i.e. making sure it could find out the optimum path) of the algorithm. ..5.3.2 Bend radius check
During the implementation of the A* algorithm, the Curve Segment Bend Radius Pre-Calculation (CSBPC) approach is used to check harness bend radius violations. This approach uses the current node , the previous adjacent node ? 1 and the next adjacent node 1 to generate a fitted curve (see Figure 11). At the start and end points the approach uses the vectors of the two points to build two auxiliary nodes ? 1 and 1 respectively since these two nodes do not exist. Figure 11: The minimum bend radius check Then it uses the minimum radius of this fitted in the Initialization curve to represent the minimum bend radius of the harness centre curve to check, by means of a bend radius violation check function, whether the next node 1 is suitable for the harness. The check starts from the start point and continues until the target point is found that it has minimum cost on ( ) and does not violate the minimum bend radius condition. 5.4 Global level optimization
The objective function for the global level optimization is defined as the summation of all branches cost. See Equation (4).
f ( x) = ∑ f j ( x)
j =1 Nb
(4)
Here, is the cost of the harness’ branch . - is the total number of branches and is determined by the number of connectors. The vector contains the design variables of the global level optimization, which are the harness break-outs position. The global level optimization uses the Hill Climbing algorithm [21, 22]. The algorithm moves each breakout to new locations on its adjacent nodes of the road map. At the same time it evaluates the cost function and finds out the best combination from the set. If the best one is better than the benchmark in terms of objective function, this value will be set as the new benchmark and this design variables combination (i.e. this new collocation of the break-outs) will be accepted. The accepted design variables will be used as start position in the next loop. This process iterates until no further improvements can be found. An Figure 12: An intermediate iteration step intermediate state in the harness Initialization of harness Initialization process is shown in Figure 12. 6 HARNESS 3D ROUTING OPTIMIZATION
After the generation of the preliminary harness definition, the Optimization phase can start, with the clamping points and break-out positions as design variables. The Optimization is in charge of refining the position of clamps and break-outs (but not their number!) to solve the limitations of the
CEAS 2015 paper no. 138 Page | 10 This work is licensed under the Creative Commons Attribution International License (CC BY). Copyright ? 2015 by author(s).

Initialization, namely, to eliminate the violations of some design rules and to optimize the preliminary harness routing even further. 6.1 Limitations of the Initialization step
The preliminary harness routing performed in the Initialization step by means of the road map has a number of limitations, which generally prevent achieving not only an optimal wire harness routing, but even a feasible solution. ..6.1.1 Inter-harness and inner-harness geometry collision
A wiring zone contains some harnesses. The path finding in Initialization is implemented on each harness individually, without considering the presence of other harnesses. Hence, in some cases, different harnesses may share the same edge and/or vertex of the road map, which means geometry collision between different harnesses. Different branches of the same harness may also have the similar problem. ..6.1.2 Geometry collision between harness and geometry components
In the Initialization, a wire harness is defined as a polyline chaining a number of edges of the road map. In reality, the wire harness is not a line but a kind of pipe with a certain diameter. Its centre line is not a polyline but a spline curve fitting the nodes of the polyline generated by the Initialization. As a consequence, when generating the actual geometry of the wire harness starting from the polyline produced by the Initialization, geometry collision between harness and aircraft DMU components may occur. ..6.1.3 Bend radius violation
In the Initialization, CSBPC method is applied to exclude some extreme bend radius violation solutions. This method uses the minimum bend radius of the curve generated with three adjacent nodes to represent the minimum bend radius of the actual harness to carry out the violation check. This method cannot guarantee these two minimum bend radix are the same. It also cannot guarantee a bend-radius-violation-free solution for an entire harness. ..6.1.4 Non-optimum result
In the Initialization, the bi-level optimization method finds out the optimum harness in terms of the road map based problem definition. The road map limits the harness to the edges of the map. Therefore the so-called optimum harness in the Initialization might not be the optimum result in terms of the original problem definition and it could be optimized further to get a better result. 6.2 Optimization approach in the Optimization phase
The previous mentioned limitations make the result of the Initialization only a preliminary harness definition. In the Optimization phase to finalize the path finding a more conventional optimization process is used to move the position of break-outs and clamping points (i.e. the design variables) freely in the routing space. The architecture of this optimization framework is illustrated in Figure 13. The initial values of the design variables . are the Initialization outputs. These values are sent by the Initiator to the harness MMG. The harness MMG makes use of a predefined set of parametric harness components, called High Level Primitives (HLP), to build actual geometry models of the wire harness according to the input design variables. Other specific modules in the MMG, called Capability Modules (CMs), extract from the harness geometry model the specific set of data / required by the HDEE analysis tools. These analysis tools include modules to calculate the cost of the harness and to check the violation of the design rules. The analysis tools results and are sent back to the optimizer to support the decision making for next iterations.
CEAS 2015 paper no. 138 Page | 11 This work is licensed under the Creative Commons Attribution International License (CC BY). Copyright ? 2015 by author(s).

The Generalized Pattern Search (GPS)[23] is selected as the optimization algorithm. This algorithm, also known as black-box search, is gradientfree. It is able to handle the Boolean output of some analysis tools, such as the geometry collision check tool. This algorithm carefully moves the design variables to new position to get new harness configurations. This Figure 13: The framework of harness design optimization feature is very useful since the Initialization already generates a promising harness definition. The ± ? to get new harness configurations. The algorithm moves the design variable one by one to time complexity of the algorithm on the number of design variables is 2( ). This feature keeps the calculation efficiency linear to the complexity of the harness, i.e. the number of clamps and breakouts. Since the pattern search is not able to handle the design constraints, the objective function is modified and shown in Equation (5).
min θ ( x )
θ ( x ) = f ( x ) + cclamp ( x) + cbend ( x) + cgeometry ( x )
with respect to x
x
(5)
The constraint functions are accounted as penalty in the objective Cost of objective function function. The penalty value associated 1.60E+05 with each constraint violation is very 1.40E+05 high. Therefore the optimizer will 1.20E+05 endeavour to eliminate them first. An 1.00E+05 example change of cost function 3( ) 8.00E+04 is shown in Figure 14. The preliminary 6.00E+04 harness configuration of this example 4.00E+04 has three constraint violations: 1) 2.00E+04 bend radius violation, 2) geometry 0.00E+00 collision between two branches and 3) geometry collision between harness and the routing environment. With the progress of the optimization, the Figure 14: The decrease trend of the cost function optimizer moves the design variables to eliminate the constraints gradually. The elimination of constraint violation makes θ ( x ) drops steeply. While the optimization reaches the feasible area, the constraints part of θ ( x ) equals to 0. θ ( x ) becomes the original objective function f ( x ) . The optimization continues until one of the following stop scenarios is met.
CEAS 2015 paper no. 138 Page | 12 This work is licensed under the Creative Commons Attribution International License (CC BY). Copyright ? 2015 by author(s).
1 100 200 300 400 500 600 700 800 900 1000 1100 1200 1300 1400 1500 1600 1700 1800 1900 2000

1) If nFeasible solution Feasible solution Infeasible solution Infeasible solution
Here, is the total number of iteration and - is the maximum allowed number of iterations. This optimization is implemented per harness. However, the geometry collision between more harnesses is solved by adding the previously routed harness to the geometry component list of the routing environment. 7 RESULTS
The proposed method has been successfully implemented into a demonstrator software application, the HDEE, and several test cases have been executed to validate the system functionality. These Figure 15: The view of wire harnesses, independently (left) and in tests have fuselage routing environment (right) demonstrated that the tool is capable of handling cases of representative complexity and design constraints and deliver 3D models of routed harnesses in full automation. When changes are enforced either in the routing environment or in the definition of the Figure 16: Capability to handle the bend radius violation (left) and electrical system, the hot zone (right) optimization process can be run again to efficiently account for any modification. Figure 15 shows the result of the automatic 3D routing of a few wire harnesses in two fuselage sections. Figure 16 presents the capability of the Figure 17: update the routing result when a geometry obstacle tool to handle occurs different design constraints. Figure 17 demostrates that the tool is able to update the routing result when the routing environment is changed.
CEAS 2015 paper no. 138 Page | 13 This work is licensed under the Creative Commons Attribution International License (CC BY). Copyright ? 2015 by author(s).

The geometry of the test environment was generated on purpose using a commercial CAD product and used as input to the HDEE for automatic 3D routing system. The harness models generated by the HDEE are fit to be re-imported in the CAD system. 8
1. 2. 3. 4. 5.
REFERENCE
A380 Electrical Harnesses. 2012 [cited 2012 March 06]; Available from:
https://www.wendangku.net/doc/705187706.html,/aviation-forums/tech_ops/read.main/157173/#menu77 Kenneth Wong. What Grounded the Airbus A380? 2006 [cited 2012 March 06]; Available from: https://www.wendangku.net/doc/705187706.html,/management/what-grounded-airbus-a380-5955. Safran Group. More Electric Aircraft. 2014 [cited 2014 September 25]; Available from: https://www.wendangku.net/doc/705187706.html,/site-safran-en/innovation-429/areas-of-expertise/more-electric-aircraft/. Federal Aviation Administration, 43.13-1B - Acceptable Methods, Techniques, and Practices - Aircraft Inspection and Repair(Chapter 11). 1998. A. B. Conru. A genetic approach to the cable harness routing problem. in Evolutionary Computation,
6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16.
1994. IEEE World Congress on Computational Intelligence., Proceedings of the First IEEE Conference on. 1994. N.S. Ong, Activity-based cost tables to support wire harness design. International Journal of Production
Economics, 1993. 29(3): p. 271-289. Roger Billsdon and Ken Wallington, Wiring harness design- can a computer help. Computing & Control Engineering Journal, 1998. 9(4): p. 163-168. James M. Ritchie, et al., Cable harness design, assembly and installation planning using immersive virtual reality. Virtual Reality, 2007. 11(4): p. 261-273. Christian Van der Velden, et al., An intelligent system for automatic layout routing in aerospace design. Innovations in System and Software Engineering, 2007. 3(2): p. 117-128. G. La Rocca, Knowledge based engineering: Between AI and CAD. Review of a language based technology to support engineering design. Advanced Engineering Informatics, 2012. 6(2): p. 159-179. Joaquim R. R. A. Martins and Andrew B. Lambe, Multidisciplinary Design Optimization: A Survey of Architectures. AIAA Journal, 2013. 51(9): p. 2049-2075. U.S. Department of Defense, MIL-W-5088L. Wiring, Aerospace Vehicle. 1991. Federal Aviation Administration, Aircraft Electrical Wiring Interconnect System (EWIS) Best Practices, Aircraft EWIS Practices Job Aid 2.0. GenDL. 2015 [cited 2015 June 27]; Available from: https://www.wendangku.net/doc/705187706.html,. Gianfranco La Rocca and Michel J. L. Van Tooren, Knowledge-Based Engineering Approach to Support Aircraft Multidisciplinary Design and Optimization. Journal of Aircraft, 2009. 46(6): p. 1875-1885. G. La Rocca and M.J.L van Tooren, Development of Design and Engineering Engines to Support Multidisciplinary Design and Analysis of Aircraft, in Delft Science in Design–A Congress on Interdisciplinary Design. 2005. p. 107-124. G. La Rocca and M.J.L. Van Tooren, Enabling distributed multi-disciplinary design of complex products: a knowledge based engineering approach. Journal of Design Research, 2007. 5(3): p. 333-352. T.A Yang, Path planning and evaluation in IVHS databases, in Vehicle Navigation and Information Systems Conference. 1991. T. P. Hartley and Q. H. Mehdi. In-Game Adaptation of a Navigation Mesh Cell Path. in Computer Games (CGAMES), 2012 17th International Conference on. 2012. N. P. Padhy, Artificial Intelligence and Intelligent Systems. 2005: Oxford University Press. M. Fattah, et al. Smart hill climbing for agile dynamic mapping in many-core systems. in Design Automation Conference (DAC), 2013 50th ACM / EDAC / IEEE. 2013. Z. Michalewicz and D.B. Fogel, How to Solve It: Modern Heuristics. 2013: Springer Berlin Heidelberg. C. Audet and J.E. Dennis JR, Analysis of Generalized Pattern Searches. SIAM Journal on Optimization, 2002. 13(3): p. 889-903.
17. 18. 19. 20. 21. 22. 23.
CEAS 2015 paper no. 138 Page | 14 This work is licensed under the Creative Commons Attribution International License (CC BY). Copyright ? 2015 by author(s).

中考语文课外阅读题小说题库

中考语文课外阅读题(小说)题库 (一) 我家最富的时刻 第二次世界大战前,我们家是城里唯一没有汽车的人家。我母亲安慰家里人说:“一个人有骨气,就等于有了一大笔财富。” 几个星期后,一辆崭新的别克牌汽车在街上展出了。这辆车已定在今夜以抽奖的方式馈赠给得奖者。当扩音器里大声叫着我父亲的名字,明白无误地表示这辆彩车已属于我们家所有时,我简直不相信这是事实。 父亲开着车缓缓驶过拥挤的人群,我几次想跳上车去,同父亲一起享受这幸福的时刻,却被父亲给赶开了。最后一次,父亲甚至向我咆哮:“滚开,别呆在这儿,让我清净清净!”我无法A 父亲的举动。当我回家后B 地向母亲诉说的时候,母亲似乎非常理解父亲。她C 我说:“不要烦恼,你父亲正在思考一个道德问题,我们等着他找到适当的答案。” “难道我们中彩得到的汽车是不道德的吗” “过来,孩子。”母亲温柔地说。 桌上的台灯下放着两张彩票存根,上面的号码分别是348和349,中彩号是348。“你能看出两张彩票有什么不同吗”母亲问。 我看了好几遍终于看到其中一张彩票的一角上有用铅笔写的淡淡的K字。 “这K字代表凯特立克。”母亲说。 “吉米·凯特立克,爸爸交易所的老板!”我有些不解。 “对。”母亲把事情一五一十地给我讲了。 当初父亲对吉米说,他买彩券时可以代吉米买一张,吉米嘟哝了一声:“为什么不可以呢”老板说完就去干自己的事了,国后可能再也没有想到过这件事。348那张是为凯特立克买的,可以看出那K字用大拇指轻轻擦过,但仍能看出淡淡的铅笔印。 对我来说,这是件简单的事。吉米·凯特立克是个百万富翁,拥有十几辆汽车,他不会计较这辆彩车。 “汽车应该归我爸爸!”我激动地说。 “你爸爸知道该怎么做的。”母亲平静地回答我。 不久,我们听到父亲进门的脚步声,又听到他在拨电话号码,显然电话是打给凯特立克的。第二天下午,凯特立克的两个司机来到我们这儿,把别克牌汽车开走了,他们送给我父亲一盒雪茄。 直到我成年以后,我们家才有了一辆汽车。随着时间的流逝,我母亲那一句“一个人有骨气,就等于有了一大笔财富”的话语具有了新的含义。回顾以往的岁月,我现在才明白,父亲打电话的时候是我家最富有的时刻。 1.给下列加点的字注音。 馈赠 ..()()彩券.() ..()()咆哮 2.在文中横线上填写适当的词语。 A.B.C. 3.文章题目的关键词语是什么其含义是什么对你有何启示 答: 。4.文章主要记叙了一件什么事(用简要的文字叙述) 答:。5.文中的“贫”指什么“富”又指什么 答:。(参考答案:1.Kuì zèng páo xiào quàn 2.理解委屈安慰3.关键词是“最富”;其含义是指道德品质的富有。启示:富有不仅指物质和金钱上的富有,更重要的是一个人道德品质的富有。4.主

古代晋灵公不君、齐晋鞌之战原文及译文

晋灵公不君(宣公二年) 原文: 晋灵公不君。厚敛以雕墙。从台上弹人,而观其辟丸也。宰夫胹熊蹯不熟,杀之,寘诸畚,使妇人载以过朝。赵盾、士季见其手,问其故而患之。将谏,士季曰:“谏而不入,则莫之继也。会请先,不入,则子继之。”三进及溜,而后视之,曰:“吾知所过矣,将改之。”稽首而对曰:“人谁无过?过而能改,善莫大焉。诗曰:‘靡不有初,鲜克有终。’夫如是,则能补过者鲜矣。君能有终,则社稷之固也,岂惟群臣赖之。又曰:‘衮职有阙,惟仲山甫补之。’能补过也。君能补过,衮不废矣。” 犹不改。宣子骤谏,公患之,使鉏麑贼之。晨往,寝门辟矣,盛服将朝。尚早,坐而假寐。麑退,叹而言曰:“不忘恭敬,民之主也。贼民之主,不忠;弃君之命,不信。有一于此,不如死也!”触槐而死。 秋九月,晋侯饮赵盾酒,伏甲将攻之。其右提弥明知之,趋登曰:“臣侍君宴,过三爵,非礼也。”遂扶以下。公嗾夫獒焉。明搏而杀之。盾曰:“弃人用犬,虽猛何为!”斗且出。提弥明死之。 初,宣子田于首山,舍于翳桑。见灵辄饿,问其病。曰:“不食三日矣!”食之,舍其半。问之,曰:“宦三年矣,未知母之存否。今近焉,请以遗之。”使尽之,而为之箪食与肉,寘诸橐以与之。既而与为公介,倒戟以御公徒,而免之。问何故,对曰:“翳桑之饿人也。”问其名居,不告而退。——遂自亡也。 乙丑,赵穿①攻灵公于桃园。宣子未出山而复。大史书曰:“赵盾弑其君。”以示于朝。宣子曰:“不然。”对曰:“子为正卿,亡不越竟,反不讨贼,非子而谁?”宣子曰:“呜呼!‘我之怀矣,自诒伊戚。’其我之谓矣。” 孔子曰:“董狐,古之良史也,书法不隐。赵宣子,古之良大夫也,为法受恶。惜也,越竞乃免。” 译文: 晋灵公不行君王之道。他向人民收取沉重的税赋以雕饰宫墙。他从高台上用弹弓弹人,然后观赏他们躲避弹丸的样子。他的厨子做熊掌,没有炖熟,晋灵公就把他杀了,把他的尸体装在草筐中,让宫女用车载着经过朝廷。赵盾和士季看到露出来的手臂,询问原由后感到很忧虑。他们准备向晋灵公进谏,士季说:“如果您去进谏而君王不听,那就没有人能够再接着进谏了。还请让我先来吧,不行的话,您再接着来。”士季往前走了三回,行了三回礼,一直到屋檐下,晋灵公才抬头看他。晋灵公说:“我知道我的过错了,我会改过的。”士季叩头回答道:“谁能没有过错呢?有过错而能改掉,这就是最大的善事了。《诗经》说:‘没有人向善没有一个开始的,但却很少有坚持到底的。’如果是这样,那么能弥补过失的人是很少的。您如能坚持向善,那么江山就稳固了,不只是大臣们有所依靠啊。

listentothis英语中级听力答案解析修订版

l i s t e n t o t h i s英语中 级听力答案解析 HUA system office room 【HUA16H-TTMS2A-HUAS8Q8-HUAH1688】

英语中级听力参考答案 Answer Keys to Listen to This: 2 Edited by莫显良、马军军、张凤英、陈燕 L 1 L 2 L 3 L 4 L 5 L 6 L 7 L 8 L 9 L 10 L 11 L 12 L 13 L 14 L 15 L 16 L 17 L 18 L 19 L 20 L 21 L 22 L 23 L 24 L 25 L 26 L 27 L 28 L 29 L 30 L 31 L 32 L 33 L 34 L 35 L 36 Lesson 1 Section I Task 1: This Is Your Life! A.Choose the best answer (a, b or c) to complete each of the following statements. 1—6: caacba B.True or False Questions. 1—6: TFFFFT C.Identification.

(1)—(b), (2)—(d), (3)—(f), (4)—(g), (5)—(a), (6)—(c), (7)—(e) https://www.wendangku.net/doc/705187706.html,plete the following résumé for Jason Douglas. Name: Jason Douglas Former name: Graham Smith Profession: actor Date of birth: July 2, 1947 1952: started school 1958: moved to Lane End Secondary School 1966: went to the London School of Drama 1969: left the London School of Drama 1973: went to Hollywood 1974: were in a movie with Maria Montrose Task 2: What Are Your Ambitions? A.Give brief answers to the following questions. 1.Radio Station QRX. 2.For a survey.

农田水利学试题及答案

农田水利学课程考试试题及答案 姓名年级专业学号 一、名词解释(每小题2分共10分) 1.灌水率: 2.排涝模数: 3.平均排除法: 4.(排涝计算中的)设计内水位: 5.容泄区: 二.选择题(共10分) 1.灌溉设计标准是反映灌区效益达到某一水平的一个重要技术指标,一般以( )与( )表示? A、灌溉设计保证率、抗旱天数。 B、水文年型、降水量。 C、设计灌溉用水量全部获得满足的年数、抗旱天数。 D、水源来水量、灌区需水量。 2.什么叫田间渠系的灌排相邻布置?() A、灌溉渠道与排水沟道的规划布置。 B、田间各级渠道规划布置的形式。 C、田间灌排渠系并行相邻的布置形式。 D、田间灌排渠系交错的布置形式。

3.渠道的输水损失包括以下四个部分:() A、干渠、支渠、斗渠及农渠等四级渠道的水量损失。 B、渠床土质、地下水埋深、渠道的工作制度及输水时间。 C、自由渗流、顶托渗流、渠床土质、与渠道的工作制度等。 D、渠道水面蒸发损失、渠床渗漏损失、闸门漏水与渠道退水等。 4.什么叫渠道水的利用系数?() A、灌溉渠系的净流量与毛流量的比值。 B、某一级渠道的净流量与毛流量的比值。 C、田间实际灌入的有效水量与末级渠道的供水量之比。 D、实际灌入农田的有效水量和渠首引入的水量之比。 5.在渠道规划设计中,渠道最小流量有何作用?() A、用以校核对下一级渠道的水位控制条件。 B、用以校核渠道不淤条件。 C、用以确定修建节制闸的位置。 D、用以校核对下一级渠道的水位控制条件和确定修建节制闸的位置,并按最小流量验算渠道不淤条件。 6.什么叫雨水径流集蓄灌溉工程?() A、导引、收集雨水径流,并把它蓄存起来加以有效灌溉利用的工程技术措施。 B、田面、坡面、路面及屋面庭院等各类集水工程。

listen-to-this2-英语中级听力2答案

英语中级听力参考答案 Answer Keys to Listen to This: 2 Edited by莫显良、马军军、张凤英、陈燕 L 1L 2L 3L 4L 5L 6L 7L 8L 9L 10 L 11L 12L 13L 14L 15L 16L 17L 18L 19L 20 L 21L 22L 23L 24L 25L 26L 27L 28L 29L 30 L 31L 32L 33L 34L 35L 36 Lesson 1 Section I Task 1: This Is Your Life! A.Choose the best answer (a, b or c) to complete each of the following statements. 1—6: caacba B.True or False Questions. 1—6: TFFFFT C.Identification. (1)—(b), (2)—(d), (3)—(f), (4)—(g), (5)—(a), (6)—(c), (7)—(e) https://www.wendangku.net/doc/705187706.html,plete the following résumé for Jason Douglas. Name: Jason Douglas Former name: Graham Smith Profession: actor Date of birth: July 2, 1947 1952: started school 1958: moved to Lane End Secondary School 1966: went to the London School of Drama 1969: left the London School of Drama 1973: went to Hollywood 1974: were in a movie with Maria Montrose Task 2: What Are Your Ambitions? A.Give brief answers to the following questions.

如何翻译古文

如何翻译古文 学习古代汉语,需要经常把古文译成现代汉语。因为古文今译的过程是加深理解和全面运用古汉语知识解决实际问题的过程,也是综合考察古代汉语水平的过程。学习古代汉语,应该重视古文翻译的训练。 古文翻译的要求一般归纳为信、达、雅三项。“信”是指译文要准确地反映原作的含义,避免曲解原文内容。“达”是指译文应该通顺、晓畅,符合现代汉语语法规范。“信”和“达”是紧密相关的。脱离了“信”而求“达”,不能称为翻译;只求“信”而不顾“达”,也不是好的译文。因此“信”和“达”是文言文翻译的基本要求。“雅”是指译文不仅准确、通顺,而且生动、优美,能再现原作的风格神韵。这是很高的要求,在目前学习阶段,我们只要能做到“信”和“达”就可以了。 做好古文翻译,重要的问题是准确地理解古文,这是翻译的基础。但翻译方法也很重要。这里主要谈谈翻译方法方面的问题。 一、直译和意译 直译和意译是古文今译的两大类型,也是两种不同的今译方法。 1.关于直译。所谓直译,是指紧扣原文,按原文的字词和句子进行对等翻译的今译方法。它要求忠实于原文,一丝不苟,确切表达原意,保持原文的本来面貌。例如: 原文:樊迟请学稼,子曰:“吾不如老农。”请学为圃。子曰:“吾不如老圃。”(《论语?子路》) 译文:樊迟请求学种庄稼。孔子道:“我不如老农民。”又请求学种菜蔬。孔子道:“我不如老菜农。”(杨伯峻《论语译注》) 原文:齐宣王问曰:“汤放桀,武王伐纣,有诸?”(《孟子?梁惠王下》) 译文:齐宣王问道:“商汤流放夏桀,武王讨伐殷纣,真有这回事吗?(杨伯峻《孟子译注》) 上面两段译文紧扣原文,字词落实,句法结构基本上与原文对等,属于直译。 但对直译又不能作简单化理解。由于古今汉语在文字、词汇、语法等方面的差异,今译时对原文作一些适当的调整,是必要的,并不破坏直译。例如: 原文:逐之,三周华不注。(《齐晋鞌之战》) 译文:〔晋军〕追赶齐军,围着华不注山绕了三圈。

李文忠《摆渡老人》中考现代文阅读练习及答案

(三)课外阅读(13分) 摆渡老人 李文忠 ①读中学时,学校设在邻村,与我们村有一条河隔着,便认识了那摆渡老人。 ②当时,那老人一直是我们取乐的对象。每到放学,肚子饿得直叫的我们便一窝蜂向渡口跑去,挤在那儿。渡船只要一近岸,大家便争先恐后地向船上跃去。虽然老人很有经验,未到岸边便做好回撑的准备,但超载和落水的事仍然时有发生。超载时,船上的,岸上的,都望着老人手忙脚乱的样子大笑。夏天下雨时,大家总是把伞迎着风,看着渡船被吹到离渡口好远的地方,老人一番折腾,将船撑到渡口,我们便哄笑着上了岸。 ③最有意思的要数冬天(当时我是这样认为的)。冬天很冷,河面结了一层厚厚的冰。每天早晨,当我们赶到渡口时,总看见老人在那边晃着船,好长时间,才把船晃过来。望着老人跳舞似的笨拙姿势,我们总是哄笑,一直到船靠岸。我们往往因此耽误了早读,但我们都挺愿意。于是就希望天再冷些,便可迟点起来,反正去早了也过不了河。我们都为找到一个偷懒的理由而感到高兴。当时的我们,是“心忧读书愿天寒”。 ④那一天特别冷,我因有事起了个早,吃过早饭后,便不紧不慢地向学校走去。到渡口时我惊奇地发现,那老人不是我预料的那样正在“跳舞”,却已经到了这边。我和他攀谈起来。我问他:“你今天怎么这么早?”老人咳嗽了一声,缓缓地说:“许是人老了,早上总起不来。昨天听学校说耽误了学生上早读,今天我就起了早。谁知等了好长时间,才来了你一个人。”说完,便送我过河。 ⑤船到河心,老人忽然回头对我说道:“你们小孩子可要好好读书啊。”那双眼中竟满含着期待和爱意,我心中一震,看着老人瘦弱的身体,沾满冰碴的白胡子,一双手冻得发紫,猛地问道:“你干啥要吃这份苦呢?”好久,老人长叹一声说道:“干啥?哎,以前我也有一个可爱的儿子,他曾吵着要上学,但终究没上成。后来他得病去了,我一直感到对不起他,我在这儿摆渡,接送你们上学,心里好受些。”谈话间,船已到岸。待我上岸后,老人把船向河那边撑去。看着老人的背影,我不再感到笨拙可笑,鼻子有些酸酸的。 ⑥那天,我把老人的故事讲给同学们听了。以后,我们上船再也没有起哄。于是老人饱经风霜的脸上出现了笑容。 ⑦再后来,两岸之间架起了一座桥。最后一次过河时,老人对我们说:“以后不再送你们过河了,你们要记住,好好读书。” ⑧“好好读书”,这句话一直留在我记忆中。 ⑨真想再见见摆渡老人。 20、本文具体描述了摆渡老人接送“我们”过河上学的辛劳。先写老人因“我们”的___________而手忙脚乱,一番折腾;再写因_________,老人好不容易“才把船晃过来”;最后写老人不顾自己__________,特地起大早送“我们”过河上学。(3分) 21.第⑤段中摆渡老人说“我在这儿摆渡,接送你们上学,心里好受些”。请你用自己的语言简要说说为什么老人觉得这样做“心里好受些”。(3分) ________________ 22.第⑤段中划横线的语句表现了“我”当时___________和___________的心情。(2分) 23.结合全文内容回答以下问题。 原先,摆渡老人在孩子们的眼里是一个________________的形象;后来,摆渡老人在孩子们的心中却是一个________________的形象。(2分) 24.“摆渡老人”中的“摆渡”可以理解为老人对“我们”生活、思想上的帮助。其实生活中还有许多这样的“摆渡者”,请你展开联想,按照下面的示例仿写两个句子。

齐晋鞌之战原文和译文

鞌之战选自《左传》又名《鞍之战》原文:楚癸酉,师陈于鞌(1)。邴夏御侯,逢丑父为右②。晋解张御克,郑丘缓为右(3)。侯日:“余姑翦灭此而朝食(4)”。不介马而驰之⑤。克伤于矢,流血及屦2 未尽∧6),曰:“余病矣(7)!”张侯曰:“自始合(8),而矢贯余手及肘(9),余折以御,左轮朱殷(10),岂敢言病吾子忍之!”缓曰:“自始合,苟有险,余必下推车,子岂_识之(11)然子病矣!”张侯曰:“师之耳目,在吾旗鼓,进退从之。此车一人殿之(12),可以集事(13),若之何其以病败君之大事也擐甲执兵(14),固即死也(15);病未及死,吾子勉之(16)!”左并辔(17) ,右援拐鼓(18)。马逸不能止(19),师从之,师败绩。逐之,三周华不注(20) 韩厥梦子舆谓己曰:“旦辟左右!”故中御而从齐侯。邴夏曰:“射其御者,君子也。”公曰:“谓之君子而射之,非礼也。”射其左,越于车下;射其右,毙于车中。綦毋张丧车,从韩厥,曰:“请寓乘。”从左右,皆肘之,使立于后。韩厥俛,定其右。逢丑父与公易位。将及华泉,骖絓于木而止。丑父寝于轏中,蛇出于其下,以肱击之,伤而匿之,故不能推车而及。韩厥执絷马前,再拜稽首,奉觞加璧以进,曰:“寡君使群臣为鲁、卫请,曰:‘无令舆师陷入君地。’下臣不幸,属当戎行,无所逃隐。且惧奔辟而忝两君,臣辱戎士,敢告不敏,摄官承乏。” 丑父使公下,如华泉取饮。郑周父御佐车,宛茷为右,载齐侯以免。韩厥献丑父,郤献子将戮之。呼曰:“自今无有代其君任患者,有一于此,将为戮乎”郤子曰:“人不难以死免其君,我戮之不祥。赦之,以劝事君者。”乃免之。译文1:在癸酉这天,双方的军队在鞌这个地方摆开了阵势。齐国一方是邴夏为齐侯赶车,逢丑父当车右。晋军一方是解张为主帅郤克赶车,郑丘缓当车右。齐侯说:“我姑且消灭了这些人再吃早饭。”不给马披甲就冲向了晋军。郤克被箭射伤,血流到了鞋上,但是仍不停止擂鼓继续指挥战斗。他说:“我受重伤了。”解张说:“从一开始接战,一只箭就射穿了我的手和肘,左边的车轮都被我的血染成了黑红色,我哪敢说受伤您忍着点吧!”郑丘缓说:“从一开始接战,如果遇到道路不平的地方,我必定(冒着生命危险)下去推车,您难道了解这些吗不过,您真是受重伤了。”daier 解张说:“军队的耳朵和眼睛,都集中在我们的战旗和鼓声,前进后退都要听从它。这辆车上还有一个人镇守住它,战事就可以成功。为什么为了伤痛而败坏国君的大事呢身披盔甲,手执武器,本来就是去走向死亡,伤痛还没到死的地步,您还是尽力而为吧。”一边说,一边用左手把右手的缰绳攥在一起,用空出的右手抓过郤克手中的鼓棰就擂起鼓来。(由于一手控马,)马飞快奔跑而不能停止,晋军队伍跟着指挥车冲上去,把齐军打得打败。晋军随即追赶齐军,三次围绕着华不注山奔跑。韩厥梦见他去世的父亲对他说:“明天早晨作战时要避开战车左边和右边的位置。”因此韩厥就站在中间担任赶车的来追赶齐侯的战车。邴夏说:“射那个赶车的,他是个君子。”齐侯说: “称他为君子却又去射他,这不合于礼。”daier 于是射车左,车左中箭掉下了车。又射右边的,车右也中箭倒在了车里。(晋军的)将军綦毋张损坏了自己的战车,跟在韩厥的车后说: “请允许我搭乗你的战车。”他上车后,无论是站在车的左边,还是站在车的右边,韩厥都用肘推他,让他站在自己身后——战车的中间。韩厥又低下头安定了一下受伤倒在车中的那位自己的车右。于是逢丑父和齐侯(乘韩厥低头之机)互相调换了位置。将要到达华泉时,齐侯战车的骖马被树木绊住而不能继续逃跑而停了下来。(头天晚上)逢丑父睡在栈车里,有一条蛇从他身子底下爬出来,他用小臂去打蛇,小臂受伤,但他(为了能当车右)隐瞒了这件事。由于这样,他不能用臂推车前进,因而被韩厥追上了。韩厥拿着拴马绳走到齐侯的马前,两次下拜并行稽首礼,捧着一杯酒并加上一块玉璧给齐侯送上去,

Listentothis3Lesson1答案及原文

News Item 1: 1. Gen eral comprehe nsion, choose the best an swer (a, b, c, or d) to complete each of the followi ng stateme nts ⑴ David Jacobse n was ___ b ___ . _ a. US colonel stationed in West Germany b. a freed America n hostage c. one of the rema ining captives in Leba non d. the man who worked to gain the release of hostages in Leba non ⑵ Terry Waite wan ted _ c _____ . _ a. to criticize the US government's handling of the hostage situation b. to have his checkups at the air force hospital c. to continue with his efforts to gain the release of other hostages d. to show his tha nks to the Reaga n adm ini strati on (3) The doctor's in itial impressi on is that _d . _ a. the hostage has heart-break ing disappo in tme nts b. the hostage has n't dealt well with the stresses of his captivity r c. the hostage is very tired both physically and men tally d. the hostage is physically in very good con diti on 2. Identification. Match each item in Column I with one item in Column II by recog nizing the pers on's occupati on or remarks Colu mn I (4) Preside nt Reaga n (1) Charles Moffitt Colum n II a. "There's no way to tell right ⑶ Terry Waite that."

农田水利学试题及答案资料

农田水利学课程考试试题及答案 姓名 年级 专业 学号 一、名词解释(每小题 2 分 共 10 分) 1. 灌水率: 2. 排涝模数: 3. 平均排除法: 4. (排涝计算中的)设计内水位: 5. 容泄区: 二.选择题(共 10 分) 1. 灌溉设计标准是反映灌区效益达到某一水平的一个重要技术指标,一般以 ( )与 ( )表示? A 、灌溉设计保证率、抗旱天数。 B 、水文年型、降水量。 C 、设计灌溉用水量全部获得满足的年数、抗旱天数。 D 、水源来水量、灌区需水量。 2. 什么叫田间渠系的灌排相邻布置? ( ) 3. 渠道的输水损失包括以下四个部分: ( ) A 、干渠、支渠、斗渠及农渠等四级渠道的水量损失。 B 、渠床土质、地下水埋深、渠道的工作制度及输水时间。 C 、自由渗流、顶托渗流、渠床土质、与渠道的工作制度等。 D 、渠道水面蒸发损失、渠床渗漏损失、闸门漏水与渠道退水等。 4. 什么叫渠道水的利用系数? ( ) A 、灌溉渠系的净流量与毛流量的比值。 B 、某一级渠道的净流量与毛流量的比值。 C 、田间实际灌入的有效水量与末级渠道的供水量之比。 D 、实际灌入农田的有效水量和渠首引入的水量之比。 5. 在渠道规划设计中,渠道最小流量有何作用? ( ) A 、用以校核对下一级渠道的水位控制条件。 A 、灌溉渠道与排水沟道的规划布置。 B 、田间各级渠道规划布置的形 式。

B、用以校核渠道不淤条件。 C、用以确定修建节制闸的位置。 D、用以校核对下一级渠道的水位控制条件和确定修建节制闸的位置,并按最小流量验算渠道不淤条件。 6.什么叫雨水径流集蓄灌溉工程?() A 、导引、收集雨水径流,并把它蓄存起来加以有效灌溉利用的工程技术措施。 B、田面、坡面、路面及屋面庭院等各类集水工程。 C、各类形式的水窖、水窑窖等蓄水工程。 D、各类最为有效节水的灌溉方式。 7.集流面的处理主要包括哪三类方法?() A 、采用混凝土、水泥土、三七灰土进行表面处理。 B、采用塑料薄膜、或塑膜复沥青、复草泥。 C、植被管理;地表处理;化学处理。 D、采用钠盐、硅有机树脂及粗石蜡等化学处理方法。 8.蓄水工程有哪几种主要的类型?() A 、引水渠沟或管道、入水口、拦污栅、沉沙槽、蓄水设施以及放水装置等。 B、涝池、旱井、田间蓄水池、水窖、水窑窖等。 C、引水渠、蓄水窑洞与放水暗管与放水暗渠。 D 、沉沙池、进水管、水窖等。 9.什么叫续灌方式?() A 、类似于自来水管道可随机用水的供水方式。 B、输配水管道进行输水、配水和灌水的方式。 C、是指上一级管道按预先划分好的轮灌组分组向下一级管道配水的方式。 D 、是指上一级管道向所有的下一级管道同时配水的方式。 10.什么叫集水效率?() A 、降水特征(次降雨量、降雨强度)和集水面质地、坡度、前期含水量与集水面尺寸。 B、集水面的处理材料、集水面积、集流路径和汇流时间。 C、随降水强度的增大而提高。 D、某时段内或某次降雨集水面的集水量占同一时期内的降雨量的比值。 三、简答题(每题6分,共30分) 1.四种地表取水方式的使用条件

摆渡老人的阅读答案

摆渡老人的阅读答案 摆渡老人 ①读中学时,学校设在邻村,与我们村有一条河隔着,便认识了那摆渡老人。 ②当时,那老人一直是我们取乐的对象。每到放学,肚子饿得直叫的我们便一窝蜂向渡口跑去,挤在那儿。渡船只要一近岸,大家便争先恐后地向船上跃去。虽然老人很有经验,未到岸边做好回撑的准备,但超载和落水的事仍然时有发生。超载时,船上的,岸上的,都望着老人手忙脚乱的样子大笑。夏天下雨时,大家总是把伞迎着风,看着渡船被吹淌到离渡口好远的地方,老人一番折腾,将船撑到渡口,我们便哄笑着上了岸。 ③最有意思的要数冬天。冬天很冷,河面结了一层厚厚的冰。每天早晨,当我们赶到渡口时,总看见老人在那边晃着船,好长时间,才把船晃过来。望着老人跳舞似的笨拙姿势,我们总是哄笑,一直到船靠岸。我们往往因此耽误了早读,但我们都挺愿意。于是就希望天再冷些,便可迟点起来,反正去早了也过不了河。我们都为找到一个偷懒的理由而感到高兴。当时的我们,是心忧读书愿天寒。 ④那一天特别冷,我因有事起了个早。吃过早饭后,便不紧不慢地向学校走去。到渡口时我惊奇地发现,那老人不

是我预料的那样正在跳舞,却已经到了这边。我和他攀谈起来。我问他:你今天怎么这么早?老人咳嗽了一声,缓缓地说:许是人老了,早上总起不来。昨天听学校说耽误了学生上早读,今天我就起了早。谁知等了好长时间,才来了你一个人。说完,便送我过河。 ⑤船到河心,老人忽然回头对我说道:你们小孩子可要好好读书啊。那双眼中竟满含着期待和爱意。我心中一辱,看着老人瘦弱的身体,沾满冰碴的白胡子,一双手冻得发紫,猛地问道:你干啥要吃这份苦呢?好久,老人长叹一声说道:干啥?哎,以前我也有一个可爱的儿子,他曾吵着要上学,但终究没上成。后来他得病去了,我一直感到对不起他,我在这儿摆渡,接送你们上学,心里好受些。谈话间,船已到岸。待我上岸后,老人又把船向河那边撑去。看着老人的背影,我不再感到笨拙可爱,鼻子有些酸酸的。 ⑥那天,我把老人的故事讲给同学们听了。以后,我们上船再也没有起哄。于是老人饱经风霜的脸上出现了笑容。 ⑦再后来,两岸之间架起了一座桥。最后一次过河时,老人对我们说:以后不再送你们过河了,你们要记住,好好读书。 ⑧好好读书,这句话一直留在我记忆中。 ⑨真想再见见摆渡老人。 13、本文具体描述了摆渡老人接送我们过河上学的辛劳。

《鞌之战》阅读答案(附翻译)原文及翻译

《鞌之战》阅读答案(附翻译)原文及翻 译 鞌之战[1] 选自《左传成公二年(即公元前589年)》 【原文】 癸酉,师陈于鞌[2]。邴夏御齐侯[3],逢丑父为右[4]。晋解张御郤克,郑丘缓为右[5]。齐侯曰:余姑翦灭此而朝食[6]。不介马而驰之[7]。郤克伤于矢,流血及屦,未绝鼓音[8],曰:余病[9]矣!张侯[10]曰:自始合,而矢贯余手及肘[11],余折以御,左轮朱殷[12],岂敢言病。吾子[13]忍之!缓曰:自始合,苟有险[14],余必下推车,子岂识之[15]?然子病矣!张侯曰:师之耳目,在吾旗鼓,进退从之[16]。此车一人殿之[17],可以集事[18],若之何其以病败君之大事也[19]?擐甲执兵,固即死也[20]。病未及死,吾子勉之[21]!左并辔[22],右援枹而鼓[23],马逸不能止[24],师从之。齐师败绩[25]。逐之,三周华不注[26]。 【注释】 [1]鞌之战:春秋时期的著名战役之一。战争的实质是齐、晋争霸。由于齐侯骄傲轻敌,而晋军同仇敌忾、士气旺盛,战役以齐败晋胜而告终。鞌:通鞍,齐国地名,在今山东济南西北。 [2]癸酉:成公二年的六月十七日。师,指齐晋两国军队。陈,

列阵,摆开阵势。 [3]邴夏:齐国大夫。御,动词,驾车。御齐侯,给齐侯驾车。齐侯,齐国国君,指齐顷公。 [4]逢丑父:齐国大夫。右:车右。 [5]解张、郑丘缓:都是晋臣,郑丘是复姓。郤(x )克,晋国大夫,是这次战争中晋军的主帅。又称郤献子、郤子等。 [6]姑:副词,姑且。翦灭:消灭,灭掉。朝食:早饭。这里是吃早饭的意思。这句话是成语灭此朝食的出处。 [7]不介马:不给马披甲。介:甲。这里用作动词,披甲。驰之:驱马追击敌人。之:代词,指晋军。 [8] 未绝鼓音:鼓声不断。古代车战,主帅居中,亲掌旗鼓,指挥军队。兵以鼓进,击鼓是进军的号令。 [9] 病:负伤。 [10]张侯,即解张。张是字,侯是名,人名、字连用,先字后名。 [11]合:交战。贯:穿。肘:胳膊。 [12]朱:大红色。殷:深红色、黑红色。 [13]吾子:您,尊敬。比说子更亲切。 [14]苟:连词,表示假设。险:险阻,指难走的路。 [15]识:知道。之,代词,代苟有险,余必下推车这件事,可不译。 [16]师之耳目:军队的耳、目(指注意力)。在吾旗鼓:在我们

英语高级听力listentothis3答案1到27单元

Lesson 1 Section one News item 1 A. b,c,d B. 1c,2d,3b,4a News item 2 A. b B. running behind News item 3 A. d, B. 1.president,had died in a plane crash 2.ruling,130 3.Foreign Minster,47 4.Portugal,1975 5.Prime Minister,9,transitional Section two A. FTFFF B. C,C,B,A,D,B,C,B C. 52,hospital director,married,good,US Air Force Hospital,Wiesbaden, W.Germany,this moring,undertermined,U.S.A D. 1.precisely,freedom 2.take up,reporters,six-mile jog 3.evaluation,had coped extremely well 4.evidence,tortured,physically ab used Section three A.1.Most Chinese thoughtt mao tsetong as a very good poet,according to the speaker. 2.poetry was considered abysmal because of the restriction of publicatio n during the ten years of the cultural revolution. 3.leaders in china,as well as in the east,are expected to be accomplished p oets. 4.it is about getting rid of a disease that was a plague in china. 5.willis barnstone is a professor of comparative literature at Indiana unive rsity in Bloomington. 6.mao’

农田水利学试题六

农田水利学课程考试试题 姓名年级专业学号 一、名词解释(每小题2分共10分) 1、渠道设计流量: 2、灌溉水利用系数: 3、最小流量: 4、田间净流量:: 5、不冲流速: 二.单向选择题(共10分) 1.地下水临界深度是指? () A、地下水埋藏深度。 B、在一定的自然条件和农业技术措施条件下,为了保证土壤不产生渍害,所要求保持的地下水最小埋深。 C、在一定的自然条件和农业技术措施条件下,为了保证土壤不产生盐碱化和作物不受盐害,所要求保持的地下水最小埋深。 D、在一定的自然条件和农业技术措施条件下,为了保证土壤不产生盐碱化和作物不受盐害,所要求保持的地下水最大埋深。 2.对于控制一定地下水位要求的农田排水系统,下列哪种说法是正确的?() A、在同一排水沟深度的情况下,排水沟的间距愈大,地下水位下降速度愈快,在一定时间内地下水位的下降值愈大,在规定时间内地下水位的下降值也愈大。 B、在允许的时间内要求达到的地下水埋藏深度ΔH一定时,排水沟的间距愈大,需要的深度也愈大。 C、在允许的时间内要求达到的地下水埋藏深度ΔH一定时,排水沟的间距愈小,需要的深度也愈大。 D、在同一排水沟间距的情况下,排水沟的深度愈小,地下水位下降速度愈快,在一定时间内地下水位的下降值愈大,在规定时间内地下水位的下降值也愈大。

3.设计排涝标准时,需选择发生一定重现期的暴雨,一般选择标准是?() A、1-5年。 B、5-10年。 C、10-15年。 D、15-20年。 4.对渍害最不敏感的作物是?() A、小麦; B、玉米; C、高粱; D、水稻。 5.特别适宜防治土壤次生盐碱化的农田排水方式是?() A、明沟排水; B、竖井排水; C、暗管排水; D、暗沟排水。 6.在进行排水沟设计时,用来校核排水沟的最小流速的设计流量是?() A、排涝设计流量; B、排渍设计流量; C、日常排水设计流量; D、排涝模数。 7.农田长期渍水不会造成下列后果? A、土壤的透气性很差。 B、土层都处于强烈的氧化状态。 C、利于硫化氢等硫化物的形成,对作物根系产生永久性伤害。 D、有机质矿化程度低,分解释放的有效养分少,不能满足作物生长的需要。 8.防治土壤盐碱化的水利技术不包括?() A、明沟排水 B、井灌井排 C、灌水冲洗 D、放淤改良 9.什么叫计划用水?() A、灌溉水量的分配方法。 B、就是按作物的需水要求与灌溉水源的供水情况,结合渠系工程状况,有计划地蓄水、引水、配水与灌水。 C、是指灌溉水在灌区各级渠系调配、管理的方式。 D、是指灌溉水通过各级渠道流入田间的方法。 10.灌区用水计划一般来说有哪四种主要类型?() A、水源引水计划、渠系配水计划与田间的用水计划等。 B、水权集中、统筹兼顾、分级管理、均衡受益。 C、年度轮廓用水计划、某灌季全渠系用水计划、干支渠段用水计划及用水单位的用水计划。 D、上下结合、分级编制,统一调度、联合运用。

摆渡老人阅读题答案

摆渡老人阅读题答案 读中学时学校与我们村隔着一条河由此认识了那摆渡老人。当时那老人一直是我们取乐的对象。每到放学肚子饿得直叫的我们便一窝蜂向渡口跑去挤在那儿。渡船只要一靠近岸大家便争先恐后地向船上跃去。虽然老人很有经验来到岸边便做好回撑的准备但超载和落水的事仍然时有发生。超载时船上的岸上的都望着老人手忙脚乱的样子大笑。夏天下雨时大家总是把伞迎着风看着渡船被吹到离渡口好远的地方老人一番折腾将船撑到渡口我们便哄笑着上了岸。 最有意思的要数冬天。冬天很冷河面结了一层厚厚的冰。每天早晨当我们赶到渡口时总看见老人在那边摇着船好长时间才把船摇过来。一直到船靠岸。我们往往因此耽误了早读但我们都挺愿意。于是就希望天再冷些便可迟点起来反正去早了也过不了河。我们都为找到一个偷懒的理由而感到高兴。当时的我们是“心忧读书愿天寒”。 那一天特别冷我因有事起了个早。吃过早饭后便不紧不慢地向学校走去。到渡口时我惊奇地发现那老人不是我预料的那样正在“跳舞”却已经到了这边。我和他攀谈起来。我问他“你今天怎么这么早”老人咳嗽了一声缓缓地说“许是人老了早上总起不来。昨天听学校说耽误了学生上早读今天我就起了早。谁知等了好长时间才来了你一个人。”说完便送我过河。 船到河心老人忽然回头对我说“你们小孩子可要好好读书啊。”那双眼睛竟满含着期待和爱意。我心中一震看着老人疲弱的身体沾满水碴?6?7碴á?6?8小碎块。的白胡子一双冻得发紫的手猛地问到“你干啥要受这份苦呢”好久老人长叹一声说道“干啥哎以前我也有一个可爱的儿子他曾吵着要上学但终究没上成。后来他得病去了我一直感到对不起他。我在这儿摆渡接送你们上学心里好受些。”谈话间船已到岸。待我上岸后老人又把船向河那边撑去。看着老人的背影我不再感到笨拙可笑鼻子有些酸酸的。 那天我把老人的故事讲给同学们听了。以后我们乘船再也没有起哄。于是老人饱经风霜的脸上现出了笑容。 再后来两岸之间架起了一座桥。最后一次过河时老人对我们说“以后不再送你们过河了你们要记住好好读书啊。” “好好读书”这句话一直留在我的记忆中。 真想再见见摆渡老人。 1本文具体描述了摆渡老人接送“我们”过河上学的辛劳。先写老人因“我们”的______而手忙脚乱一番折腾再写因 ______老人好不容易“才把船晃过来”最后写老人不顾自己________特地起大早送“我们”过河上学。用概括的语言填空 2第⑤段中摆渡老人说“我在这儿摆渡接送你们上学心里好受些”。请你用自己的语言简要说说为什么老人觉得这样做“心里好受些”。分析摆渡老人的心理答______________________________________________________ 3第⑤段中加粗的词句表现了“我”当时_______和_______的心情。 4原先摆渡老人在孩子们的眼里是一个______的形象后来摆渡老人在孩子们的心中却是一个______的形象。用自己的话填空5“摆渡老人”中的“摆渡”可以理解为老人对“我们”生活、思想上的帮助。其实生活中还有许多这样的“摆渡者”请你展开联想按照下面的示例仿写三个句子。新题型示例1作家把读者摆渡到精神的彼岸。 训练联想和表达能力 2 “希望工程”把贫穷的孩子摆渡到求知的校园。 仿句1______________________________________________________

《鞌之战》阅读答案附翻译

《鞌之战》阅读答案(附翻译) 《鞌之战》阅读答案(附翻译) 鞌之战[1] 选自《左传·成公二年(即公元前589年)》 【原文】 癸酉,师陈于鞌[2]。邴夏御齐侯[3],逢丑父为右[4]。晋解张御郤克,郑丘缓为右[5]。齐侯曰:“余姑 翦灭此而朝食[6]。”不介马而驰之[7]。郤克伤于矢, 流血及屦,未绝鼓音[8],曰:“余病[9]矣!”张侯[10]曰:“自始合,而矢贯余手及肘[11],余折以御,左轮 朱殷[12],岂敢言病。吾子[13]忍之!”缓曰:“自始合,苟有险[14],余必下推车,子岂识之[15]?——然 子病矣!”张侯曰:“师之耳目,在吾旗鼓,进退从之[16]。此车一人殿之[17],可以集事[18],若之何其以 病败君之大事也[19]?擐甲执兵,固即死也[20]。病未 及死,吾子勉之[21]!”左并辔[22],右援枹而鼓[23],马逸不能止[24],师从之。齐师败绩[25]。逐之,三周 华不注[26]。 【注释】 [1]鞌之战:春秋时期的著名战役之一。战争的实质是齐、晋争霸。由于齐侯骄傲轻敌,而晋军同仇敌忾、 士气旺盛,战役以齐败晋胜而告终。鞌:通“鞍”,齐

国地名,在今山东济南西北。 [2]癸酉:成公二年的六月十七日。师,指齐晋两国军队。陈,列阵,摆开阵势。 [3]邴夏:齐国大夫。御,动词,驾车。御齐侯,给齐侯驾车。齐侯,齐国国君,指齐顷公。 [4]逢丑父:齐国大夫。右:车右。 [5]解张、郑丘缓:都是晋臣,“郑丘”是复姓。郤(xì)克,晋国大夫,是这次战争中晋军的主帅。又称郤献子、郤子等。 [6]姑:副词,姑且。翦灭:消灭,灭掉。朝食:早饭。这里是“吃早饭”的意思。这句话是成语“灭此朝食”的出处。 [7]不介马:不给马披甲。介:甲。这里用作动词,披甲。驰之:驱马追击敌人。之:代词,指晋军。 [8]未绝鼓音:鼓声不断。古代车战,主帅居中,亲掌旗鼓,指挥军队。“兵以鼓进”,击鼓是进军的号令。 [9]病:负伤。 [10]张侯,即解张。“张”是字,“侯”是名,人名、字连用,先字后名。 [11]合:交战。贯:穿。肘:胳膊。 [12]朱:大红色。殷:深红色、黑红色。 [13]吾子:您,尊敬。比说“子”更亲切。

listentothis英语中级听力答案及原文

l i s t e n t o t h i s英语中级听力答案及原文 集团标准化办公室:[VV986T-J682P28-JP266L8-68PNN]

英语中级听力参考答案 Answer Keys to Listen to This: 2 Edited by莫显良、马军军、张凤英、陈燕 Lesson 1 Section I Task 1: This Is Your Life! A.Choose the best answer (a, b or c) to complete each of the following statements. 1—6: caacba B.True or False Questions. 1—6: TFFFFT C.Identification. (1)—(b), (2)—(d), (3)—(f), (4)—(g), (5)—(a), (6)—(c), (7)—(e) https://www.wendangku.net/doc/705187706.html,plete the following résumé for Jason Douglas. Name: Jason Douglas Former name: Graham Smith Profession: actor Date of birth: July 2, 1947 1952: started school 1958: moved to Lane End Secondary School 1966: went to the London School of Drama 1969: left the London School of Drama 1973: went to Hollywood 1974: were in a movie with Maria Montrose Task 2: What Are Your Ambitions? A.Give brief answers to the following questions. 1.Radio Station QRX. 2.For a survey.

相关文档
相关文档 最新文档