GM 1963 - C2 Rev. June 2001-YYY

Supplier Name: input the name & location of the supplier.

供应商名称:输入供应商名称和地点

Part(s) Name: input the part name based on the part contract. When the sheet applies to multiple parts, specify name of all the parts.

零件名称:输入零件名称,零件名称和合同上的一致。当分析多个零件时,详细列出所有零件名称Part(s) Number: input the Customer's part number (not the supplier's internal part number). When the sheet applies to multiple parts, specify number of all the parts.

零件号:输入SGM 零件号(非供应商的内部零件号)。当同时分析多个零件时,详细列出所有零件名称

Contracted Capacity : input the CONTRACTED yearly and daily capacity.

合同能力:输入合同年产量和日产量

Instruction for System Level Capacity Estimate Worksheet

系统产能估计表填写指南

2. It should be noted that this spreadsheet provides an initial estimate only as it ignores all interactions between component

lines.请注意:仅当忽略零件生产线间相互作用时,才能用此表对产能进行初步研究

1. This sheet is to be used to estimate the capacity at the system level.

此表用来研究系统产能Description of each INPUT DATA field in this capacity estimation tool:下面是对如何填写此能力估计表的解释

Increased Contracted Capacity: input the increased CONTRACTED yearly and daily capacity.

增加的合同能力:输入增加的合同年产量和日产量

Production System: input each separate production line.

生产系统:输入生产线名称 Shifts per Week: input the number of working shifts per week for this supplier for this production line.

班/星期:输入生产线每周工作班次 Shifts per Day: input the number of working shifts per day for this supplier for this production line.

班/天:输入生产线每天工作班次 Minutes per shift: input the number of total minutes per shift for this supplier for this production line.

分钟/班:输入生产线每班的工作时间(分钟)

System Availability

系统作业安排 Scheduled Breaks, lunch, etc.: input in minutes the time spent PER DAY on account of breaks, lunches, meetings, any other scheduled breaks on this production line if production stops during these events.计划休息,午餐等时间:输入一个工作日中所有的计划性停线时间,包括休息时间、午餐时间、会议时间等其它计划性停线时间(分钟) Changeovers/Tool change: input in minutes the time spent PER DAY on account of tool changes, setups on this production line, if production stops during tool changes & setups .工装更换时间:如果在工装更换或作业准备时生产线停工,则输入一个工作日内所有的工装更换、作业准备时间(分钟)