内层与孔壁分离分析及整改报告(8D Report)

内层与孔壁分离分析及整改报告(8D Report)
内层与孔壁分离分析及整改报告(8D Report)

Customer To Customer PN Defective Qty 客户名收件人客户编号

缺陷数量From Innormal level Factory PN Date Code 供应商异常类别厂内编号周期Name 1. The 52 pcs defect PCBA at custmer side please scrap processing. We will bear the related

losses.

2. This board after reflow and wave soldering temperature, the aging test can test it out,

and through the analysis of NG ratio, so we think this board is individually undesirable

phenomenon, will not cause the bulk of the poor, please rest assured to use. If this

problem cause the terminal customer complaints and returns, recognized and confirmed by our

company, we will bear the losses.

3. We have not D/C8888 stock in factory. And the total hipment quantity is 7941PCS of

D/C8888.

D4. Root Cause (原因分析)

Happen reason:

1. The main reason causing the inner line and ring hole separation is the poor desmear.

(PTH process:Leavening →Desmear→Pre-neutralization →Neutralization →Entire hole →

Pickling →Microetching →Pickling →Prepreg →Activation →Prepreg →Acceleration →

Electroless plate )

2. According to analysis the adverse picture: Multilayer removing the residual epoxy resin

and glass fibers on cell wall by potassium permanganate. It's to form a reliable 3D

combination. But the board in the plating process miss desmear, so in the chemical copper

cylinder the cell walls is difficult to deposit a fine layer of copper, then the defect

occurs.

Out of reason:

1. After investigation this board PTH on March 12th, due to drilling burr cause to remade.

After remade OK, this 5 PNL boards turn to PTH process. But because the staff miss the

desmear, so the defect go out. (attach 1: Rework record)2. This board inner layer circuit with the hole wall was have a little connected, so our ET

machine tests "PASS".

D2.Describe The Problem(问题描述)

To accept your feedback as below:

PN:123456(0123)

D/C:8888

Defect Quantity:52PCS

Problem:Find inner line and ring hole separation

D3. Immediate Corrective Action (即时行动)

PL Supervisor

CS Supervisor

QA Manager

QA Supervisor

Position Phone

-Mail

Vice-President

inner line and ring 123D1. Problem Solving Team (团队成员)

8-D Corrective Action Report

123456Rework

record.doc

1. Multilayer have to carry out: Desmear+PTH Process. (attach 2)

production

process.doc

Problem Date 发生日期Reply Date

回复日期

Cause identification

Adverse picture:

Actor / Execution date

E-Mail

888852PCS

inner line and

ring hole

separation