DATE:SUPPLIER NAME:VOLUME QUOTED:PART #:PLANT LOCATION:TOOLING CAPACITY:

PART NAME:MFG DUNS CODE:@ HRS/DAY:DWG LEVEL:

LOCAL CURRENCY:@ DAYS/WEEK:RFQ #:

EXCHANGE RATE:

PREPARED BY:

RAW MATERIAL AND PURCHASED COMPONENTS:

NET UNIT

GROSS UNIT % MAT'L AMOUNT

AMOUNT

UOM

UTILIZATION

PC

TOTAL MATERIAL:

PERCENTAGE OF SALES PRICE:

0%

LABOR & BURDEN:

---------------------------LABOR DETAIL ---------------------------------------MACHINE DATA ------------------------------------BURDEN DETAIL -----------------------------

TOTAL LABOR:- PERCENTAGE OF SALES PRICE:

0%

(TOT FIXED)

PERCENTAGE OF SALES PRICE:

0%% SALES TOTAL MANUFACTURING COST (MATERIAL + LABOR + BURDEN):0%SELLING, GENERAL & ADMINISTRATIVE EXPENSE:

0%PROFIT:0%PACKAGING:SELLING PRICE:

TRANSPORTATION & FREIGHT

TOTAL TRANSPORTATION COST:

PIECE PRICE AND TOOLING COST BREAKDOWN FORM

MATERIAL COST

- ITEM DESCRIPTION

ITEM I.D.

COST/ UNIT

SCRAP RECLAIM TOTAL (COST/#, YD, SQ FT, ETC.)

COST/UNIT

- - - - - - -

Op #

OPERATION /

DESCRIPTION

LABOR RATE

THROUGHPUT (PCS/HR)

# OPER

LABOR COST

MACHINE SIZE

MACHINE TYPE

VAR COST

FIXED COST

TOTAL BURDEN

COST

BURDEN COST / HR

TOTAL ANNUAL

COST

-

0.00

- - - TOTAL ANNUAL

- 0.00-

TAX

FREIGHT DUTY ITEM DESCRIPTION

TOTAL

COST

This transportation & freight cost should be the estimate of the cost to deliver the goods to the Nexteer dock from the Named Place, if applicable. If a cost should be captured for delivering the goods from your facility to the Named Place, please include that in the Burden Detail listed above.

Note: This "Total Transportation Cost" will NOT be included in your selling price.

PRODUCTION TOOLING DETAILS:

PRE-PRODUCTION PROTOTYPE INVESTMENT DETAILS:

TOTAL PRE-PRODUCTION TOOLS COST:

PRE-PRODUCTION PROTOTYPE INVESTMENT COSTS:

PRE-PRODUCTION PIECE COSTS:

-