USING SIMULATION MODELING TO DEVELOP A GOLF COURSE FLOW DSS

USING SIMULATION MODELING TO DEVELOP A GOLF COURSE FLOW DSS
USING SIMULATION MODELING TO DEVELOP A GOLF COURSE FLOW DSS

USING SIMULATION MODELING TO DEVELOP A

GOLF COURSE FLOW DSS

Andrew A. Tiger, Ph.D, Southeastern Oklahoma State University, atiger@https://www.wendangku.net/doc/7a18049021.html,

Jimmy Speers, Ph.D., Southeastern Oklahoma State University, jspeers@https://www.wendangku.net/doc/7a18049021.html, Claude Simpson, Ph.D., Southeastern Oklahoma State University, csimpson@https://www.wendangku.net/doc/7a18049021.html, Dave Salzer, E. & J. Gallo Winery, dave.salzer@https://www.wendangku.net/doc/7a18049021.html,

A BSTRACT

A model-based decision support system (DSS) for operating and designing golf course systems is presented in this paper. The DSS is based on a simulation model that accurately represents the variability and interactions that impact pace of play on a golf course. Research shows the economic benefits of understanding the impact of policy and design on golf course play, specifically throughput (rounds played) and cycle time (round length). The DSS model was developed using MS-Excel and @RISK, a Monte Carlo simulation package. Using MS-Excel offers a much greater degree of transferability and usability than traditional standalone discrete-event simulation software.

Keywords: Golf simulation, gate management

INTRODUCTION

The golf industry is big business. In 1999, golfers spent $16.3 billion on green fees [18]. Because of the Tiger Woods effect on popularity, the number of golfers is increasing, creating the need for more courses. Over 400 new courses are being constructed per year [18]. Golf courses, like most business operations, are designed and operated to be profitable. Many factors influence profitability. This paper focuses on improving profits by increasing throughput (the number of golfers playing golf per day) of a golf course. The approach used in this paper is unique in that we apply proven math-based modeling technology to model golf course daily throughput.

Daily golf course play is a stochastic system where random events (lost balls, weather, and poor shots) and interactions (waiting for the group in front of you) heavily impact the pace of play. Although complex, daily golf course operations are very similar to other complex systems such as:

? A manufacturing plant where parts are moving from production process to process

? A distribution network where transportation devices (trucks, boats, planes, …) move from location to location

?An emergency room at a hospital where patients wait for treatment

In all of these examples, performance is impacted by variability and interactions. However, these examples and other complex systems have been analyzed with math modeling. Therefore, a golf course system should be a candidate for math-based analysis.

Before proceeding, the first question to be addressed is ‘Is there potential for math modeling to increase profits by improving throughput?’ Consider a course with a $35 green fee, 12 hours of daily playing time, and an average round taking 4.5 hours. A modest 10% improvement in weekend/holiday rounds yields a 16% increase in throughput and over $100,000 increase in annual revenue. Certainly, the potential exists.

720

USING SIMULATION MODELING TO DEVELOP A GOLF COURSE FLOW DSS IACIS 2003 The objective is to demonstrate a math-based model that accurately represents the daily play at a golf course that can be the basis for a design and operations improvement decision support system. A model-driven DSS that represents daily play at a golf course is beneficial for both designers and course managers. In both, qualitative measures and experience are the primary tools. Little empirical knowledge exists that provides the quantitative impact on throughput. For example, how much do the following impact throughput: fairway width, length of course, elevation changes, bunkers, green size …? Certainly, designers know that the above impact pace of play. However, quantifying the impact is much more difficult. One study has shown that the number of bunkers and the hilliness of the course did not influence revenues [16]. Similarly, course managers have questions regarding throughput. How much do the following impact throughput: tee-time intervals, shotgun starts, group size (2, 3, 4, 5...), carts vs. walking …? Increasing throughput and controlling, or at least forecasting, cycle time are two of the most important factors in revenue management [10].

The ultimate objective is to create a science of golf course play by representing golf course play with a math-based model. A model of systems allows studying the system without the consequences of experimenting on the actual system. The benefits are reduced time and costs and increased safety and creativity. If the model used only once to solve a problem, it has been a useful tool. If the model can be used again, in a changing environment, with several variables at the control of the user, the model is then a model-driven decision support system. The most used method for modeling systems with variability and interactions is discrete-event simulation (DES). In general, simulation refers to a broad collection of methods and applications to mimic the behavior of real systems. Simulation models can be physical or logical (mathematics).

DES is a venerable and well-defined methodology of operations research and many excellent explanatory texts exist [11, 14, 17]. The methodology is particularly useful in evaluating interdependencies among random effects that may cause a serious degradation in performance even though the average performance characteristics of the system appear to be acceptable [15]. Additionally, simulation models are intuitive, which is an important reason for their longtime and continuing application to complex systems. As such, DES has been used to study manufacturing systems [1, 3, 4, 7, 8, 12, 13], supply chains [2, 5, 6], business processes, and the healthcare industry.

The literature review found one published article where simulation was applied to modeling golf course play [9]. In this model, waiting occurred only on the first tee. In a real system, many opportunities exist for waiting, and not all of them occur on the tee box. The study also assumed that rate of play was normally distributed, and a skewed distribution is more likely. The time study used to build the simulation was based on one course. A new time study would need to be done for each course you wanted to analyze.

MODELING METHODOLOGY

System Description

A golf group consists of individual golfers, usually ranging from 1 to 5. Once set, the number of golfers in a group does not change. On each hole, the group begins on the tee box and hits one at a time. The group moves towards the green once all golfers in the group have hit from the tee box. Some golfers move to the green more quickly than others depending on many factors. Having reached the green, each golfer finishes by putting (one at a time) his/her ball into the hole. Once all golfers in the group have finished putting, the group proceeds to the next hole. 721

IACIS 2003 USING SIMULATION MODELING TO DEVELOP A GOLF COURSE FLOW DSS

722

The group’s pace is dictated not only by its own processing time, but also by the group’s immediate predecessor and the type of hole (par 3, 4, or 5). A group must wait for its predecessor to be out of the way. For example on a par 4 (or 5), a group cannot begin to hit from the tee box until its predecessor is sufficiently out of range to prevent injury by hitting someone. Because of the short distance of a par 3, a group cannot hit from the tee box until its predecessor is off the green. On par 4/5’s a safe distance is between 225 and 300 yards. We define the point that allows the group behind to safely hit as a gate and refer to waiting for the group ahead to be out of the way as gate management .

On the tee box and green, individual golfers hit one at a time. Therefore, for the group, the processing times are additive. In a fairway, the golfers proceed in parallel and the slowest golfer dictates the group’s pace of play.

A golf course is a terminal system. It has a definite beginning and ending as a function of daylight. For terminal systems, performance is very dependent on the system’s initial conditions. For a golf course, a slow group early in the day often spells disaster for the remainder of the day in terms on the rounds played (throughput) and round length (cycle time).

Modeling Technique

The golf course system was modeled using MS-Excel and @RISK, a MS-Excel add-in. Although not a standalone discrete-event simulation software, MS-Excel has an assortment of functions that are quite capable of modeling a gate-management system. The add-in, @RISK, provided a concise method for modeling different scenarios and maintaining statistics for analysis.

The best way to illustrate the gate management modeling logic is through an example. Consider the first hole at the beginning of the day. The first two groups are modeled. Group one has the first tee time (time = 0), and group two’s tee time is six minutes later. Table 1 shows the processing times for each group. Note that this table does not show event times, only processing times. Since hitting from the tee box is a serial process, times are additive, and group one takes 150 seconds. Before group two can hit from the tee box, group one needs to be out of the way. We define a gate 300 yards from the tee box that group one must be through prior to group two hitting. Table 1. Processing times for a Par 4

Group Golfer

Time to tee-off Time through gate Time to green Time to

putt

1 1 60 110 70 70

2 30 90 60 30

3 20 100 200 (max) 10

4 40 140 (max) 40 70

Group 150 140 200 180

2 5 40 100 (max) 40 30

6 40 60 60 40

7 60 70 70 50

8 20 80 80 (max) 40

Group 160 100 80 160

The golfers in group one move to the gate at different speeds, and the slowest golfer (golfer 4 in this example) is out of the way in 140 seconds (after leaving the tee box). From this gate, golfers in group 1 proceed to the green. Golfer 3 takes the longest (200 seconds). Once on

USING SIMULATION MODELING TO DEVELOP A GOLF COURSE FLOW DSS IACIS 2003

723 the green, putting time is additive; therefore, the total putting times is 180 seconds, and the group’s total time to complete the hole is 670 seconds.

Similar logic exists for group 2, except its pace is dictated not only by its tee time and processing time, but also by group 1’s pace. Table 2 shows the event times. Group 2’s tee time is six minutes after group 1. Since group 1 is through the gate at 290 seconds, group 2 does not need to wait for group 1 and begins to hit exactly at its tee time. However, group 2 is not as fortunate in the fairway. Group 2 takes 160 seconds to hit from the tee box and 100 seconds to reach the gate; therefore it is ready go through the gate at 620 seconds. However, it cannot get through the gate until 670 seconds because group 1 is still on the green. Therefore, group 2 waits in the fairway for 50 seconds. This delay does not prevent group 3 (not modeled) from hitting at its scheduled tee-time of 720 seconds; however, this can change as the day progresses. As often with queuing systems, once behind, it is very difficult to get back on schedule. For par 3 and 5 similar logic is needed, except par 3s have no fairway gate and par 5s can have two fairway gates. Table 2. Event times for a Par 4

Group Tee-time Off tee-box Through gate To green Off green

1 0 150 290 490 670

2 360 520 670 750 910

Data

The modeling approach used is gate management. For accurately representing to-gate times, data were collected by a class of Operations Management students as a data analysis exercise. Four different types of data (500+ values) were collected from five different local courses. Each type of data fit a triangular distribution. See table 3 for the type of data and triangular distributions values for the minimum, mode, and maximum. Note that the tee box and putting values are times (seconds), and the other values are rates (yards/second). The rates allow transit times to be determined on any hole on any course by dividing the hole-specific distance by the randomly generated rate. Table 3. Data Values

Data Type

Description Min Mode Max Tee box time

(seconds)

The time for an individual golfer to address and hit the ball on the tee box. No waiting time included. 25 46 65 Tee box to gate

(yards/second)

After leaving the tee box, an individual golfer’s rate while reaching an arbitrary (but identified) point/gate in the fairway. 0.167 1.50 3.25 Gate to green

(yards/second)

From an arbitrary (but identified) point/gate in the fairway, an individual golfer’s rate while reaching the green. 0.28 1.76 3.33 Putting time

(seconds) The time for an individual golfer to complete putting and leave the green.

14 63 90

A good decision support system separates input data from modeling logic; thus, developing a tool that can be applied to many different systems. Our model-driven DSS separates course data from the modeling logic. Therefore, if a new course is to be analyzed, only the input data must be modified. The modeling logic takes into account which hole is a par 3, 4, or 5 and represents the gate management system accordingly. The input data structure with some sample data (first 3 holes) is shown in Table 4. The first hole is a par 5. The first fairway gate is 275 yards from the tee box. The next fairway gate is 200 yards from the first fairway gate. The green is 25 yards from the second fairway gate, and the second hole’s tee box is 50 yards from

IACIS 2003 USING SIMULATION MODELING TO DEVELOP A GOLF COURSE FLOW DSS

724

the first green. The second hole is a par 4; therefore, it does not have a second fairway gate. The third hole is a par 3; therefore, it does not have any fairway gates. Table 4. Input Data

Hole Par Distance To Gate 1 To Gate 2 To Green To

Next Hole

1 5 500 275 200 25 50

2 4 400 280 - 120 70

3 3 180 - - 180 60

Assumptions

1. No play-through logic (same group order throughout the round).

2. Gates are hole-specific, not golfer-specific.

3. No golfer designation except quantity. Carts/walking, fast/slow, good/bad,

straight/erratic, long/short … are not included.

4. No course designation except par and distance. Water, bunkers, rough height, elevation

changes … are not modeled.

Although not modeled in this research, substantial opportunities exist for incorporating the assumptions as modeling parameters in subsequent research.

Validation, determining that the model accurately represents the real system, relied primarily on experience and expert judgment. Avid, if not talented golfers, the authors have a wealth of experience of how long a round can be played without waiting as a single or in a group. Similarly, the modeling of a busy course accurately reflected upwards of 5 hours for a weekend round of golf.

ANALYSIS OF TEE TIME INTERVALS AND SHOTGUN STARTS

As an initial analysis, a typical busy course (four golfers per group) was analyzed to determine the tradeoff of tee time intervals and rounds played. In addition, a shotgun-style approached was also modeled. Shotgun starts fully load the course (a group on each hole in this example) immediately at the beginning of the day and reload the course approximately five hours later. Figure 1 shows the results from a 100-day simulation. Since the system is terminal, no warm up period is required.

Figure 1. Tee Time Interval Analysis

USING SIMULATION MODELING TO DEVELOP A GOLF COURSE FLOW DSS IACIS 2003 The chart shows the tradeoff of throughput (rounds played) and cycle time (round length) versus the tee time interval. Short tee time intervals get more people through the course; however, the consequence is a congested course as shown by the long cycle times. For this course, a 6-minute tee time, 220 rounds of golf are completed in a day; however, the round averages six hours! Moving to a 14-minute tee time drops the round length an hour-and-a-half; however, a reduction of 30 rounds occurs. Compared to a tee-time policy, shotgun starts have two benefits: short cycle times (four-and-a-half hours) and large throughput (210 rounds). The reason is the ability to fully utilize the system from the beginning of the day. In this example, a group was assigned to each hole. Potential additional improvements are possible by putting more than one group on specific holes. Although shotgun starts have benefits, the assumption is that no-shows (golfers who have reservations, but fail to show) are minimal. Subsequent analysis, similar to airline overbooking, is needed to fully determine if shotgun starts are profitable.

Identification of course bottlenecks, i.e., holes where play is severely congested, are shown in Figure 2. It shows that holes 6, 8, and 17 are bottleneck candidates. Referring to the input data, holes 8 and 17 are Par 3s which may provide insight to course managers and designers on improvement through better sequencing or management.

Figure 2. Identifying Bottlenecks

CONCLUSIONS AND FUTURE RESEARCH

This research shows the benefits of applying a math-based DSS to understand the impact of policy and design on golf course play. In the past, little effort has been devoted to modeling a golf course system as a complex system impacted by variability and interaction. The DSS model was developed using MS-Excel and @RISK, a Monte Carlo simulation package. Using MS-Excel offers a much greater degree of transferability and usability than traditional standalone discrete-event simulation software. Future research is plentiful. For example, more detailed data would allow additional golfer and course characteristics to be evaluated; thus providing both course managers and designers feedback on policy and design decisions.

725

IACIS 2003 USING SIMULATION MODELING TO DEVELOP A GOLF COURSE FLOW DSS

REFERENCES

1. Albino, V. and A. C. Garavelli (1999) Limited Flexibility in Cellular Manufacturing

Systems: A Simulation Study, International Journal of Production Economics, 60/61, 447-455.

2. An, C., S. Buckley, D. Connors, G. Feigin, and R. Jayaraman (1994) Modeling and

Simulation of Manufacturing and Distribution Networks, Proceedings of the TIMS/ORSA Conference, Boston.

3. Borenstein, D. (2000) Implementation of an Object-Oriented Tool for the Simulation of

Manufacturing Systems, International Journal of Production Research, 38 (9), 2125-2142.

4. Caprihan, R. and S. Wadhwa (1997) Impact of Routing Flexibility on the Performance of an

FMS – A Simulation Study, International Journal of Flexible Manufacturing Systems, 9 (3), 273-298.

5. Chen, Y. (1999) Global Supply Chain Simulation, Proceedings of the INFORMS

Conference, Cincinnati.

6. Ferguson, L. A. (1998) Improving Global Supply Chain Management Decisions,

Proceedings of the INFORMS Conference, Seattle.

7. Garg, S., P. Vrat, and A. Kanda (2001) Equipment Flexibility Vs. Inventory: A Simulation

Study of Manufacturing Systems, International Journal of Production Economics, 70 (2), 125-143.

8. Gupta, Y. P. and S. Goyal (1992) Flexibility Trade-offs in a Random Flexible Manufacturing

System: A Simulation Study, International Journal of Production Research, 30 (3), 527-557.

9. Kimes, S. E. and L. W. Schruben (2002) Golf Course Management: A Study of Tee Time

Intervals, Journal of Revenue and Pricing Management, 1(2), 111-120.

10. Kimes, S. E. (2000) Revenue Management on the Links: Applying Yield Management to the

Golf-Course Industry, Cornell Hotel and Restaurant Administration Quarterly, 41(1), 120-127.

11. Law A. and W. Kelton (2000) Simulation Modeling and Analysis, McGraw-Hill, New York.

12. Nandkeolyar, U. and D. P. Christy (1992) An Investigation of the Effect of Machine

Flexibility and Number of Part Families, International Journal of Production Research, 30

(3), 513-526.

13. Pflughoeft, K. and G. K. Hutchinson (1999) The Effects of Workstation Flexibility on the

(N\N) Job Shop Problem, International Journal of Flexible Manufacturing Systems, 11 (1), 103-113.

14. Pritsker, A. (1995) Simulation and SLAM II, John Wiley, New York.

15. Shapiro, J. F. (2001) Modeling the Supply Chain, Duxbury, United States.

16. Schmanske, S. (1999) The Economics of Golf Course Condition and Beauty, Atlantic

Economic Journal, 27(3), 301-313.

17. Winston, W. (2001) Simulation Modeling Using @RISK, Duxbury, United States.

18. https://www.wendangku.net/doc/7a18049021.html,/faq/

726

高考文科数学模拟试卷及答案

高考文科数学模拟试卷 一、选择题:本大题共10小题,每小题5分,共50分.在每小题给出的四个选项中,只有一项是符合题目要求的. 1.已知复数z满足(2﹣i)2?z=1,则z的虚部为() A.B.C.D. 2.已知集合A={x|x2=a},B={﹣1,0,1},则a=1是A?B的() A.充分不必要条件B.必要不充分条 C.充要条件D.既不充分也不必要条件 3.设单位向量的夹角为120°,,则|=() A.3 B. C.7 D. 4.已知等差数列{a n}满足a6+a10=20,则下列选项错误的是() A.S15=150 B.a8=10 C.a16=20 D.a4+a12=20 5.一几何体的三视图如图所示,则该几何体的体积为() A.B.C.4﹣πD. 6.双曲线=1的顶点到其渐近线的距离为() A. B.C. D. 7.周期为4的奇函数f(x)在[0,2]上的解析式为f(x)=,则 f(2014)+f(2015)=() A.0 B.1 C.2 D.3

8.已知x,y满足约束条件,则z=2x+y的最大值为() A.2 B. C.4 D. 9.在△ABC中,内角A、B、C的对边分别是a、b、c,若c2=(a﹣b)2+6,△ABC的面积为,则C=() A.B.C.D. 10.设f′(x)为函数f(x)的导函数,已知x2f′(x)+xf(x)=lnx,f(1)=,则 下列结论正确的是() A.xf(x)在(0,+∞)单调递增B.xf(x)在(1,+∞)单调递减 C.xf(x)在(0,+∞)上有极大值 D.xf(x)在(0,+∞)上有极小值 二、填空题:本大题共5小题,每小题5分,共25分. 11.右面的程序框图输出的S的值为. 12.在区间[﹣2,4]上随机取一个点x,若x满足x2≤m的概率为,则m= .13.若点(a,9)在函数的图象上,则a= . 14.已知x>0,y>0且2x+y=2,则的最小值为.

圆梦2015·高三年级理科数学仿真模拟试题(3)精美word版

第 1 页 共 10 页 图 1 图2 圆梦2015·高三数学(理)仿真模拟三 一、选择题:本大题共8小题,每小题5分,满分40分.在每小题给出的四个选项中,只有一项是符合题目要求的. 1.已知函数lg y x =的定义域为A ,{} 01B x x =≤≤,则A B =( ) A .()0,+∞ B .[]0,1 C .(]0,1 D .[)0,1 2.设i 为虚数单位,若复数() ()2231i z m m m =+-+-是纯虚数,则实数m =( ) A .3- B .3-或1 C .3或1- D .1 3 .设函数sin 2y x x =的最小正周期为T ,最大值为A ,则( ) A .T π= ,A = B . T π=,2A = C .2T π= ,A = D .2T π=,2A = 4.某由圆柱切割获得的几何体的三视图如图1所示,其中俯视图是 中心角为60?的扇形,则该几何体的体积为( ) A . 3 π B .23π C .π D .2π 5.给定命题p :若20x ≥,则0x ≥; 命题q ::已知非零向量,,a b 则 “⊥a b ”是“-+=a b a b ”的充要条件. 则下列各命题中,假命题的是( ) A .p q ∨ B . ()p q ?∨ C .()p q ?∧ D .()()p q ?∧? 6.已知函数()222,02,0 x x x f x x x x ?+≥=?-)的比值a b ,称这些比值中的最小值为这个 数表的“特征值”.当2n =时, 数表的所有可能的“特征值”最 大值为( ) A .3 B . 43 C .2 D .32

2020年宁夏银川一中高三生物一模试题【附答案】

绝密★启 用前2020 年普通高等学校招生全国统一考试 理科综合能力测试试题卷 ( 银川一中第一次模拟考试) 注意事项: 1.答卷前,考生务必将自己的姓名、准考证号填写在答题卡上。 2.作答时,务必将答案写在答题卡上。写在本试卷及草稿纸上无效。 3.考试结束后,将本试卷和答题卡一并交回。 可能用到的相对原子质量:H-1 C-12 N-14 O-16 P-31 S-32 Cl-35.5 Ca-40 V-51 Fe-56 Cu-64 Zn-65 一、选择题:本题共13 小题,每小题6 分,在每小题给出的四个选项中,只有一项是符合题目要求的。 1.下列关于生物大分子的叙述中,正确的是 A.肺炎双球菌、烟草花叶病毒都含有核糖体和核 酸B.生物体内参与信息传递的信息分子都是蛋白 质 C.细胞质中的核酸只含核糖,细胞核中的核酸只含脱氧核糖 D.人的吞噬细胞和浆细胞结构和功能不同,根本原因是遗传信息执行情况不同 2.某农作物细胞间隙的浓度为a,细胞液的浓度为b,细胞质基质的浓度为c,在对农 作物施肥过多造成“烧苗”过程中,三者之间的关系是 A.a>b>c B.b>c>a C.a>c>b D.b>a>c 3.下列关于变异和进化的说法,正确的是 A.用秋水仙素处理单倍体植株后得到的一定是纯合子 B.在三倍体无子西瓜的培育过程中,用四倍体西瓜作母本,用二倍体西瓜作父本,得到 的种子胚细胞中含有三个染色体组 C.两个种群间的隔离一旦形成,这两个不同种群的个体之间就不能进行交配,或者即使 能交配,也不能产生可育后代 D.突变能为生物进化提供原材料,但不包括染色体数目的变异,因为该过程并没有新的 基因产生

2018年高三数学模拟试题理科

黑池中学2018级高三数学期末模拟试题理科(四) 一、选择题:本大题共12小题,每小题5分,共60分. 1.已知集合{}2,101,, -=A ,{} 2≥=x x B ,则A B =I A .{}2,1,1- B.{ }2,1 C.{}2,1- D. {}2 2.复数1z i =-,则z 对应的点所在的象限为 A .第一象限 B.第二象限 C.第三象限 D.第四象限 3 .下列函数中,是偶函数且在区间(0,+∞)上单调递减的函数是 A .2x y = B .y x = C .y x = D .2 1y x =-+ 4.函数 y=cos 2(x + π4 )-sin 2(x + π4 )的最小正周期为 A. 2π B. π C. π2 D. π 4 5. 以下说法错误的是 ( ) A .命题“若x 2 -3x+2=0,则x=1”的逆否命题为“若x≠1,则x 2 -3x+2≠0” B .“x=2”是“x 2 -3x+2=0”的充分不必要条件 C .若命题p:存在x 0∈R,使得2 0x -x 0+1<0,则﹁p:对任意x∈R,都有x 2 -x+1≥0 D .若p 且q 为假命题,则p,q 均为假命题 6.在等差数列{}n a 中, 1516a a +=,则5S = A .80 B .40 C .31 D .-31 7.如图为某几何体的三视图,则该几何体的体积为 A .π16+ B .π416+ C .π8+ D .π48+ 8.二项式6 21()x x +的展开式中,常数项为 A .64 B .30 C . 15 D .1 9.函数3 ()ln f x x x =-的零点所在的区间是 A .(1,2) B .(2,)e C . (,3)e D .(3,)+∞ 10.执行右边的程序框图,若0.9p =,则输出的n 为 A. 6 B. 5 C. 4 D. 3 开始 10n S ==, S p

高考文科数学模拟试题

高考文科数学模拟题 一、选择题: 1.已知集合{}{} 12,03A x x B x x =-<=<<,则A B =() A .{} 13x x -<”是“0<

高考数学模拟试题

高考数学模拟试题 (第一卷) 一、选择题:(每小题5分,满分60分) 1、已知集合A={x|x 2+2ax+1=0}的真子集只有一个,则a 值的集合是 A .(﹣1,1); B .(﹣∞,﹣1)∪[1,+∞]; C .{﹣1,1}; D .{0} 2、若函数y=f(x)的反函数y=f -1(x)满足f -1(3)=0,则函数y=f(x+1)的图象必过点: A .(0,3); B .(-1,3); C .(3,-1); D .(1,3) 3、已知复数z 1,z 2分别满足| z 1+i|=2,|z 2-3-3i|=3则| z 1-z 2|的最大值为: A .5; B .10; C .5+13; D .13 4、数列 ,4 3211,3211,211++++++ ……的前n 项和为: A .12+n n ; B .1+n n ; C .222++n n ; D .2+n n ; 5、极坐标方程ρsin θ=sin2θ表示的曲线是: A .圆; B .直线; C .两线直线 D .一条直线和一个圆。 6、已知一个复数的立方恰好等于它的共轭复数,则这样的复数共有: A .3个; B .4个; C .5个; D .6个。 7、如图,在正方体ABCD —A 1B 1C 1D 1中,E 、F 是异面直 线AC ,A 1D 的公垂线,则EF 和ED 1的关系是: A . 异面; B .平行; C .垂直; D .相交。 8、设(2-X)5=a 0+a 1x+a 2x+…+a 5x 5, 则a 1+a 3+a 5的值为: A .-120; B .-121; C .-122; D .-243。 9、要从一块斜边长为定值a 的直角三角形纸片剪出一块圆形纸片,圆形纸片的最大面积为: A .2 πa 2; B .24223a π-; C .2πa 2; D .2)223(a π- 10、过点(1,4)的直线在x,y 轴上的截距分别为a 和b(a,b ∈R +),则a+b 的最小值是: A .9; B .8; C .7; D .6; 11、三人互相传球,由甲开始发球并作为第一次传球。经过5次传球后,球仍回到甲手中,则不同的传球方式共有: A .6种; B .8种; C .10种; D .16种。 12、定义在R 上的偶函数f(x)满足f(x+2)=f(x -2),若f(x)在[﹣2,0]上递增,则 A .f(1)>f(5.5) ; B .f(1)

宁夏银川一中2019届高三生物上学期第一次月考试题

银川一中2019届高三年级第一次月考 理科综合试卷 命题人:本试卷分第I卷(选择题)和第II卷(非选择题)两部分。其中第II卷第33?38题为选考题, 其它题为必考题。考生作答时,将答案写在答题卡上,在本试卷上答题无效。 第I卷(共126分) 可能用到的相对原子质量(原子量):H—1 0—16 Na—23 K—39 Mn—55 Cu—64 Ni—59 一、选择题:本题包括13小题。每小题6分,共78分,每小题只有一个选项符合题意。 1.下列有关病毒、原核生物和真核生物的描述,正确的是 A.病毒、原核生物和真核生物的共同点是遗传物质都是DM B.原核牛物和真核生物都具有完整的生物膜系统 C.病毒进入原核细胞后,细胞内的溶酶体会将其“消化” D.病毒能够借助原核生物或真核生物的核糖体来合成自身的蛋白质 2.玉米种子的萌发是种子的胚从相对静止状态变为生理活跃状态,并长成营自养生活的幼苗的过 程。下列关于该过程的叙述,正确的是 A.在萌发过程中,主要以被动运输的方式从外界吸收水和无机盐 B.在萌发过程中,细胞呼吸加强,导致细胞内有机物的总量一直减少 C.萌发过程中,各细胞的形态、结构和功能发生稳定性差异,但遗传物质没有发生变化 D.种子萌发初期增加的主要元素为C元素 3.结构与功能相统一是生物学的基本观点之一。下列叙述不能说明这一观点的是 A.叶绿体内类囊体膜堆叠使膜面积增大,利于光能充分利用 B.神经细胞轴突末梢有大量突起,有利于附着更多的神经递质受体蛋白 C.细胞骨架能维持真核细胞的形态,它与细胞的物质运输等活动有关 D.线粒体内膜向内突起形成悄,有利于附着更多的有氧呼吸有关的酶 4.自噬作用是普遍存在于大部分真核细胞屮的一种现象,是溶酶体对自身结构的吞噬降解,它是 细胞内的再循环系统。下列哪一项不属于自噬作用 A.为细胞内新细胞器的构建提供原料,即细胞结构的再循环 B.吞噬细胞吞噬受病每感染的细胞 C.衰老的细胞进入编程死亡过程屮的细胞内的吞噬 D.清除降解细胞内受损伤的细胞结构、衰老的细胞器 5.与物质跨膜运输相关的叙述正确的是

2020高考理科数学模拟试题精编

2020高考理科数学模拟试题精编 (考试用时:120分钟 试卷满分:150分) 注意事项: 1.作答选择题时,选出每小题答案后,用2B 铅笔在答题卡上对应题目选项的答案信息点涂黑;如需要改动,用橡皮擦干净后,再选涂其他答案。答案不能答在试卷上。 2.非选择题必须用黑色字迹的钢笔或签字笔作答,答案必须写在答题卡各题目指定区域内相应位置上;如需改动,先划掉原来的答案,然后再写上新答案;不准使用铅笔和涂改液。不按以上要求作答无效。 3.考生必须保证答题卡的整洁。考试结束后,将试卷和答题卡一并交回。 第Ⅰ卷 一、选择题(本大题共12小题,每小题5分,共60分.在每小题给出的四个选项中,只有一项是符合题目要求的.) 1.设全集Q ={x |2x 2-5x ≤0,x ∈N},且P ?Q ,则满足条件的集合P 的个数是( ) A .3 B .4 C .7 D .8 2.若复数z =m (m -1)+(m -1)i 是纯虚数,其中m 是实数,则1z =( ) A .i B .-i C .2i D .-2i 3.已知等差数列{a n }的公差为5,前n 项和为S n ,且a 1,a 2,a 5成等比数列,则S 6=( ) A .80 B .85 C .90 D .95 4.小明每天上学都需要经过一个有交通信号灯的十字路口.已知十字路口的交通信号灯绿灯亮的时间为40秒,黄灯5秒,红灯45秒.如果小明每天到路口的时间是随机的,则小明上学时到十字路口需要等待的时间不少于20秒的概率是( ) A.34 B.23 C.12 D.13 5.已知以下三视图中有三个同时表示某一个三棱锥,则不是.. 该三棱锥的三视图的是( ) 6.已知p :a =±1,q :函数f (x )=ln(x +a 2+x 2)为奇函数,则p 是q 成立的( )

2020年高考文科数学模拟试卷及答案(共三套)

2020年高考文科数学模拟试卷及答案(共三套) 2020年高考文科数学模拟试卷及答案(一) 一、选择题:(本大题共12小题,每小题5分,在每小题给出的四个选项中,只有一项符合题目的要求) 1、设集合{}1 2 3 4U =,,,,集合{}2540A x x x =∈-+

高考理科数学模拟试题

高三上期第二次周练 数学(理科) 第Ⅰ卷(选择题, 共60分) 一、选择题:本大题共12个小题,每小题5分,共60分.在每小题给出的四个选项中, 只有一项是符合题目要求的. 1.设集合{}=0123A ,,,, {}=21B x x a a A =-∈,, 则=( )A B ? A. {}12, B. {}13, C. {}01 , D. {}13-, 2.已知i 是虚数单位, 复数z 满足()12i z i +=, 则z 的虚部是( ) A. i - B. i C. 1- D. 1 3.在等比数列{}n a 中, 13521a a a ++=, 24642a a a ++=, 则数列{}n a 的前9项的和9S =( ) A. 255 B. 256 C. 511 D. 512 4.如图所示的阴影部分是由x 轴, 直线1x =以及曲线1x y e =-围成, 现向矩形区域OABC 内随机投掷一点, 则该点落在阴影区域的概率是( ) A. 1e B. 21 e e -- C. 11e - D. 11e - 5.在 52)(y x x ++ 的展开式中, 含 2 5y x 的项的系数是( ) A. 10 B. 20 C. 30 D. 60 6.已知一个简单几何体的三视图如右图所示, 则该几何体的 体积为 ( ) A. 36π+ B. 66π+ C. 312π+ D. 12 7.已知函数 ())2log(x a x f -= 在 )1,(-∞上单调递减, 则a 的取值范围是( ) A. 11<<

2018高考文科数学模拟试题

2018高考文科数学模拟试题 一、选择题: 1.已知命题,,则是成立的( )条件. A .充分不必要 B .必要不充分 C .既不充分有不必要 D .充要 2.已知复数,,,是虚数单位,若是实数,则( ) A . B . C . D . 3.下列函数中既是偶函数又在上单调递增的函数是( ) A . B . C . D . 4.已知变量,之间满足线性相关关系 ,且,之间的相关数据如下表所示:则( ) A .0.8 B .1.8 C .0.6 D .1.6 5.若变量,满足约束条件,则的最大值是( ) A .0 B .2 C .5 D .6 6.已知等差数列的公差和首项都不为,且成等比数列,则( ) A . B . C . D . 7.我国古代数学名著《孙子算经》中有如下问题:“今有三女,长女五日一归,中女四日一归,少女三日一归.问:三女何日相会?”意思是:“一家出嫁的三个女儿中,大女儿每五天回一次娘家,二女儿每四天回一次娘家,小女儿每三天回一次娘家.三个女儿从娘家同一天走后,至少再隔多少天三人再次相会?”假如回娘家当天均回夫家,若当地风俗正月初二都要回娘家,则从正月初三算起的 :12p x -<<2:log 1q x

人教版2020年高考数学仿真模拟试题 文1新人教版

2019年高考数学仿真模拟试题 本试卷共6页。考试结束后,将本试卷和答题卡一并交回。 注意事项: 1.答题前,考生先将自己的姓名、准考证号码填写清楚,将条形码准 确粘贴在考生信息条形码粘贴区。 2.选择题必须使用2B 铅笔填涂;非选择题必须使用0.5毫米黑色字迹的 签字笔书写,字体工整、笔迹清楚。 3.请按照题号顺序在答题卡各题目的答题区域内作答,超出答题区域 书写的答案无效;在草稿纸、试卷上答题无效。 4.作图可先使用铅笔画出,确定后必须用黑色字迹的签字笔描黑。 5.保持卡面清洁,不要折叠,不要弄破、弄皱。不准使用涂改液、修正带、 刮纸刀。 一、选择题:本题共12小题,每小题5分,共60分。在每小题给出的四个选 项中,只有一项是符合题目要求的。 1.已知集合{}3,2,1=A ,{} Z x x x x B ∈<--= ,0322 ,则=B A Y A .{}2,1 B .{}3,2,1,0 C .[]2,1 D .[]3,0 2.复数 i i 212-+的共轭复数的虚部是 A .53- B .53 C .1- D .1 3.下列结论正确的是 A .若直线⊥l 平面α,直线⊥l 平面β,且βα,不共面,则βα// B .若直线//l 平面α,直线//l 平面β,则βα// C .若两直线21l l 、与平面α所成的角相等,则21//l l D .若直线l 上两个不同的点B A 、到平面α的距离相等,则α//l 4.已知34cos sin = -αα,则=?? ? ??-απ4cos 2 A. 91 B. 92 C. 94 D. 9 5 5.设直线l 过双曲线C 的一个焦点,且与C 的一条对称轴垂直,l 与C 交于B A 、两点,

宁夏银川一中2017届高三下学期第一次模拟理综-生物试卷含答案.doc

绝密★启用前 2017年普通高等学校招生全国统一考试 理科综合能力测试-生物部分 (银川一中第一次模拟考试) 本试卷分第I卷(选择题)和第II卷(非选择题)两部分,其中第II卷第33?40题为选考题,其它题为必考题。考生作答时,将答案答在答题卡上,在本试卷上答题无效。考试结束后,将本试卷和答题卡一并交回。 注意事项: 1. 答题前,考生务必先将自己的姓名、准考证号填写在答题卡上,认真核对条形码上的姓名、准考证号,并将条形码粘贴在答题卡的指定位置上。 2. 选择题答案使用2B铅笔填涂,如需改动,用橡皮擦干净后,再选涂其他答案的标号; 非选择题答案使用0. 5毫米的黑色中性(签字)笔或碳素笔书写,字体工整、笔迹清楚。 3. 考生必须按照题号在答题卡各题号相对应的答题区域(黑色线框)内作答,写出草稿纸上、超出答题区域或非题号对应的答题区域的答案一律无效。 4. 保持卡面清洁,不折叠,不破损。 5. 做选考题时,考生按照题目要求作答,并用2B铅笔在答题卡上把所选题目对应的题目涂黑。 可能用到的相对原子质量:H-l C-12 N-14 0-16 S-32 Fe-56 Cu-64 Ba-137 第I卷 一、选择题:本题共13小题,每小题6分,在每小题给出的四个选项中,只有一项是符合题 目要求的。 1. 破伤风杆菌一般在较深伤口内繁殖,可产生外毒素使机体发病,而外毒素的毒性可被胰蛋 白酶解除。下列有关分析错误的是 A. 破伤风杆菌的呼吸方式为无氧呼吸 B. 破伤风杆菌分泌的外毒素是在内质网上的核糖体合成的 C. 破伤风杆菌分泌的外毒素不能直接作为疫苗进行预防接种 D. 破伤风杆菌生命活动所需的能量来源于有机物的氧化分解 2. 科研人员研究小鼠癌变与基因突变的关系。如图为小鼠结肠癌发生过程中细胞形态和部分

高考数学模拟试题(文科)及答案

凹凸教育高考文科数学模拟题 本试卷分第Ⅰ卷(选择题)和第Ⅱ卷(非选择题)两部分,满分150分,考试时间120分钟. 第Ⅰ卷 一、选择题:本大题共12小题,每小题5分,共60分.在每小题给出的四个选项中,只有一项是符合题目要求的. 1.已知全集,U R =且{}{} 2|12,|680, A x x B x x x =->=-+<则()U C A B I 等于 (A )[1,4)- (B )(2,3] (C )(2,3) (D )(1,4)- 2.已知i z i 32)33(-=?+(i 是虚数单位),那么复数z 对应的点位于复平面内的 (A )第一象限 (B )第二象限 (C )第三象限 (D )第四象限 3.下列有关命题的说法正确的是 (A )命题“若21x =,则1=x ”的否命题为:“若21x =,则1x ≠”. (B )“1x =-”是“2560x x --=”的必要不充分条件. (C )命题“x R ?∈,使得210x x ++<”的否定是:“x R ?∈, 均有210x x ++<”. (D )命题“若x y =,则sin sin x y =”的逆否命题为真命题. 4.某人骑自行车沿直线匀速旅行,先前进了a 千米,休息了一段时间,又沿原路返回b 千米()a b <,再前进c 千米,则此人离起点的距离s 与时间t 的关系示意图是 (A ) (B ) (C ) (D ) 5.已知(31)4,1()log ,1a a x a x f x x x -+

2019年高考数学模拟试题含答案

F D C B A 2019年高考数学模拟试题(理科) 注意事项: 1.本试卷分第Ⅰ卷(选择题)和第Ⅱ卷(非选择题)两部分。答卷前,考生务必将自己的姓名、准考证号填写在答题卡上。 2.回答第Ⅰ卷时,选出每小题答案后,用铅笔把答题卡上对应题目的答案标号涂黑。如需改动,用橡皮擦干净后,再选涂其他答案标号。写在本试卷上无效。 3.回答第Ⅱ卷时,将答案写在答题卡上。写在本试卷上无效。 4.考试结束后,将本试卷和答题卡一并收回。 一.选择题:本大题共12个小题,每小题5分,共60分。在每小题给出的四个选项中只有一项是符合题目要求的 1.已知集合}032{2>--=x x x A ,}4,3,2{=B ,则B A C R ?)(= A .}3,2{ B .}4,3,2{ C .}2{ D .φ 2.已知i 是虚数单位,i z += 31 ,则z z ?= A .5 B .10 C . 10 1 D . 5 1 3.执行如图所示的程序框图,若输入的点为(1,1)P ,则输出的n 值为 A .3 B .4 C .5 D .6 (第3题) (第4题) 4.如图,ABCD 是边长为8的正方形,若1 3 DE EC =,且F 为BC 的中点,则EA EF ?=

A .10 B .12 C .16 D .20 5.若实数y x ,满足?? ???≥≤-≤+012y x y y x ,则y x z 82?=的最大值是 A .4 B .8 C .16 D .32 6.一个棱锥的三视图如右图,则该棱锥的表面积为 A .3228516++ B .32532+ C .32216+ D .32216516++ 7. 5张卡片上分别写有0,1,2,3,4,若从这5张卡片中随机取出2张,则取出的2张卡片上的数字之和大于5的概率是 A . 101 B .51 C .103 D .5 4 8.设n S 是数列}{n a 的前n 项和,且11-=a ,11++?=n n n S S a ,则5a = A . 301 B .031- C .021 D .20 1 - 9. 函数()1ln 1x f x x -=+的大致图像为 10. 底面为矩形的四棱锥ABCD P -的体积为8,若⊥PA 平面ABCD ,且3=PA ,则四棱锥 ABCD P -的外接球体积最小值是

宁夏银川一中2021届高三第四次月考理综-生物试题 Word版含答案

银川一中2021届高三年级第四次月考 理科综合能力测试-生物 命题教师:注意事项: 1.答卷前,考生务必将自己的姓名、准考证号填写在答题卡上。 2.作答时,务必将答案写在答题卡上。写在本试卷及草稿纸上无效。 3.考试结束后,将本试卷和答题卡一并交回。 可能用到的相对原子质量:H-1 C-12 O-16 Ni-59 Cu-64 Mg-24 I-127 一、选择题:本题包括13小题。每小题6分,共78分,在每小题给出的四个选项中,只有一个选项符合题意。 1.脂肽是一种高效环保材料,在化妆品、洗涤工业等领域得到广泛应用,脂肽是由枯草芽孢杆菌分泌的生物表面活性剂,其结构如下图所示,下列叙述正确的是 A.该化合物的空间结构主要由氨基酸的空间结构决定 B.该化合物加热变性后仍能与双缩脲试剂产生紫色反应 C.枯草芽孢杆菌分泌脂肽需要经过内质网、高尔基体等结构 D.该化合物的合成至少要经过7次氨基酸之间的脱水缩合反应 2.2020年10月5日,诺贝尔生理学或医学奖授予哈维·阿尔特、迈克尔·霍顿和查尔斯·M·赖斯三位科学家,以表彰他们在发现“丙型肝炎病毒”(即HCV)方面作出的贡献。该病毒体呈球形,为单股正链RNA病毒(中心法则:+RNA→蛋白质;+RNA→-RNA→大量+RNA),其衣壳外包绕含脂质的囊膜,囊膜上有刺突。下列关于该病毒的说法正确的是 A.HCV的预防只需要切断传播途径和注射疫苗即可加以防控 B.HCV与HIV都可使人类染病,可通过无丝分裂延续子代 C.HCV的增殖离不开宿主细胞提供氨基酸、核苷酸和核糖体等 D.若要培养该病毒用于研究疫苗,需要提供相应的营养物质和活的大肠杆菌 3.下列有关“基本骨架”或“骨架”的叙述,错误的是 A.真核细胞中由纤维素组成细胞骨架,与细胞运动、分裂和分化有关 B.DNA分子中的脱氧核糖和磷酸交替连接排在外侧构成基本骨架

高考理科数学模拟试卷(含答案)

高考理科数学模拟试卷(含答案) 本试卷分选择题和非选择题两部分. 第Ⅰ卷(选择题)1至2页,第Ⅱ卷 (非选择题)3至4页,共4页,满分150分,考试时间120分钟. 注意事项: 1.答题前,务必将自己的姓名、考籍号填写在答题卡规定的位置上. 2.答选择题时,必须使用2B 铅笔将答题卡上对应题目的答案标号涂黑,如需改动,用橡皮擦擦干净后,再选涂其它答案标号. 3.答非选择题时,必须使用0.5毫米黑色签字笔,将答案书写在答题卡规定位置上. 4.所有题目必须在答题卡上作答,在试题卷上答题无效. 5.考试结束后,只将答题卡交回. 第Ⅰ卷 (选择题,共60分) 一、选择题:本大题共12小题,每小题5分,共60分.在每小题给出的四个选项中,只有一项是符合题目要求的. 1. 已知集合2 {1,0,1,2,3,4},{|,}A B y y x x A =-==∈,则A B =I (A){0,1,2} (B){0,1,4} (C){1,0,1,2}- (D){1,0,1,4}- 2. 已知复数1 1i z = +,则||z = (A) 2 (B)1 (D)2 3. 设函数()f x 为奇函数,当0x >时,2 ()2,f x x =-则((1))f f = (A)1- (B)2- (C)1 (D)2 4. 已知单位向量12,e e 的夹角为 2π 3 ,则122e e -= (A)3 (B)7 5. 已知双曲线22 221(0,0)x y a b a b -=>>的渐近线方程为3y x =±,则双曲线的离心率是 (B) 3 (C)10 (D)10 9 6. 在等比数列{}n a 中,10,a >则“41a a <”是“53a a <”的

密接式车钩缓冲装置检修作业指导书

作业指导书 密接式钩缓装置检修

密接式钩缓装置检修岗位作业要领 标准化密接式钩缓检修岗位安全风险提示 1.工作时必须穿戴防砸皮鞋,防止车轮碾伤或铁屑扎伤; 2.必须戴安全帽、防护眼镜,防止异物溅入眼睛; 3.检修时要轻拿轻放,检修、搬运、存放时均不得落地; 4.使用升降小车取钩时,注意安装牢固后再分解车钩。

目次 1.工前准备 (1) 2.密接式车钩装置与车体分离 (2) 3.分解钩缓装置 (3) 4.零部件检修 (7) 5.密接钩装置组装及试验 (14) 6.密接钩装车 (18) 7.钩高调整 (20) 8.完工清理 (22)

钩缓装置检修作业指导书类别:A2、A3级检修系统:车钩缓冲装置部件:密接式钩缓装置 密接式钩缓装置检修作业指导书适用车型:25T 作业人员:车辆钳工3-4名(岗位合格证)作业时间:6小时/个 工装工具:1.钢卷尺; 2.钩缓升降车; 3.活动扳手、手锤、钩引、力矩扳手; 4.托盘。作业材料:砂轮片、护目镜、扫帚、簸箕、拖布、平板调整垫 作业场所:辅库 环境要求:通风、自然采光良好 操作规程:钩缓升降车技术操作规程

参考资料: 1.《铁路客车段修规程(试行)》.(铁总运〔2014〕349号). 2.《车辆钳工》.中国铁道出版社.2011 3.《车辆处转发中国铁路总公司运输局关于印发客车常见故障专项整治方案的通知》(辆函〔2015〕240号) 4.《中国铁路总公司运输局关于印发客车检修规程勘误的通知》(运辆客车函〔2016〕137号) 安全防护及注意事项: 1.——徒手搬运配件时,防止掉落,避免伤及人员; 2.——打磨配件时,注意力集中,避免伤及人员。 基本技术要求: 1.车钩缓冲装置整体分解下车,清除锈垢,可见部位外观检查须良好,探伤部件须露出金属本色。回转机构、连 挂系统分解检修,缓冲器、钩体、安装座状态检查,表面无裂纹。橡胶件A2修状态不良时更新,A3修时更新。 2.探伤件经热处理、调修后或经过焊修、机械加工的探伤部位须复探。 3.有力矩要求的防松螺母均须按表一标准用扭力扳手检查,其余螺母、螺栓可参考执行。 4.所有组装配件须是合格品。

2019高考文科数学模拟试卷(文科)一

2019高考文科数学模拟试卷 一、选择题 1. 已知集合{ } 2 230A x N x x =∈+-≤,则集合A 的真子集个数为 (A )31 (B )32 (C )3 (D )4 2. 若复数()()21z ai i =-+的实部为1,则其虚部为 (A )3 (B )3i (C ) 1 (D )i 3.设实数2log 3a =,12 13b ??= ??? ,13 log 2c =,则有 (A )a b c >> (B )a c b >> (C )b a c >> (D )b c a >> 4.已知1 cos()43 π α+ =,则sin2α= (A )79- (B )79 (C )22± (D )79 ± 5. 宋元时期数学名著《算学启蒙》中有关于“松竹并生”的问题:松长五尺,竹长两尺,松日自半,竹日自倍,松竹何日而长等,右图是源于其思想的一个程序框图,若输入的,a b 分别为5,2,则输出的n 等于 (A )2 (B )3 (C )4 (D )5 6.如图,AB 为圆O 的一条弦,且4AB =,则OA AB =u u u r u u u r g (A )4 (B )-4 (C )8 (D )-8 7.以下命题正确的个数是 ①函数()f x 在0x x =处导数存在,若0:()0p f x '=;0:q x x =是()f x 的极值点, 则p 是q 的必要不充分条件 ②实数G 为实数a ,b 的等比中项,则G ab =± ③两个非零向量a r 与b r ,若夹角0a b

宁夏银川一中2021届高三下学期返校测试理综-生物试题

银川一中2021届高三年级返校测试 理科综合能力试卷-生物部分 命题教师:注意事项: 1.答卷前,考生务必将自己的姓名、准考证号填写在答题卡上。 2.作答时,务必将答案写在答题卡上。写在本试卷及草稿纸上无效。 3.考试结束后,将本试卷和答题卡一并交回。 可能用到的相对原子质量:H-1 N-14 O-16 Na-23 S-32 Mn-55 一、选择题:本题包括13小题。每小题6分,共78分,在每小题给出的四个选项中,只 有一个选项符合题意。 1.用驴皮熬成的阿胶已有两千多年的应用历史。其滋补作用体现为:加快新陈代谢,促进组织细胞再生和增强免疫力。下列说法正确的是 A.阿胶具有滋补作用的原因是含有对人体有益的Zn、Fe、Ca等微量元素 B.驴皮细胞的脂肪含量较低,其主要储能物质是葡萄糖 C.食用阿胶能减少人体对糖类的摄入,因为阿胶中含有的多糖主要是纤维素 D.用驴皮熬成的阿胶为人体提供的主要营养物质之一可能是必需氨基酸 2.科学家使用相同的完全培养液分别培 养水稻和番茄,一段时间后,检测培 养液中的离子浓度,如图所示。 下列说法错误的是 A.水稻和番茄对离子吸收具选择性的 直接原因与膜上载体有关 B.定期向培养液中通入空气有助于促进根细胞对离子的吸收 C.Mg和Ca等矿质元素在细胞中主要以离子形式存在 D.水稻对Mg2+和Ca2+的吸收量比水多,番茄吸收水比吸收SiO2+的量多 3.无丝分裂又叫核粒纽丝分裂,是最早被发现的一种细胞分裂方式,细胞不经过有丝分裂各时期分裂为大致相等的两部分的细胞分裂方式。下列叙述正确的是 A.无丝分裂不进行DNA分子的复制

B.蛙的红细胞和细菌都能进行无丝分裂 C.无丝分裂中,核膜和核仁不消失,没有染色体的变化 D.秋水仙素可抑制无丝分裂中细胞的分裂,从而使细胞体积增大 4.达尔文的自然选择学说,揭示了生物进化的机制,解释了适应性的形成和物种形成的原因;但其理论并不完善,现代生物进化理论极大地丰富和发展了达尔文的自然选择学说。 下列有关生物进化的描述错误的是 A.自然选择学说指出可遗传变异是生物进化的原材料,包括突变和基因重组 B.适应的形成是由于具有有利变异的个体更容易生存并留下后代,是自然选择的结果C.现代生物进化理论在分子水平和种群水平对达尔文自然选择学说进行了补充与丰富D.中性突变学说认为决定生物进化方向的是中性突变的逐渐积累,而不是自然选择5.对照实验是生物科学探究中常用的实验方法之一,设置对照实验的方法也多种多样。下列关于对照实验的说法,错误的是 A.“低温诱导染色体加倍”的实验中,作为对照的常温组也要用卡诺氏液处理 B.“探究生长素类似物促进扦插枝条生根”的预实验中,不需要设置对照实验 C.“探究血浆维持pH相对稳定”的实验中,清水组和缓冲液组都作为对照组 D.沃泰默探究狗胰液分泌调节的实验中,将稀盐酸注入狗的血液能起对照作用 6.下列说法中不属于负反馈调节的是 A.胰岛素的分泌量增加会降低血糖浓度,血糖浓度反过来影响胰岛素的分泌 B.甲状旁腺激素引起血钙含量升高,高血钙又抑制了甲状旁腺的分泌 C.一片草原的兔子数量增多,导致青草减少的同时兔的天敌数量增多,会导致兔子的数量减少 D.促甲状腺激素释放激素会促进垂体分泌促甲状腺激素,促甲状腺激素会促进甲状腺分泌甲状腺激素 29.(12分) 某研究小组利用某植物进行下列关于光合作用有关的实验: 第一步:将一植株保留一叶片a和一幼嫩果实c,b为叶片和果实连接的茎; 第二步:把处理好的植株放入一透明小室,并放到光合作用最适的温度和光照强度下培养; 第三步:向小室充入一定量14CO2,密封小室,立即用仪器测定a、b、c三处的放射性物质含量并记录;

全国高考文科数学模拟试题及答案

2017年普通高等学校招生全国统一模拟考试 文科数学 考场:___________座位号:___________ 本试卷分第I 卷(选择题)和第II 卷(非选择题)两部分。满分150分,考试时间120分 钟. 第I 卷(选择题共60分) 选择题:本大题共12小题,每小题5分,共60分.在每小题给出的四个选项中,只有一项是符合题目要求的。 (1)设集合A={4,5,7,9},B={3,4,7,8,9},全集U A B =,则集合 () U A B 中的元素共有( ) (A) 3个 (B ) 4个 (C )5个 (D )6个 (2)(2) 复数 3223i i +=-( ) (A )1 (B )1- (C )i (D)i - (3)已知()()3,2,1,0a b =-=-,向量a b λ+与2a b -垂直,则实数λ的值为( ) (A )17- (B )17 (C )1 6 - (D )16 (4)已知tan a =4,cot β=1 3 ,则tan(a+β)=( ) (A)711 (B)711- (C) 713 (D) 713 - (5)已知双曲线)0(13 2 22>=- a y a x 的离心率为2,则=a ( ) A. 2 B. 26 C. 2 5 D. 1 (6)已知函数()f x 的反函数为()()10g x x =+2lgx >,则=+)1()1(g f ( ) (A )0 (B )1 (C )2 (D )4

(7)在函数①|2|cos x y =,②|cos |x y = ,③)62cos(π + =x y ,④)4 2tan(π -=x y 中,最小正周期为π的所有函数为( ) A.①②③ B. ①③④ C. ②④ D. ①③ (8)如图,网格纸的各小格都是正方形,粗实线画出的事一个几何体的三视图,则这个几 何体是( ) A.三棱锥 B.三棱柱 C.四棱锥 D.四棱柱 (9)若0tan >α,则( ) A. 0sin >α B. 0cos >α C. 02sin >α D. 02cos >α (10) 如果函数3cos(2)y x φ=+的图像关于点4(,0)3 π 中心对称,那么φ的最小值为( ) (A) 6π (B) 4π (C) 3π (D) 2 π (11)设,x y 满足24, 1,22,x y x y x y +≥?? -≥??-≤? 则z x y =+ ( ) (A )有最小值2,最大值3 (B )有最小值2,无最大值 (C )有最大值3,无最小值 (D )既无最小值,也无最大值 (12)已知椭圆2 2:12 x C y +=的右焦点为F,右准线l ,点A l ∈,线段AF 交C 于点B 。若3FA FB =,则AF =( ) (A) (B) 2 (C) (D) 3 第Ⅱ卷(非选择题 共90分)

相关文档
相关文档 最新文档