文档库 最新最全的文档下载
当前位置:文档库 › TRANSCAD建模流程(总结)

TRANSCAD建模流程(总结)

TRANSCAD建模流程(总结)
TRANSCAD建模流程(总结)

TRANSCAD

◆1、CAD—>创建R12/LT2 DXF(*.dxf)文件,含路网层(Line层)、小区层

(area层)

◆2、导入至transcad,路网—>class:asia;zone:china。

小区—>去掉preserve blocks as multi-polygon areas,class:asia;zone:china。

◆3、在小区层里加载路网层,设置style(topology),endpoint层可见。

◆4、检查路网:tools—>map editing—>check line layer connectivity,阀值随便

填点……

◆5、在各层dataview里头add field—>路网:V/T/C(双向,6个,其中T设

成real number,其余integer);小区:G/A(integer)—>填充数值。

◆6、G—A balanced。

◆7、创建小区质心层(centroid):当前小区层,Tool—Export,export all features

to standard geographic files,ID—>ID。Options:include built-in data,export as centroind points。

◆8、加载质心层,add layer。

◆9、在endpoint层dataview add field—>index(integer)。

◆10、将质心层连接到路网。当前质心层:tools—>map editing—>connect。Setting

card:using all records to line layer“路网”,connect to nodes“all nodes”;fill card:fields to fill node field“index”,line field“none”,fill with IDs from 质心点layer。

◆11、路网连接后。新增路段的C设为无穷大,T设为很小。

◆12、创建路网。当前路网层:Network/paths—>creat。Inputs:creat links from

entire line layer,read length from length,optional fields all selected。Options:drop duplicate links。OK—>保存network。

◆13、计算最短路径矩阵。当前endpoint层,selection—>settings,add set。然

后在dataview中点选路网断点。

◆14、netwok/paths—>multiple paths。Setting:minimize“T”,from selection to

selection,store results as matrix file。

?network选项。Info card:勾选centroids;other settings:centroids are in selection set“selection”。

?OK—>运行获得最短路径矩阵。Shortest path-*.T。

◆15、重力模型标定(校准,要求有基年OD矩阵、shortest paths matrix)。

?ID转换,将基年矩阵的索引对应匹配shortest paths的索引—>indices—>add index:original row-column IDs from

dataview“endpoint”field“index”,name“new ID”use for both,row-column

IDs from field“ID”,selection“selection”。OK。

?Current indices rows“new ID”columns“new ID”,close。

◆16、Planning—>trip distribution—>gravity calibration。

Input matrix file“基年矩阵”layer“endpoint”using“selection”;use matrix 1,inverse power,impedance matrix:matrix file“shortext path”,include K-factor calibration。OK。获得result b。

◆17、创建摩擦因子。当前endpoint层,新建matrix“friction factor shell”,IDs are

in ID,rows from selection,columns from selection。

?(要求具备空矩阵friction factor shell、b值、shortest path-*.T。)

?Planning—>trip distribution—>synthetic friction factors,create friction factor matrix:matrix to fill matrix name“friction factor shell”;inverse power

selected;impedance matrix matrix file“shortest path”,运行。

◆18、应用重力模型(备b值、friction factor shell、shortest path matrix、K-factor

matrix“new matrix file”)

?以上三个matrix索引值需要与G/A的ID匹配,indices—>add index:original row-column IDs from dataview“endpoint”field“ID”,both,

row-column IDs from field“index”selection“selection”。

?重力分布:planning—>trip distribution—>gravity application。

Production-attraction data dataview“小区+balance”record“all feature”

General:name“new”,production“balanceG”attraction“balanceA”;friction

factor:factors come from inverse,impedance matrix matrix file“shortest

path T”,K-factors included,matrix file“new matrix file”matrix“matrix 1”。

?OK运行,获得output matrix。

◆19、交通分配。(备路网、基年矩阵)output matrix的索引值应与路网节点ID

匹配,indice……。

?Planning—>traffic assignment,method“user equilibrium”matrix file“ou tput matrix”matrix“new”;fields:time“T”capacity“C”else“none”。

?Network选项:info—>centroid勾选;other settings—>in selection set“selection”。

?Option选项:link based selected,table none,create themes!

?DONE!

出纳人员月度工作总结

出纳人员月度工作总结 亲爱的朋友,很高兴能在此相遇!欢迎您阅读文档出纳人员月度工作总结,这篇文档是由我们精心收集整理的新文档。相信您通过阅读这篇文档,通过我们大家思想的碰撞,一定会激发出您写作的动力。还有,阁下能将此文档加入收藏或者转发出去,是我们莫大的荣幸,更是我们继续前行的动力。 出纳人员必须具备良好的职业道德修养,要热爱本职工作。下面小编就和大家分享,来欣赏一下吧。 首先,在领导的帮助下我了解了出纳岗位的各种制度及其日常的工作流程。在同事们的指导和帮助下使我学到了很多工作中的知识,使我最快的熟悉了这份新的工作。在工作岗位没有高低之分,一定要好好工作,来体现人生价值。同时为了提高工作效率,平时自学电脑知识和ERP的出纳知识及操作,利用ERP使工作更加准确和快速。 其次作为公司出纳,我在收付、反映、监督四个方面尽到了应尽的职责,过去的几个月里在不断改善工作方式方法的同时,顺利完成如下工作: 一、日常工作: 1、严格执行现金管理和结算制度,定期向会计核对现金与帐目,发现金额不符,做到及时汇报,及时处理。

2、及时收回公司各项收入,开出收据,及时收回现金存入银行。 3、根据会计提供的依据,与银行相关部门联系,井然有序地完成了职工工资和其它应发放的经费发放工作。 4、坚持财务手续,严格审核(凭证上必须有经手人及相关领导的签字才能给予支付),对不符手续的凭证不付款。 二、其他工作 1、迎接公司上市财务审计,准备所需财务相关材料为迎接审计部门对我公司帐务情况的检查工作,做好前期自查自纠工作,对检查中可能出现的问题做好统计,并提交领导审阅。在工作中,我忠于职守,尽力而为,领导和同事们也给了我很大的帮助和鼓励。 2.完成领导交付的其他工作。 三.回顾检查自身存在的问题,我认为: 一、学习不够。当前,以信息技术为基础的会计软件的应用及理论基储专业知识、工作方法等不能完全适应新的工作。 二、对针对以上问题,今后的努力方向是: 加强理论学习,进一步提高工作效率。对业务的熟悉,必须通过相关专业知识的学习,虚心请教领导和同事增强分析问题、解决问题的能力,努力学习,争取在明年取得会计从业资格证书。

建筑设计报批流程图

建筑设计、报批流程 一、设计阶段的划分 规划阶段 方案设计 初步设计 施工图设计 (简单的民用建筑工程,经有关部门同意,并且合同中有不做初步设计的约定,可在方案设计审批后直接进入施工图设计)实际设计程序: 1.概念方案设计-征询(总平面设计、从概念到形象) 2.方案设计-审批(报建方案) 3.初步设计-审批 4.施工图设计-审批 5.施工监督配合-(服务的重要性) 二、各个设计阶段的设计内容 方案设计阶段: 1.绘制方案草图 2.结构选型,设备系统等设想方案 3.估算工程造价 4.组织方案审定或评选,写出定案结论。(报规划审批会研

究)《建设工程规划设计方案批复》 5.绘制报建方案。 初步设计阶段: 方案设计审查批准后进行,初步完成个专业配合,细化方案设计,编制初步设计文件,配合建设单位办理相关的报批手续。 初步设计的内容: 设计说明书、设计图纸、主要设备材料表(电气)和工程概算 施工图设计阶段: 取得初步设计审批文件之后,根据审批意见和审批文件,对初步设计进行必要的调整。 施工图设计的主要任务是满足施工要求,解决施工中的技术措施、用料及具体做法。 施工图设计的内容包括建筑、结构、给排水、电气、采暖通风等工种的设计图纸,建筑节能、结构及设备计算书。 总结一下设计全过程: 1.研究熟悉红线图,了解周围建筑情况和环境。 2.了解建设单位要求。 3.做方案图,报规划部门审批。 4.修改方案图,直到获得批准为止。 5.根据方案图的平面布置图,进行地质勘查。 6.做初步设计并报批。

7.做施工图。 8.交建设单位施工图审查单位审查。 9.施工配合。 各阶段侧重点: 1.方案重创新 2.初步设计重深度 3.施工图重校核 4.施工配合重服务 三、各个设计阶段的报批程序 “一书两证”制度 对我国城市规划实施管理的基本制度的通称。是《城乡规划 法》规定的,全国统一的。即城市规划行政主管部门核准发放 的。 建设项目选址意见书 建设用地规划许可证 建设工程规划许可证 一、《建设项目选址意见书》 1.是城市规划行政主管部门审核建设项目选址的法定凭证。 2.是土地部分提供土地,计划部分项目立项的依据。 3.设计任务书(可行性研究报告)报请批准时,必须附有城

年终工作总结流程5篇_个人年度总结范本

年終工作总结流程5篇_个人年度总结范本 a;工作中,我一定发扬吃苦耐劳精神和孜孜不倦的进取精神认真总结经验,克服不足,努力把工作做得更好,以对工作、对事业高度负责的态度,脚踏实地,尽职尽责地做好各项工作,不辜负领导和同志们对我的期望。下面给大家整理了关于年終总结流程表,方便大家学习。 年終总结流程表1 为了进一步提高自己的工作效率及工作能力,特制定以下工作计划: 一、对销售工作的认识: 1、不断学习行业知识、产品知识,为客户带来实用介绍内容,更好为客户服务,显得行业的专业性; 2、先友后单:与客户发展良好友谊,转换销售员角色,处处为客户着想,把客户当成自己朋友,达到思想和情感上的交融; 3、调整心态,进一步提高自己的工作激情与工作自信心;百倍认真努力地对待每一天工作、每一个潜在客户的挖掘; 4、去除任何客户拒绝的恐惧心理,对任何一个营销电话、任何一个潜在客户要自信专业性的进行交流; 二、对销售工作的提高: 1、制定工作日程表; 2、一天一小结、一周一大结、一月一总结;不断查找工作上的不足,及时纠正工作的失误,完善工作的整体效率;

3、不断挖掘潜在客户、展示产品、跟进客户;乐观积极向上自信的工作态度才能拥有很好的工作成果; 4、每天坚持打40个有效电话,挖掘潜在客户、每周至少拜访2位客户,促使潜在客户变成可持续客户: 5、拜访客户之前要对该客户做全面的了解,并准备一些必要的话题或活动去与客户进行更好的交融及相应的专业产品知识的应付方案; 6、对陕西省、山西省、江西省、河南省四大省市、县公路段单位负责人进行逐个电话销售,挖掘潜在客户,跟进并对相关重要客户进行预约拜访; 7、提高自己电话营销技巧,灵活专业地与客户进行电话交流; 8、通过电话销售过程中了解各省、市的设备仪器使用、采购情况及相关重要追踪人; 三、重要客户跟踪: 1、江西萍乡市公路管理局供机科林科长、养护科曾科长; 2、山西、陕西、江西、河南各省市级公路局养护科; 3、浙江省临安市公路局、淳安县公路段、昌化县公路段、建德县公路段的相关负责人; 4、山西省大同市北郊区公路段桥工程乐; 5、河南市政管理处的姚科长; 以上是我一年工作计划,我会严格按计划进行每一项工作。 年終总结流程表2

公司月总结会议流程

竭诚为您提供优质文档/双击可除公司月总结会议流程 篇一:关于公司周例会、月度总结例会流程通知 关于公司周例会及月度总结例会流程通知 为使每次会议更高效、有序,现将开会有关事项通知如下,各员工须遵照执行。 一、周例会 1、时间:每周一下午13:30-15:00(控制在1.5小时内) 2、参与人员:各部门负责人 3、主持:各参与人员轮流主持 4、会议流程 会前:①会议室清洁、整理,根据与会人员安排好座位等。②根据需要印发会议文件资料。 ③根据需要准备好会议记录工具(笔,记录本,录音笔等)。④根据需要准备好会议需用的设备(电脑,投影仪等)。 ⑤至少提前半个工作日发放会议通知,并把与会人员情况反馈给会议主持者。⑥与会人员需提前准备好会中所需汇报内容。 ⑦与会人员需提前安排好会议时间段内所需处理的其

它工作。⑧手机关机或调成静音状态。⑨会议记录与主持者,需提前一分钟到达会议室。⑩如有其它新的指示安排,提前告知与会人员。 会中:①会议记录者根据既定的记录格式做好会议记录。 ②会议主持者根据既定的会议议程控制整个会议过程。③与会人员积极发言,并注意自己的语气、语速、音量等。会议内容:与会人员汇报上次会议决策执行情况及本周具体工作计划、安排。会后:①发放会议记录,(根据需要发放给与 会人员及未与会人员)。会议记录应准确,会议中所形成的 决策要突出承担行动的责任人、具体完成时间及标准。 ②根据会议对执行进行监督、检查、反馈。 二、月例会 1、时间:每月三号下午13:30-15:30(控制在2小时内) 2、参与人员:公司全体员工 3、主持:阮总 4、会议流程会前:同上会中:同上 会议内容:①由店长汇报上月店铺整体计划指标完成情况,并由各部分责任人协同汇报在执行计划过程中发现的问题,未(如未完成)完成的原因,解决方案,具体行动计划等。②本月主要工作计划、指标(包括责任人、具体完成时间、达到标准等) 会后:同上 三、开会注意事项及纪律要求

优化服务流程工作总结

优化服务流程工作总结 篇一:关于流程优化项目总结以及组织规划工作的思考 关于流程优化项目总结以及组织规划工作的思考 个人目前工作总结 流程优化项目目前推进思路: 每季度调研收集区域流程优化建议,反馈总部各体系,跟进各体系流程诊断,牵头业务及信息责任人推进流程优化的落地 目前存在问题: 1- 缺乏客观的流程评估标准,流程是否优化目前仅由总部业务单方面判断,存在由于总部业务先入为主,或缺乏与大区间的沟通而导致很多大区意见被否定,目前整体大区意见采纳率仅有50%左右;另外也会因缺少流程评估的科学标准,导致很多低效流程难以被发现; 2- 目前信息的产品设计部门多是将自己定位为被动的需求受理角色,对于业务提出的流程调整方案的合理性缺乏主动判断的意识和能力。 3- 工作方法上较为低效,组织规划牵头调研,再反馈总部各体系,会存在部分总部体系敷衍塞责,不能主动地去对自身体系予以周期性的诊断,对于大区提出的建议有很多未予以沟通或解释;另外全体系对接,组织规划仅是充当调度者角色,很多流程难以深入,方案合理性也难以判断,沦

为计划管理工作。 工作改善建议: 1- 牵头组织流程评估标准建设,季度性要求各体系按此标准予以本体系流程的诊断,包括大区调研;组织规划监督各体系季度流程评估工作的开展,负责流程评估标准的维护; 2- 具体参与重点流程的制定与优化工作。对于各体系重点流程(重要的或者问题较严重的)予以直接关注。 关于部门工作的思考 部门定位:根据集团战略目标,设计集团组织、指导组织运行,监控组织运行过程,并及时修正组织问题。 部门工作开展思路: 1- 人员分工上。矩阵式分工。没人对接固定体系,同时每个人根据特长及专业负责不同职能块,具体包括:组织设计、流程管理、绩效评估、岗位管理等,部门工作以项目制开展,每个项目由不同模块的责任人牵头,各体系对接人配合参与。这样每个人都有专 攻的项目,又能够方便其他体系与我部门的对接,以及各类问题的汇总与协调,对于部门员工自身的发展也较好。 2- 工作开展方面。 1)干什么。干什么、怎么干和干的怎么样是我们组织的一个管理闭环,但其实是彼此两两关联的,组织规划部应

月度工作总结报告

月工作总结报告怎么写? 很多人都不会写月工作总结,其实很简单,照猫画虎就好了。大抵月总结报告都是"三段式",第一部分写这个月做了哪些工作,也就是主要工作内容;第二部分写工作中存在的问题;第三部分写工作中的收获。当然了,文章开头必须带个帽子,总结末位最后一段来一个总结就更加完整了。 下面是详细说明,斜体是例子,其他的要仔细阅读领会: 总结起头: 时间过的好快,转眼一个月过去了。我已经在xxx部门工作了一个月。在公司领导的培养、关心、鼓励和帮助、支持、配合下,我不断加强思想政治学习及公司规章制度学习,对工作精益求精,基本完成了自己岗位上的各项工作内容。下面我将自己在这段时间的工作内容、工作中存在的问题及收获、感想等做一个简要的总结。 上面一段是帽子,你发挥你的文采吧。后面要来点干货了,这一章节难在你忙了一个月,都不知道忙了些啥,怎么办,其实很好办,每天做每天记录下来,最简单的方法是记录到手机上,找个软件,比如idodo待办,目前是也我用过最好的待办软件,可以导出工作总结。边工作,边记录,养成很好的习惯,特别是帮助你提供工作效率和解决自己的拖延问题。 一、主要工作内容 1.参与xxxxx工作 9月5日,我和..... 展开整段的描述,比如怎么干的啊,做了哪些细致的动作,这些事情不会忘记的,因为前面我给你说过了,找个类似idodo待办那样的软件随手记录,你会发现很详细。后续的如法炮制。 2.x xxxxx工作 详细描述..... 3.................. 二、工作中存在的问题 1.对xxxx还缺乏全面了解 我并非学的气象专业和农学专业,因此在真正接触时,还是有些陌生,部分生产环节仅仅停留在对理论知识的认识上,在实际操作过程中便束手无策了。还有部分生产环境根本不知道如何操作。 2.缺乏主人翁意识 。。。。。。。 3.缺乏时刻记录的习惯 在领导安排某些工作或自己规划要做某些工作时,仅仅做到了耳朵听着,心里想着,没有意识在工作日志上记录下来,所以有些事情虽然当时能够记住需要去做,但过一段时间后便抛到九霄云外了。在以后的工作中要时刻提醒自己"好记性不如烂笔头,养成时刻记录的习惯。" 看到了没有,找出几个方面的问题,先标题,然后展开说就好了,如何展开?不会啊,其实很简单啦,把一碗豆腐说成一碗雪白雪白的,让人吃一口想三月的豆腐。呵呵~当然了,时候分析,记录真的很重要。 三、工作中获得的收获 1、团队协作重要性高于个人英雄主义 一把筷子折不断....... 上面是一个例子,你经过自己去思考,这个很重要,特别是对你的成长。这部分要认真思考,这样你才能有收获。 最后就是结尾,可以把全文做个概括,或展望,或规划,或畅想...,下面是个例子:总之,在这一个多月的工作时间里,工作中存在的问题和不足将促使我加倍努力去改正,工作

建筑方案设计基本流程

建筑方案设计基本流程 一、研究分析阶段 此阶段属于方案前期准备,但对于方案随后的推进、发展及最终的结果起着至关重要的作用。应认真仔细研读设计任务书。了解熟悉其功能、定位、,有条件的情况下,尽可能多地与业主交流、沟通,了解他们的想法。如是投标方案,也应利用答疑或其它侧面、间接的方式,尽量了解背景情况,避免设计发展的盲目性。同时,应充分利用公司的资源平台,进行全方位地收集相关技术资料及相似案例,并对其功能、布局和造型,进行学习、分析和研究,使设计从开始就在一个比较高的平台上发展。另一方面,也应对项目所处场地的地理环境、风土气候、人文传统等各种具象和抽象的特征做出相应的研究提炼,为以后的创作打下坚实基础,提供有力支撑,减少创作的随意性与主观性。 二、草案比较阶段 此阶段属于方案的构思草案阶段,在研究分析阶段的基础上,相关参予建筑师应充分展开各自的想象力,调动个人积累、发挥创作能力,尽可能多地提出各种构想和思路,积极、热烈地讨论,相互启发、交流、鼓励不同的想法,多角度的考量,并通过手绘草图、、工作模型等各种方式进行表达与多方比较。最终由主创建筑师综合各方面因素,明确创作方向与整体的格局,无特殊情况,不再做大的改动或颠覆性的调整,下一阶段的深入,基本应围绕这阶段确定的方向展开。 三、方案设计阶段 此阶段属于方案的正式创作阶段,应在前面两个阶段的基础上,结合规范及相关研究成果,准确定位,反复调整,将前阶段的各种构思转化成切实准确的功能布局与造型,并应与结构、水电、空调、生态、材料及构造技术等相关专业及供应商进行沟通、咨询与交流,全面综合的考虑方案的现实性与建造性,保证方案中技术支撑的深度与含量,增强理性分析的推进,切忌仅仅流于外观形式或限于个人的审美好恶。

写好工作总结的一般流程

写好工作总结的一般流程 工作总结是单位或个人对过去一个时期内的实践活动作出系统的回顾归纳、分析评价,从中得出规律性认识用以指导今后工作的事务性文书。那么,工作总结的格式是怎样的呢? (一)总结的种类 从性质、时间、形式等角度可划分出不同类型的总结,从内容分主要有综合总结和专 题总结两种。综合总结又称全面总结,它是对某一时期各项工作的全面回顾和检查,进而 总结经验与教训。专题总结是对某项工作或某方面问题进行专项的总结,尤以总结推广成 功经验为多见。总结也有各种别称,如自查性质的评估及汇报、回顾、小结等都具总结的 性质。 (二)工作总结怎么写? 1、标题 文件式标题一般由单位名称、时限、内容、文种名称构成。例:《××局19×× 年度拥军拥属工作总结》。 文章式标题以单行标题概括主要内容或基本观点,不出现总结字样,但对总结内容 有提示作用。例某高校的专题总结《我们是如何实行教学与科研相结合的》。 2020上半年工作总结的结尾 正文主体写好了,怎么收尾呢?什么都不说,直接落款走人是不是太过突然了,感觉 别扭?是的,最好的工作总结就是要有一个收尾,简单一点就好。比如我们可以这样写: 双行式标题即分别以文章式标题和文件式标题为正副标题,正标题揭示观点或概括 内容,副标题点明单位、时限、性质和总结种类。例:《知名教授上讲台教书育人放异彩——×× 大学德育工作总结》。 2、正文 一年的工作已经结束了,在即将迎来的一年中,我们会继续不断的努力的,这是一直 无法拒绝的问题,这是一直以来我们在年终时候的总结。每一年都有自己的进步,每一年 都会有自己的成长!相信大家在来年中一定会取得最圆满的成功的! 前言

transCAD简单教程

一、概况 TransCAD系统是由美国Caliper公司开发的交通GIS软件,现已推出用于Windows平台的3.5版。 二、技术特性 TransCAD软件把地理信息技术和交通规划技术较好地结合在一起,可以方便地对各类交通运输及相关数据进行存储、提取、分析和可视化。由于采用先进的Windows环境及一系列最新的开发方法,使得软件具有较好的风格:先进的菜单界面、强大的图形功能、方便的工具栏、良好的开放性、多文档、多用户操作等等。 TransCAD与其它Windows应用程序相仿,对容量没有硬性限制,最大限度地发挥硬件能力。运行环境为Windows 3.1及以上版本。TransCAD 3.5为32位应用程序。 三、功能特性 TransCAD主要包括5大功能: ?Windows下的、功能强大的地理信息系统; ?扩展数据模型,提供显示和处理交通数据的基本工具; ?汇集了极其丰富的交通分析过程; ?各式各样、数量巨大的交通、地理、人口统计数据; ?可以生成宏、嵌入、服务器应用及其他用户程序。 交通过程主要包括: ?网络和路径:生成、设置、路段方向、选定路段、转向工具箱、最短路、多路径、货郎担问题、网络分割、带宽设定等 ?线路系统:线路服务、站点服务、线路编辑等 ?规划:出行产生、吸引、平衡、快速反应模型、出行分布、交通分配等 ?公交:网络生成、设置、最短路、网络阻抗计算等 ?路线和逻辑分析:成本矩阵计算、货运路线计算与显示、弧最短路、指派问题、运输问题、货流配送、最小成本流、分区、聚类、设施定位等

统计:报表、校正、模型估计、模型应用、生成模型文件、邻接矩阵、空间校准等TRANSCAD教程1-- Project and TransCAD Overview ORGANIZATION LAB OBJECTIVES To provide hands-on experience with transport planning, analysis, and design and t o present Geographical Information Systems (GIS) fundamentals. TERM PROJECT Homework assignments and the course project will utilize TransCAD, a PC-based GIS for transportation which is installed in the Civil Engineering Computer Lab in E G3141. A formal lab will be held every week; typically on Fridays but occasionally on Mondays and Wednesdays (a discussion section often may be held as part of t he lab). Individual copies of TransCAD are not available, but additional formal lab ti me will be scheduled as needed. TransCAD manuals will be available in the Lab, and may be checked out from the TA or the main CEE office. The course project will be completed individually (or perhaps in teams of 2). There will be intermediate reports due during the quarter, and a comprehensive final report will be due durin g exam week (tentatively, June 16, 2004). Incorporated into the final report will be one or more network design solutions. It is highly recommended that each person/t eam keep all project material in a 3-ring binder to facilitate management of project

月度工作总结报告

月度工作总结报告 篇一:月工作总结报告怎么写 月工作总结报告怎么写? 很多人都不会写月工作总结,其实很简单,照猫画虎就好了。大抵月总结报告都是“三段式”,第一部分写这个月做了哪些工作,也就是主要工作内容;第二部分写工作中存在的问题;第三部分写工作中的收获。当然了,文章开头必须带个帽子,总结末位最后一段来一个总结就更加完整了。 下面是详细说明,斜体是例子,其他的要仔细阅读领会:总结起头: 时间过的好快,转眼一个月过去了。我已经在xxx部门工作了一个月。在公司领导的培养、关心、鼓励和帮助、支持、配合下,我不断加强思想政治学习及公司规章制度学习,对工作精益求精,基本完成了自己岗位上的各项工作内容。下面我将自己在这段时间的工作内容、工作中存在的问题及收获、感想等做一个简要的总结。 上面一段是帽子,你发挥你的文采吧。后面要来点干货了,这一章节难在你忙了一个月,都不知道忙了些啥,怎么办,其实很好办,每天做每天记录下来,最简单的方法是记录到手机上,找个软件,比如idodo待办,目前是也我用过最好的待办软件,可以导出工作总结。边工作,边记录,养成很好的习惯,特别是帮助你提供工作效率和解决自己的拖

延问题。一、主要工作内容 1.参与xxxxx工作 9月5日,我和….. 展开整段的描述,比如怎么干的啊,做了哪些细致的动作,这些事情不会忘记的,因为前面我给你说过了,找个类似idodo待办那样的软件随手记录,你会发现很详细。后续的如法炮制。 工作 详细描述….. 3……………… 二、工作中存在的问题 1.对xxxx还缺乏全面了解 我并非学的气象专业和农学专业,因此在真正接触时,还是有些陌生,部分生产环节仅仅停留在对理论知识的认识上,在实际操作过程中便束手无策了。还有部分生产环境根本不知道如何操作。 2.缺乏主人翁意识 。。。。。。。 3.缺乏时刻记录的习惯 在领导安排某些工作或自己规划要做某些工作时,仅仅做到了耳朵听着,心里想着,没有意识在工作日志上记录下来,所以有些事情虽然当时能够记住需要去做,但过一段时

会议记录工作总结

会议记录工作总结 第一篇、会议记录 会议记录员个人总结 会议纪要 会议时间 2021 年 8 月 15 日 会议地点盛泰搅拌站总经理办公室 参加单位及人员华良宗士伟王广林张录明刘滨申希 为规范公司业务管理,加强公司风险管控能力,降本增效,提升公司效益, 公司领导班子于 2021 年8月15 日在总经理办公室召开关于公司强化管理的研 讨会,现纪要如下 1、为实现公司各部门工作情况有效上传下达,总经理宗士伟要求公司管理 层以后每周一早上 8 点 30 整召开周例会,会上要详细汇报上周所存在问题的事 项,并制定当周的工作计划,要求事实求实 2、由各部门对本部门工作流程及核心制度进行梳理,并上会通过,对今后公司各部门的工作给予指示,要求严格执行工作流程,如有特殊情况,需提前汇报给公司总经理后根据指示作出变更。工作内容做好痕迹管理,各项检查需要留有记录。

3、生产部王广林汇报了部门流程问题,并制定了本周工作内容,即在保证生产的前提下,要求本部门对工作流程进行认真学习,对管辖区域卫生和安全进行检查落实,对铲车罐车及司机进行安全教育,同时对公司司机完善挂靠协议、签订安全协议书,配合公司中心任务收账。 4、张录明汇报财务部各项工作情况本周继续进行污水处理厂账款催缴,王立的账目催缴,建立健全财务泵房工作制度,要求本部门人员进行部门业务学习培训,存档并在下周例会检查。 5、实验室刘滨目前存在部分问题一是未接到生产任务单,主机就开始生产,生产上与主机直接沟通联系没有通过实验室,下一步要求生产主机人员必须有实验室人员签字后生产才可以生产;计划要求实验室人员按照国家标准组织学习,主要是技术、原材料参数及本岗位方面的知识内容,提升整体人员素质;对之前资料混乱的情况进行改革,将没有存档和备查记录的资料进行梳理。 6、业务部申希根据领导要求业务部改为市场部,要有固定市场开发人员 及临时人员,加强市场开发和账目催缴。对栗河物流园、茶尔路口张武、白 桐 3 标段、光彩大世界、伏牛路何富强加强要账力度。 总经理对本次会议进行总结

年终工作总结会流程(精)

阔达装饰2011年度工作总结大会流程人员安排: 总控:乔朋杰、聂雪;前台签到:王彦彦、聂雪;台上主持人:孙静文、金堃;礼仪:董杜娟、周其秀、王彦彦;首先,我宣读一下会议纪律 1、参会人员到场后,必须到前台签到处签到,签到不得由他人代签; 2、参会人员不得缺席或擅自安排他人代会及请假; 3、会议期间不得迟到、早退及会客,违者将给20元罚款; 4、参会人员因特殊情况在会议中途请假的,必须经会议总控同意后方可离开,否则按早 退处理; 5、参会人员要自觉遵守会场秩序,会议进行时,手机调振动或关机,不得在会场内抽烟、 来回走动、接打电话、交头接耳、大声喧哗、阅读与会议主题无关的报刊杂志、打瞌睡或长 时间滞留会场外等,违者给予20元罚款; 6、无故缺勤或违反会议其他纪律者将给予100元罚款. 请在场的各位都能自觉遵守会议纪律,保证大会顺利进行,谢谢大家的支持!有请主持人上台 女:尊敬的各位领导,亲爱的同事们,大家合:上午好! 男:中华大地春意浓 女:六合风调万户丰 男:在这硕果累累的一年里,我们北京阔达装饰济南唯一授权单位—济南尚层装饰设计有限公司,携着辉煌、载着收获,留下了一行行坚实的足迹,如今又迎来了阔达装饰2011年度工作总结暨表彰大会在此召开。女:新春佳节年意浓浓,远朋近邻四海升平,首先非常荣幸的向大家介绍参加本次会议 的领导及嘉宾: 阔达装饰公司总经理:王总男:阔达装饰股东:边总 阔达装饰股东:孙总女:阔达装饰总监:张总 男:阔达装饰设计部旗舰风尚殿、设计部大唐尊享殿、市场部、后勤联合部门、以及下属各位项目经理 让我们对各位领导和全体员工的到来表示热烈的欢迎。男:下面我宣布:北京阔达装饰济南唯一授权单位—济南尚层装饰设计有限公司2011年工作总结2012年计划及表彰大会现在开始。大会进行第一项 男:现在大会进行第一项,请全体起立,宣读我们2011年工作精神男:卓越是一种梦想 宣读完毕

学生会个人月工作总结900字(完美版)

学生会个人月工作总结900字 新的学期里,学院又迎来了新的一批莘莘学子。在9月2日当天,作为团委的工作人员之一,我投入到了热闹而且富有挑战性的迎新队伍当中去了。在工作的一个上午,虽不长,但却留给我深刻的印象。 工作内容是提前几个星期就已经布置好的了,但是临时有了变动,我当天的工作主要是在教四的咨询点工作,负责把新生带回大本营和解决交学费、转移户口的问题。总的来讲,我当天的工作中没有出现很大的失误。但是在遇到接待需要转户口的新生时,我没能很清楚地带领新生去走流程,我只好边询问那边的工作人员边带领,这是我需要检讨的。但经历过一次之后,我立刻给组长反馈信息和一些转移户口的注意事项、流程,因此在后来的开展工作中我们组的人员比较顺利地完成了任务。 但是在我们工作的时候,我们发现有很多新生在大本营没有领取校园卡,来到教四转户口时才发现是必须校园卡的,以至于要花费时间和精力跑回去大本营领取校园卡,甚至给新生及家长带来不好的印象。这一点是我们时常发现的,经过探讨,这应该是与大本营的工作人员没有做到位有联系,他们误解了“已经注册成功”的意思,以为校园卡要到教四领取。我想,这是很多带领新生走流程的班级人员都会误解的,因为很多班级人员都不是十分清楚自己的任务及其整个注册流程。所以,在往后的动员程序操作过程中,建议我们印发详细的资料并确保到达每一位班级工作人员手中。例如让班级负责人群发邮

件,讲解详细的工作内容而并不是简单的概括字眼。 值得肯定的是,我们的迎新任务给大多数新生时留下了较好的印象的。在接待的过程中,我就能感受到家长们的热情,特别是有关孩子们的往后学习、生活的,都要问个水落石出。我看见我们的工作班级和相关人员都很积极地回答他们的问题,甚至帮忙提行李之类的,这就体现着我们的精神“团结创新,服务同学”。在当天的工作中,虽然有问题存在,但我们能随即应变,及时解决问题,这的确减少了我们耽误的时间。 工作完毕后,我们的迎新工作算是告一段落了,但是在接下来的宿舍走访工作中,我们还是要秉着“服务同学”的心态去宣传我们的学院,我们的团委大家庭,力求给师弟师妹们留下一个更好的印象。

Transcad操作步骤

Transcad操作步骤 1.在CAD里面画好,快速路、主干道、次干道、支路和交通小区分布图(貌似在Transcad 不能从CAD导入Transcad分区层);导入后要给线层(Type、Capacity、Speed、Time、AB_Flow、BA_Flow(目标年)、country(实际观测的道路流量))、分区层(P_Fur、A_Fur、ZoneID)设置属性。在CAD里面画的道路图(如果在百度里面截的图画的,乘以14.28)才能得到实际比例。 2.Transcad默认的小区ID与你自己实际划分的编号不一样,可以用先将小区层增加一个编 号字段,输出(既Export)小区文件为标准地理文件既:standard geographic file,此时ID选择你自己新加的那个编号,在保存后打开,就OK 3.小区合并为大区:我觉得有2个功能:1划分交通大区;2把太过于详细的重新划分小 区。步骤:1在小区中增加一个属性daqu 2需要合并的小区在这字段填写所在的大区区号(如果是功能1:就要把这些小区都包括;如果是功能2:不重新画的小区编号保留原来那个),3操作:tool/geographic analysis/merge by value,在弹出的对话框里:merge:ALL Records和Based on :daqu 点击OK,保存再打开就行了。 4.检查路网的连通性,再为路段输入属性数据Type、Capacity、Speed、Time、AB_Flow、 BA_Flow.可以在这里设置单项车流。 5.在按四阶段法,按照每步步骤做,首先做出行生成预测:交通生产量主要用原单位法; 交通吸引量用吸引率法(根据不同的土地性质产生的不同的吸引率),或者用回归分析法(需要基础年和目标年的GDP、社会消费品零售总额、人口等经济社会指标,但是这个需要基础年的出行产生吸引量) 6.原单位法:在你划分小区后,根据每个小区有多少人在相乘本市人均出行次数,即得每 个小区的出行产生量。吸引率法:根据小区内不同性质的土地面积相乘以对应的吸引率即得。回归分析法:假设出行吸引量与GDP、社会消费品零售总额、人口等经济社会指标有关成非线性相关,从而预测目标年的出行产生吸引量(Transcad有相应计算工具),首先要在Transcad生成一个Bin数据表格,给数据表输入基础年和目标年的GDP、社会消费品零售总额、人口等属性,在Transcad用回归分析法求出P_Fur、A_Fur,先平衡下,再把它放在分区层里面的P_Fur、A_Fur的属性里面。 7.若用原单位法、吸引率法在上步求得的是单位是人/天把这个转换成PCU/天(人数除以 1.2=PCU/天)PCU/天*19.63%=各个区高峰小时交通量,根据交通方式的划分得出各种交 通方式的出行量。回归分析法既有出行现状就看它本身的单位。 8.重力分布模型:流程一:求阻抗矩阵R ij(Impedance Matrix) 交通阻抗可表示为:出行距离的长短、行程时间的快慢及费用的大小等。为更真实地反映交通阻抗,本次规划交通阻抗采用相对行程时间(也可以用距离表示)表示。小区之间的阻抗—相对行程时间越小表示小区之间阻抗越小,越大表示小区之间阻抗越大,因此以相对行程时间为路权值求各小区之间的最短路径(Shortest Path)其值即为小区之间的阻抗R ij (1)数据准备 ①创建路网 步骤:(已建路线层和分区层)

月度总结会流程

电销中心*月总结会流程 一、会议入场时间:*月*日下午3:50 二、会议时间:*月*日下午4:00-5:40 三、会议地点:** 四、会务组成员: 主持人:小米 音乐控制,视频及PPT控制:小玲 奖金台颁发:小李小梦 会场助理【主要协助主持人】:小梦 拍照:小明 投影、音响技术支持:网管 照片上传本地服务器 五、参会人员:全体员工 六、背景音乐 开场前准备:我相信-华语群星 主持人上场音乐 热场环节:周家如-节奏(伴奏版) 晋升音乐:Nicole Cross-someting Just Like This 颁奖音乐:超越极限 冠军致辞:Hall of fame <伴奏> 优秀之星:艾薇儿-Fly 提成过万:梦回还 提名环节:汪峰-怒放的生命

七、会议流程: 1.开场互动游戏,游戏名字:抢可乐。游戏规则:游戏5人一组,一轮分2组进行游戏,分别由各小组派一名代表上台参与游戏。两组分别站在可乐的左右两边。游戏开始后,大家按照主持人的口令做出相应的动作,比如主持人说“摸耳朵”,所有人要迅速反应摸耳朵,说“摸屁股”,所有人要迅速反应摸屁股。当主持人说“抢”大家迅速去抢地面上对应自己的可乐,抢到的同事即可获得手中可乐。 上台顺序:第一轮:左边:1组、2组、3组、5组、6组。 右边:9组、10组、11组、12组、13组。 第二轮:左边:7组、8组、21组、22组、20组。 右边:15组、16组、17组、18组、19组。 2.总结环节:代表讲话→总裁(总结10月份工作) 3.晋级仪式: 3-1颁布本月领导层晋级名单,晋级人员从红毯上挥手上台! 3-2颁布本月个人晋级名单,晋级人员从红毯上挥手上台! 3-3.宣誓环节:宣誓词看附件!

部门年终总结会议流程

部门年终总结会议流程 201x年冬季姗姗到来,年底将至,各公司企业开始为年会筹备策划了!无论这一年的成果如何总要有个总结!一是对今年有个收尾,二是对来年做个计划,大家一起庆祝一番,交流下感情,活跃气氛促进公司发展和团结!事业蒸蒸日上! 沈阳超凡会展公司从事多年会议活动策划执行工作,有着丰富的经验和自己独有的一套执行计划。公司秉承客户至上的原则,以节约时间和商业成本为基准,精心做好每一次活动! 新年即将来临之时,我公司已经做好全面的准备!迎接各公司的年会策划活动!公司不单在年会流程上精心策划!还在其他如场地选择,文艺表演等方面为客户准备了参考标准等。 从接到委托开始,会与客户进行面谈,了解客户想法,从客户的角度出发,做出预案的同时给客户提出参考意见,以便方案顺利执行! 签署合同或相关法律协议后,开始按预案进行方案设计! 递交设计方案,同客户对接!确定流程 活动现场搭建,搭建过程会有专业人员现场作业和指挥! 客户验收,到现场进行对设置进行查看! 一切准备就绪,开始按方案执行! 待会议结束后,我公司工作人员会到现场进行撤场拆卸! 所有的环节都做好了部署,都有我公司专业人员实地指导、操作。能够更好的完成任务,完美达到客户的要求! 我们将呈现在客户面的是一场完美的年会! 尊敬的公司率领及同事们: 您们好! 在这新的一年里,我谨代表华南批示部的全体资料员向在座的列位致以真挚的谢意,同时给巨匠拜个晚年,祝愿列位率领同事们春节兴奋,20**事事如意;祝公司事业蒸蒸日上,更上一层楼。 我是华南批示部××项目部 的资料员兼出纳,我叫××,想必巨匠对我既熟悉又目生,熟悉的是名字,目生的是人。我是一个进公司刚满一年的员工,在曩昔的一年里深得率领的信赖和厚爱,有幸被评为优异员工,并在年关作为资料代表在此讲话,向率领们进行工作总结陈述

月度工作总结简短

月度工作总结简短 每年有年终工作总结,同样,每月也需要书写月度工作总结。下面是小编整理的月度简短工作总结范文,希望对您有所帮助! 月度工作总结范文简短一、以踏实的工作态度,适应办公室工作特点 办公室是公司运转的一个重要枢纽部门,对公司内外的许多工作进行协调、沟通,做到上情下达,这就决定了办公室工作繁杂的特点。每天除了本职工作外,还经常有计划之外的事情需要临时处理,而且通常比较紧急,让我不得不放心手头的工作先去解决,因此这些临时性的事务占用了很多工作时间,经常是忙忙碌碌的一天下来,原本计划要完成的却没有做。但手头的工作也不能耽误,今天欠了帐,明天还会有其他工作要去处理,因此,我经常利用休息时间来进行“补课”,把一些文字工作带回家去写。 办公室人手少,工作量大,特别是公司会务工作较多,这就需要部门员工团结协作。在这一月里,遇到各类活动和会议,我都积极配合做好会务工作,与部门同事心往一处想,劲往一处使,不会计较干得多,干得少,只希望把活动圆满完成。 二、尽心尽责,做好本职工作 一个月来,我主要完成了一下工作:

1、文书工作严要求 1)公文轮阅归档及时。文件的流转、阅办严格按照公司规章制度及ISO标准化流程要求,保证各类文件拟办、传阅的时效性,并及时将上级文件精神传达至各基层机构,确保政令畅通。待文件阅办完毕后,负责文件的归档、保管以及查阅。 2)下发公文无差错。做好分公司的发文工作,负责文件的套打、修改、附件扫描、红文的分发、寄送,电子邮件的发送,同时协助各部门发文的核稿。公司发文量较大,有时一天有多个文件要下发,我都是仔细去逐一核对原稿,以确保发文质量,共下发红文份。同时负责办公室发文的拟稿,以及各类活动会议通知的拟写。 3)编写办公会议材料,整理会议记录。每个月末对各部门月度计划的执行情况进行核对,催收各部门月度小结、计划,并拟写当月工作回顾,整理办公会议材料汇编成册,供总经理室参考,办公会议结束后,及时整理会议记录,待总经理修改后,送至各部门轮阅。 2、督办工作强力度 督办是确保公司政令畅通的有效手段,今年以来,作为督办小组的主要执行人员,在修订完善督办工作规程,并以红文的形式将督办工作制度化后,通过口头、书面等多种形式加大督办工作力度。抓好公司领导交办和批办的事项、基

工作总结说流程

工作总结说流程 篇一:工作总结说流程 篇一:怎样做好工作总结工作布置 怎样做好工作请示汇报、工作总结、工作布置和工作交接 1、汇报工作说结果 不要告诉老板工作过程多艰辛,你多么不容易!老板不傻,否则做不到今天。举重若轻的人老板最喜欢,一定要把结果给老板,结果思维是第一思维。 2、请示工作说方案不要让老板做问答题,而是要让老板做选择题。请示工作至少保证给老板两个方案,并表达自己的看法。 3、总结工作说流程 做工作总结要描述流程,不只是先后顺序逻辑清楚,还要找出流程中的关键点、失误点、反思点。 4、布置工作说标准工作有布置就有考核,考核就要建立工作标准,否则下属不知道如何做,做到什么程度才是最合适的。标准既确立了规范,又划定了工作的边界。 5、关心下级问过程 关心下属要注意聆听他们的问题,让其阐述越详细做好。关心下级就是关心细节,明确让下级感动的点和面。 6、交接工作讲道德

把工作中形成的经验教训毫不保留的交接给继任者,把完成的与未竟的工作分类逐一交接,不要设置障碍,使其迅速进入工作角色。7、回忆工作说感受 交流多说自己工作中的感悟,哪些是学到的,哪些是悟到的,哪些是反思的,哪些是努力的。篇二:工作汇报流程 公司工作计划管理制度 一、工作汇报的目的 1、为规范公司的工作分配及汇报,加强公司内部工作进程管理,提高部门的工作效率; 2、及时了解各部门的工作情况,掌控各项工作进展情况,及时解决工作中出现的各种问题,更好的完成各项工作。 二、工作汇报形式 1、周工作计划及执行总结 (1)个人周工作计划及执行总结:由各部门员工个人填写汇报到部门负责处审核留底; (2)部门周工作计划及执行总结:由部门主管填写汇报到中心负责处审核和留底; (3)中心周工作计划及执行总结:由中心负责人填写汇报到公司计划执行负责人处留底; 2、月工作计划及总结

建筑方案设计流程

一、前期准备 1、需甲方提供的资料 1)用地红线图(注:应有明确的坐标) 2)原始地形图(最好甲方已将红线落于地形图上) 3)相应区域城市规划图(明确周围建筑状况、性质、层数或高度、定位;周围市政道路定位、宽度、节点的坐标、标高及道路的坡度;市政绿化带宽度;是否有高压线等需要避让的东西。) 4)规划要点(明确用地性质、容积率、覆盖率、绿化率、规划规模、高度限制、机动车非机动车规模、建筑退红线要求等) 5)各地政府的相关规定、城市规划管理条理等(重点关注有关键建筑间距、日照分析、高中低层及点式板式建筑退让道路红线、用地红线的具体要求、各地针对不同情况在总图上对于消防的不同要求) 6)甲方提供的设计任务书(涉及到具体的设计内容、设计方向、出图深度、时间控制等) 7)用地批文(此文关系到此项目是否可以立项,亦即说明一个项目是否真实可实施的项目,在设计文件档案管理上这是不可缺少的文件) 2、相应准备: 1)明确相关设计的一些规范及防火规范;在总图、单体设计上有何约束; 2)根据设计任务书明确建筑的定位、把握大的设计方向; 3)将建筑用地根据不同情况分类,明确优势劣势; 4)根据规划要点及设计任务书测算建筑规模,可能形成几种模式,优化方案方向。 5)根据甲方的进度要求及工作量拟定工作时间表,时间表上应留出必要的审图时间,甲方配合的时间则较为机动。 6)收集整理相应的参考资料。 注:其中第3、4步的工作对一个项目把握其设计质量而言尤为重要,关系其是否能够完成最合理、最优化的设计。 二、设计阶段进行中应注意的几点

1、总图规划: 1)市政规划上的相关硬性规定要明确并绝对服从; 2)总图中有关消防的规范、消防道路的分布、消防车出入口的设置、消防道路的宽度、消防控制中心的位置、高层建筑消防疏散口的位置; 3)建筑出入口的位置、机动车道、人行道的分布、不同人群的流线关系、机动车车流、非机动车流与人流的关系、搬家车道的设计、无障碍设计、机动车停车场车(库)的设计及其出入口的位置; 4)小区的管理、居住小区设计物业管理、社区活动场地、儿童活动场地、社区医疗保健、公厕等; 5)环保设计:垃圾收集、处理、运送;废水的排放等; 6)绿化设计:把握绿地率,注意绿化设计与消防车道、消防普救面、地下室等之间的关系,遵守互相避让、互为对方提供条件的原则;水体的设计注意标高与地下室之间的层高关系; 7)场地的竖向设计:控制场地的坡度与建筑各个出入口连接、道路的坡度;原始地形为坡地的要优化场地,尽量合理的运用高差减少土方量;沿海(江河)的城市的项目要注意当地的防洪标准; 8)建筑间距的控制; 9)建筑形态的把握、建筑类型的分布合理性; 10)小区小的气候条件的利用、改造等(日照、夏季主导风向等) 11)建筑规模总体把握,天际线的合理设计; 2、单体设计 1)相关设计规范、消防规范、尤其是相关的一些强制性条文; 2)建筑不同类型比例的把握; 3)建筑不同类型的定位、特点; 4)建筑立面风格的把握; 5)根据总图明确每栋建筑的绝对标高,协调各建筑之间在总图中的关系; 6)每栋建筑交通的合理组织,核心筒的摆放;

相关文档