工程管理专业英语考试重点翻译

工程管理专业英语考试重点翻译
工程管理专业英语考试重点翻译

土木工程类专业英文文献及翻译

PA VEMENT PROBLEMS CAUSED BY COLLAPSIBLE SUBGRADES By Sandra L. Houston,1 Associate Member, ASCE (Reviewed by the Highway Division) ABSTRACT: Problem subgrade materials consisting of collapsible soils are com- mon in arid environments, which have climatic conditions and depositional and weathering processes favorable to their formation. Included herein is a discussion of predictive techniques that use commonly available laboratory equipment and testing methods for obtaining reliable estimates of the volume change for these problem soils. A method for predicting relevant stresses and corresponding collapse strains for typical pavement subgrades is presented. Relatively simple methods of evaluating potential volume change, based on results of familiar laboratory tests, are used. INTRODUCTION When a soil is given free access to water, it may decrease in volume, increase in volume, or do nothing. A soil that increases in volume is called a swelling or expansive soil, and a soil that decreases in volume is called a collapsible soil. The amount of volume change that occurs depends on the soil type and structure, the initial soil density, the imposed stress state, and the degree and extent of wetting. Subgrade materials comprised of soils that change volume upon wetting have caused distress to highways since the be- ginning of the professional practice and have cost many millions of dollars in roadway repairs. The prediction of the volume changes that may occur in the field is the first step in making an economic decision for dealing with these problem subgrade materials. Each project will have different design considerations, economic con- straints, and risk factors that will have to be taken into account. However, with a reliable method for making volume change predictions, the best design relative to the subgrade soils becomes a matter of economic comparison, and a much more rational design approach may be made. For example, typical techniques for dealing with expansive clays include: (1) In situ treatments with substances such as lime, cement, or fly-ash; (2) seepage barriers and/ or drainage systems; or (3) a computing of the serviceability loss and a mod- ification of the design to "accept" the anticipated expansion. In order to make the most economical decision, the amount of volume change (especially non- uniform volume change) must be accurately estimated, and the degree of road roughness evaluated from these data. Similarly, alternative design techniques are available for any roadway problem. The emphasis here will be placed on presenting economical and simple methods for: (1) Determining whether the subgrade materials are collapsible; and (2) estimating the amount of volume change that is likely to occur in the 'Asst. Prof., Ctr. for Advanced Res. in Transp., Arizona State Univ., Tempe, AZ 85287. Note. Discussion open until April 1, 1989. To extend the closing date one month,

交通工程专业英语翻译

公路建设 交通1001 绿学长公路路面结构的地基和分流路就像火车必须在轨道上行驶一样,如果没有桥梁、隧道等特殊结构,那么就需要在原来的土壤或者土堤上修建地基。所以,建造地基也就是道路设施的第一步。 [现场清理] 清理现场前的所有步骤和多数其他施工作业一样。道路开荒在农村地区有时可能只要移除杂草、灌木和其他植物或作物。但是,有时也可能会涉及到大树木、树桩和杂物的处理。我们公认的清理程序还包括处理植物的根茎,因为一旦保留了它们,它们就可能会腐烂并留下空隙,从而导致土质发生沉降。在附近区域进行选择性清除有时也是很必要的。 [开挖] 开挖是一种松动和清除障碍物和标的建设区域岩石与杂物的过程。设备的选取取决于路面材料的质量,并且要考虑到我们的移动作业和设备的处置方法。 开挖的对象通常被描述为'磐石','松散岩'或者“普通石块”,其中,“普通石块”意味着没有其他什么特别的分类了。磐石,即坚硬的岩石,几乎总需要钻孔和爆破才能开挖,然后用挖掘机、大卡车或其他大型牵引铲装车辆运输搬运。爆破的碎石块需要用推土机来搬运或转

移一小段距离,实际上这就像是开着一辆巨大的带铲子的拖拉机。“松散岩”,包括风化、腐烂的岩石和夹杂着泥土的较大石块颗粒,我们只需要装载机铲挖而不需要任何之前用的爆破。然而,你可能认为通过进一步松动爆破能够加快工程进度,减少设备损耗并降低成本,但挖掘机铲挖想与爆破施工同时进行却不容易。 近年来,大型松土机被安装在巨大的履带式拖拉机上,被一个或更多的额外的拖拉机推动的方式,已成功地用于破碎松动或断裂岩石。松动的岩石由挖掘机处理,跟“普通”的开挖一样。 “普通开挖”或土方开挖的分级程序受成本影响。如果施工对象被拖运的距离超过200英尺(60米)或下陡坡,应用轨道或轮式推土机运送,这样较为合算。对于较长距离的运送,则使用自动化刮拉胶轮牵引车来运送,并由拖拉机装填以降低成本。有时它更适合用带有电力驱动分离拖片的牵引车来清障。对于限制车长和轴重的地区,应采用后部或底部带铲的装载机和挖掘机,皮带式运输机可能是最划算的道路装载卡车。有时,天气可能会影响到施工进程。例如,胶轮拖拉机车在湿滑的路面施工就比较困难。因此,在下暴雨的时候,用刮拉履带式拖拉机会更便于施工。 运土工业自1925年以来发生了革命性变化,最常用的工具是一个至多1/2码(0.4米),由两到四匹马或骡子拉的牵引刮板。例如,15码(1100米)的装载机需要和125吨的卡车组合使用。32码(2400米)的铲运机破土能力与两个发动机安装在后部刮板用来供应增加牵

工程管理专业毕业设计外文翻译(外文+翻译)

Study on Project Cost Control of Construction Enterprises By: R. Max Wideman Abstract With the increasing maturity of construction market, the competition between construction enterprises is becoming fierce. The project profit is gradually decreasing. It demands that all construction enterprises enhance their cost control, lower costs, improve management efficiency and gain maximal profits. This paper analyses the existing problems on project cost control of Chinese construction enterprises, and proposes some suggestions to improve project cost control system. Key Words :Construction enterprises, Project management, Cost control After joining the WTO, with Chinese construction market becoming integrated, the competition among architectural enterprises is turning more intense. Construction enterprises must continually enhance the overall competitiveness if they want to develop further at home and abroad construction market. Construction Enterprises basically adopt the "project management-centered" model, therefore, it is particularly important to strengthen project cost control. 1.The Current Domestic Project Cost Classification and Control Methods Cost refers to the consumption from producing and selling of certain products, with the performance of various monetary standing for materialized labor and labor-consuming. Direct and indirect costs constitute the total cost, also known as production cost or manufacturing cost. Enterprise product cost is the comprehensive indicator to measure enterprise quality of all aspects. It is not only the fund compensation scale, but also the basis to examine the implementation of cost plan. Besides, it can provide reference for product pricing According to the above-mentioned definition and current domestic cost classification, construction project cost can be divided into direct costs and indirect costs. Direct costs include material cost, personnel cost, construction machinery cost, material transportation cost, temporarily facility cost, engineering cost and other direct cost. Indirect costs mainly result from project management and company's cost-sharing, covering project operating costs (covering the commission of foreign projects), project's management costs (including exchange losses of

土木工程岩土类毕业设计外文翻译

姓名: 学号: 10447425 X X 大学 毕业设计(论文)外文翻译 (2014届) 外文题目Developments in excavation bracing systems 译文题目开挖工程支撑体系的发展 外文出处Tunnelling and Underground Space Technology 31 (2012) 107–116 学生XXX 学院XXXX 专业班级XXXXX 校内指导教师XXX 专业技术职务XXXXX 校外指导老师专业技术职务 二○一三年十二月

开挖工程支撑体系的发展 1.引言 几乎所有土木工程建设项目(如建筑物,道路,隧道,桥梁,污水处理厂,管道,下水道)都涉及泥土挖掘的一些工程量。往往由于由相邻的结构,特性线,或使用权空间的限制,必须要一个土地固定系统,以允许土壤被挖掘到所需的深度。历史上,许多挖掘支撑系统已经开发出来。其中,现在比较常见的几种方法是:板桩,钻孔桩墙,泥浆墙。 土地固定系统的选择是由技术性能要求和施工可行性(例如手段,方法)决定的,包括执行的可靠性,而成本考虑了这些之后,其他问题也得到解决。通常环境后果(用于处理废泥浆和钻井液如监管要求)也非常被关注(邱阳、1998)。 土地固定系统通常是建设项目的较大的一个组成部分。如果不能按时完成项目,将极大地影响总成本。通常首先建造支撑,在许多情况下,临时支撑系统是用于支持在挖掘以允许进行不断施工,直到永久系统被构造。临时系统可以被去除或留在原处。 打桩时,因撞击或振动它们可能会被赶入到位。在一般情况下,振动是最昂贵的方法,但只适合于松散颗粒材料,土壤中具有较高电阻(例如,通过鹅卵石)的不能使用。采用打入桩系统通常是中间的成本和适合于软沉积物(包括粘性和非粘性),只要该矿床是免费的鹅卵石或更大的岩石。 通常,垂直元素(例如桩)的前安装挖掘工程和水平元件(如内部支撑或绑回)被安装为挖掘工程的进行下去,从而限制了跨距长度,以便减少在垂直开发弯矩元素。在填充情况下,桩可先设置,从在斜坡的底部其嵌入悬挑起来,安装作为填充进步水平元素(如搭背或土钉)。如果滞后是用来保持垂直元素之间的土壤中,它被安装为挖掘工程的进行下去,或之前以填补位置。 吉尔- 马丁等人(2010)提供了一个数值计算程序,以获取圆形桩承受轴向载荷和统一标志(如悬臂桩)的单轴弯矩的最佳纵筋。他们开发的两种优化流程:用一个或两个直径为纵向钢筋。优化增强模式允许大量减少的设计要求钢筋的用量,这些减少纵向钢筋可达到50%相对传统的,均匀分布的加固方案。 加固桩集中纵向钢筋最佳的位置在受拉区。除了节约钢筋,所述非对称加强钢筋图案提高抗弯刚度,通过增加转动惯量的转化部分的时刻。这种增加的刚性可能会在一段时间内增加的变形与蠕变相关的费用。评估相对于传统的非对称加强桩的优点,对称,钢筋桩被服务的条件下全面测试来完成的,这种试验是为了验证结构的可行性和取得的变形的原位测量。 基于现场试验中,用于优化的加强图案的优点浇铸钻出孔(CIDH)在巴塞罗那的

交通工程专业英语翻译1

The Evolution of Transport 交通运输业的发展 交通运输的发展一直密切联系在一起的人类发展的整个地球的历史。运输的早期功能是为了满足提供食物供给和搬运建筑材料。但是随着部落甚至最后国家的形成,运输的社会和经济功能越来越复杂。起初有需要调动个人,家族,家庭和动物以保护他们的反对,并逃避自然灾害和部族侵略的危险,寻找最好的地方定居。随着种族部落的形成和地理界线的逐步确定,开发新区域、开采新资源、发展社区间的贸易以及捍卫领地,这些都日益需要交通的发展。当第一个国家应运而生,在建立全国的完整性方面,交通运输扮演着重要角色。 基本的社会需求一般都得到照顾后,当地社区可以越来越多地贡献自己的努力,用来加强与其他国家的人民和他们的经济贸易联系,文化和科技发展。而且交通提供了诸如部落间、国际间乃至于洲际间便利的贸易和文化交流。在向有组织的人类社会的演变过程中,这种组织在今天是通过由各国组成的国际化大家庭表现出来的,交通作为人与货物移动的物理过程,电促进了这种发展,不断地经历着技术与组织方面的改变。这些变化是由多种因素和情况引起的。事实上,今天的运输在它的各种形态和组织仍然高度受变化的社会需求和偏好的回应。 显然,首先也是最重要的标准是运输效率。几个世纪以来,特别是在地方经济起飞阶段,社会需要可靠、快速、低成本的运输。为寻找合适的技术相对不受限制。在人类历史上有可靠的时候,快速运输的需求尤其明显,快速的解决办法,为国家自卫所需的时间。在当地和国际冲突的时期内,人类的聪明才智设计出新的传输技术,可往往被证明是为逃生、有时也是为了胜利,的决定性因素。随后完善和发展,这种新技术使我们能够更好地满足日益增加的运输需求,从而改善双方的经济发展和人类福祉。 为更好的战略机动诱导努力提高海上和陆路运输的需要。这导致了更大,更快的船,更可靠,坚固的地面车辆。最后,详细介绍了汽船,铁路,然后是汽车的例证。研究和运输领域的发展终于成为一个具体的目标和组织目标的承诺。随之而来的是专家的集中,越来越复杂的运输技术的进化,如飞机,和最新的火箭推进器。 日益复杂的运输手段逐渐发展成今天的运输系统,其中包括空中、路面和水上运输。特殊行业的需求,引起了发展出相当有限的应用的运输模式,如管道,电缆和传送带。因为当前社会的需求和喜好,以及经济要求的成本效益,现有的各种运输方式一般都能完成特定功能。 尽管运输的潜力以满足社会的流动性需要而水平不断提高,但很明显,这种效果有其代价。大量的交通技术要求和隐含的能耗高的巨大的资金投入生产和经营。因此,一些运输方式对使用者来说是昂贵的。这引起权益问题,因为需要支付运作成本费用是不是所有的人口群体负担,从而限制其流动性和福利。许多国家的政府选择了运输补贴,但很快就意识到,预算往往对其国家的经济造成严重的扭曲。 各种运输方式污染造成的,逐渐成为另一问题,如同世界大多数国家需要应付不断上升的商品流动和人的旅行量严重的问题。在一些地区具有高浓度的人口和产业,这种对环境的不利影响已达到很高的水平。这种损害是这些影响尚未得到充分开发。 最后,这些问题引起世界能源资源的日益减少,特别是石油,已越来越多地阻碍交通服务和操作。大多数现有的运输方式都是以依赖石油衍生品才能正常运转。随着需求量的增长与不衰减得运输和能源供应的有限,逐步提供运输的成本已经稳步增加。特别是,石油需求和石油供应不均衡造成了严重的通货膨胀问题出现在许多国家。尤其沉重的打击与对外部石油供应,其中也经历了他们的经常帐赤字增长部分或完全依赖国家。 运输部门的增加无法满足有效且公平需求的问题,这是一个所有国家必须应对努力促进经济和社会进步。能源供应的限制,高额的资本和运营成本,往往与外汇组件以及与运输有关的环境污染的很大一部分用于这个严重性的问题。但运输是并将继续是世界发展和人类福利的基本要求。没有任何其他选择,只能寻求替代或修改目前的运输系统,使能源消耗和成本永存相关的技术和业务模式的特点是减少对环境的影响,可以保持在最低水平。显然,交通需求的发展将被控制。翻译:设计目标, 公交优先已被看到在整体城市交通的战略目标,不仅包括改善公共汽车(或电车)操作和 克制,car-borne通勤更是一种增强环境,为居民、工人和游客。方法必须为所有这些也有明显的目标而成本和执行。 典型的设计目标为公交优先的措施包括:

工程管理工程造价中英文对照外文翻译文献

中英文资料对照外文翻译 Design phase of the project cost management Abstract Project cost management is the basic contents to determine reasonable and effective control of the project cost. Described the current stage of the project cost management situation on the strengthening of the various stages of construction cost management of the importance of and raised a number of key initiatives. Keywords:cost of the construction project cost management status investment decision phase of the design phase of the implementation phase of the cost management in a market economy, Even under the WTO and China's accession to the world community, China's construction industry how to effectively control construction cost of the construction and management of an important component part. However, the current budget for the construction projects - estimate, budget, Super budget accounts for the "super three" is still widespread and that eventually led to a serious loss of control of project investment. Project cost management is the basic contents to determine reasonable and effective control of the project cost. As the project cost to the project runs through the entire process, stage by stage can be divided into Investment Decision stage, the design and implementation phases. The so-called Project Cost effective control is the optimization of the construction plans and design programs on the basis of in the building process at all stages, use of certain methods and measures to reduce the cost of the projects have a reasonable control on the scope and cost of the approved limits.

土木工程专业外文文献及翻译

( 二 〇 一 二 年 六 月 外文文献及翻译 题 目: About Buiding on the Structure Design 学生姓名: 学 院:土木工程学院 系 别:建筑工程系 专 业:土木工程(建筑工程方向) 班 级:土木08-4班 指导教师:

英文原文: Building construction concrete crack of prevention and processing Abstract The crack problem of concrete is a widespread existence but again difficult in solve of engineering actual problem, this text carried on a study analysis to a little bit familiar crack problem in the concrete engineering, and aim at concrete the circumstance put forward some prevention, processing measure. Keyword:Concrete crack prevention processing Foreword Concrete's ising 1 kind is anticipate by the freestone bone, cement, water and other mixture but formation of the in addition material of quality brittleness not and all material.Because the concrete construction transform with oneself, control etc. a series problem, harden model of in the concrete existence numerous tiny hole, spirit cave and tiny crack, is exactly because these beginning start blemish of existence just make the concrete present one some not and all the characteristic of quality.The tiny crack is a kind of harmless crack and accept concrete heavy, defend Shen and a little bit other use function not a creation to endanger.But after the concrete be subjected to lotus carry, difference in temperature etc. function, tiny crack would continuously of expand with connect, end formation we can see without the

交通工程专业英语翻译The_Evolution_of_Transport

交通工程专业英语翻译The_Evolution_of_Transport The Evolution of Transport 交通运输业的发展 The evolution of transport has been closely linked to the development of humankind throughout the earth’s history(交通运输的发展一直与的人类发展的整 个地球的历史密切联系在一起。 Transport’s early function was to meet the basic need of hauling food supplies and building materials(运输的早期功能是为了满足食物供给和搬运建筑材料的 基本 需求。 But with the formation of tribes,then peoples,and finally nations,the societal and economic functions of transport became more and more complex. 但是随着部落的 产生甚至最后国家的形成,运输在社会和经济起到的功能越来越复杂。 At first there was mobility required for individuals,clans,households,and animals to protect them against,and to escape from,the dangers of natural disasters and tribal aggressions,and in the search for the best places to settle(起初有 需要调动个人, 家族,家庭和动物以保护他们来反抗并逃避自然灾害和部族侵略的危险,从而寻

工程管理专业研究建设项目的工程造价大学毕业论文外文文献翻译及原文

毕业设计(论文) 外文文献翻译 文献、资料中文题目:研究建设项目的工程造价 文献、资料英文题目: 文献、资料来源: 文献、资料发表(出版)日期: 院(部): 专业:工程管理 班级: 姓名: 学号: 指导教师: 翻译日期: 2017.02.14

科技文献翻译 题目:研究建设项目的工程造价 研究建设项目的工程造价 摘要 在工程建设中,中国是拥有世界最大投资金额和具有最多建设项目的国家。它是一 项在建设项目管理上可以为广泛的工程管理人员进行有效的工程造价管理,并合理 确定和保证施工质量和工期的条件控制施工成本的重要课题。 在失去了中国建筑的投资和技术经济工程,分离的控制现状的基础上,通过建设成 本控制的基本理论为指导,探讨控制方法和施工成本的应用,阐述了存在的问题在 施工成本控制和对决心和施工成本的控制这些问题的影响,提出了建设成本控制应 体现在施工前期,整个施工过程中的成本控制,然后介绍了一些程序和应用价值工 程造价的方法在控制建设项目的所有阶段。 关键词:建设成本,成本控制,项目 1.研究的意义 在中国,现有的工程造价管理体系是20世纪50年代制定的,并在1980s.Traditional 施工成本管理方法改进是根据国家统一的配额,从原苏联引进的一种方法。它的特 点是建设成本的计划经济的管理方法,这决定了它无法适应当前市场经济的要求。 在中国传统建筑成本管理方法主要包括两个方面,即建设成本和施工成本控制方法 的测定方法。工程造价的确定传统的主要做法生搬硬套国家或地方统一的配额数量 来确定一个建设项目的成本。虽然这种方法已经历了20多年的改革,到现在为止,计划经济管理模式的影响仍然有已经存在在许多地区。我们传统的工程造价控制的

土木工程毕业设计外文翻译最终中英文

7 Rigid-Frame Structures A rigid-frame high-rise structure typically comprises parallel or orthogonally arranged bents consisting of columns and girders with moment resistant joints. Resistance to horizontal loading is provided by the bending resistance of the columns, girders, and joints. The continuity of the frame also contributes to resisting gravity loading, by reducing the moments in the girders. The advantages of a rigid frame are the simplicity and convenience of its rectangular form.Its unobstructed arrangement, clear of bracing members and structural walls, allows freedom internally for the layout and externally for the fenestration. Rig id frames are considered economical for buildings of up to' about 25 stories, above which their drift resistance is costly to control. If, however, a rigid frame is combined with shear walls or cores, the resulting structure is very much stiffer so that its height potential may extend up to 50 stories or more. A flat plate structure is very similar to a rigid frame, but with slabs replacing the girders As with a rigid frame, horizontal and vertical loadings are resisted in a flat plate structure by the flexural continuity between the vertical and horizontal components. As highly redundant structures, rigid frames are designed initially on the basis of approximate analyses, after which more rigorous analyses and checks can be made. The procedure may typically inc lude the following stages: 1. Estimation of gravity load forces in girders and columns by approximate method. 2. Preliminary estimate of member sizes based on gravity load forces with arbitrary increase in sizes to allow for horizontal loading. 3. Approximate allocation of horizontal loading to bents and preliminary analysis of member forces in bents. 4. Check on drift and adjustment of member sizes if necessary. 5. Check on strength of members for worst combination of gravity and horizontal loading, and adjustment of member sizes if necessary. 6. Computer analysis of total structure for more accurate check on member strengths and drift, with further adjustment of sizes where required. This stage may include the second-order P-Delta effects of gravity loading on the member forces and drift.. 7. Detailed design of members and connections.

土木工程专业英语正文课文翻译

第一课土木工程学 土木工程学作为最老的工程技术学科,是指规划,设计,施工及对建筑环境的管理。此处的环境包括建筑符合科学规范的所有结构,从灌溉和排水系统到火箭发射设施。 土木工程师建造道路,桥梁,管道,大坝,海港,发电厂,给排水系统,医院,学校,公共交通和其他现代社会和大量人口集中地区的基础公共设施。他们也建造私有设施,比如飞机场,铁路,管线,摩天大楼,以及其他设计用作工业,商业和住宅途径的大型结构。此外,土木工程师还规划设计及建造完整的城市和乡镇,并且最近一直在规划设计容纳设施齐全的社区的空间平台。 土木一词来源于拉丁文词“公民”。在1782年,英国人John Smeaton为了把他的非军事工程工作区别于当时占优势地位的军事工程师的工作而采用的名词。自从那时起,土木工程学被用于提及从事公共设施建设的工程师,尽管其包含的领域更为广阔。 领域。因为包含范围太广,土木工程学又被细分为大量的技术专业。不同类型的工程需要多种不同土木工程专业技术。一个项目开始的时候,土木工程师要对场地进行测绘,定位有用的布置,如地下水水位,下水道,和电力线。岩土工程专家则进行土力学试验以确定土壤能否承受工程荷载。环境工程专家研究工程对当地的影响,包括对空气和地下水的可能污染,对当地动植物生活的影响,以及如何让工程设计满足政府针对环境保护的需要。交通工程专家确定必需的不同种类设施以减轻由整个工程造成的对当地公路和其他交通网络的负担。同时,结构工程专家利用初步数据对工程作详细规划,设计和说明。从项目开始到结束,对这些土木工程专家的工作进行监督和调配的则是施工管理专家。根据其他专家所提供的信息,施工管理专家计算材料和人工的数量和花费,所有工作的进度表,订购工作所需要的材料和设备,雇佣承包商和分包商,还要做些额外的监督工作以确保工程能按时按质完成。 贯穿任何给定项目,土木工程师都需要大量使用计算机。计算机用于设计工程中使用的多数元件(即计算机辅助设计,或者CAD)并对其进行管理。计算机成为了现代土木工程师的必备品,因为它使得工程师能有效地掌控所需的大量数据从而确定建造一项工程的最佳方法。 结构工程学。在这一专业领域,土木工程师规划设计各种类型的结构,包括桥梁,大坝,发电厂,设备支撑,海面上的特殊结构,美国太空计划,发射塔,庞大的天文和无线电望远镜,以及许多其他种类的项目。结构工程师应用计算机确定一个结构必须承受的力:自重,风荷载和飓风荷载,建筑材料温度变化引起的胀缩,以及地震荷载。他们也需确定不同种材料如钢筋,混凝土,塑料,石头,沥青,砖,铝或其他建筑材料等的复合作用。 水利工程学。土木工程师在这一领域主要处理水的物理控制方面的种种问题。他们的项目用于帮助预防洪水灾害,提供城市用水和灌溉用水,管理控制河流和水流物,维护河滩及其他滨水设施。此外,他们设计和维护海港,运河与水闸,建造大型水利大坝与小型坝,以及各种类型的围堰,帮助设计海上结构并且确定结构的位置对航行影响。 岩土工程学。专业于这个领域的土木工程师对支撑结构并影响结构行为的土壤和岩石的特性进行分析。他们计算建筑和其他结构由于自重压力可能引起的沉降,并采取措施使之减少到最小。他们也需计算并确定如何加强斜坡和填充物的稳定性以及如何保护结构免受地震和地下水的影响。 环境工程学。在这一工程学分支中,土木工程师设计,建造并监视系统以提供安全的饮用水,同时预防和控制地表和地下水资源供给的污染。他们也设计,建造并监视工程以控制甚至消除对土地和空气的污染。

工程管理专业英语翻译(第二版)徐勇戈

U2-S1什么是项目管理? 建筑项目管理不仅需要对设计和实施过程有所理解,而且需要现代管理知识。建设项目有一组明确的目标和约束,比如竣工日期。尽管相关的技术、组织机构或流程会有所不同,但建设项目同其他一些如航天、医药和能源等准等领域的项目在管理上仍然有共同之处。 一般来说,项目管理和以项目任务为导向的企业宏观管理不同,待项目任务的完成后,项目组织通常也会随之终止。(美国)项目管理学会对项目管理学科有如下定义:项目管理是一门指导和协调人力物力资源的艺术,在项目整个生命周期,应用现代管理技术完成预定的规模、成本、时间、质量和参与满意度目标。 与此形成对照,一般的工商企业管理更广泛地着眼于业务的更加连贯性和连续性。然而,由于这两者之间有足够的相似和差异,使得现代管理技术开发宏观管理可以用于项目管理。 项目管理框架的基本要素可以用图2-1表示。其中,应用宏观管理知识和熟悉项目相关知识领域是不可或缺的。辅助性学科如计算机科学和决策科学也会发挥重要作用。实际上,现代管理实践与各专业知识领域已经吸收应用了各种不同的技术和工具,而这些技术和工具曾一度仅仅被视作属于辅助学科领域。例如,计算机信息系统和决策支持系统是目前常见的宏观管理工具。同样,许多像线性规划和网络分析这样的运算研究工具,现在广泛应用在许多知识和应用领域。因此,图2- 1反映了项目管理框架演变的唯一来源。 具体来说,建设项目管理包含一组目标,该目标可能通过实施一系列服从资源约束的运作来实现。在规模、成本、时间和质量的既定目标与人力、物力和财力资源限制之间存在着潜在冲突。这些冲突应该在项目开始时通过必要的权衡和建立新备选方案来解决。另外,施工项目管理的功能通常包括以下: 1. 项目目标和计划说明书中包括规模、预算安排、进度安排、设置性能需求和项目参与者的界定。 2. 根据规定的进度和规划,通过对劳动力、材料和设备的采购使资源的有效利用最大化。 3. 在项目全过程中,通过对计划、设计、估算、合同和施工的适当协调控制来实施项目各项运作。 4. 设立有效的沟通机制来解决不同参与方之间的冲突。 项目管理学会聚焦九个不同独特领域,这些领域需要项目经理所具有的知识和关注度: 1. 项目宏观管理,确保项目要素有效协调。 2. 项目范围管理,确保所需的所有工作(并且只有所需的工作)。 3. 项目时间管理,提供有效的项目进度。 4. 项目成本管理,确定所需资源和维持预算控制。 5. 项目质量管理,确保满足功能需求。 6 . 项目人力资源管理,有效地开发和聘用项目人员。 7 . 项目沟通管理,确保有效的内部和外部通信。 8. 项目风险管理,分析和规避潜在风险。 9. 项目采购管理,从外部获得必要资源。