Technical Supplier Assessment — Decorative PVD Date :

Auditor:

Audited Company :

1

MATERIAL HANDLING AND STORAGE 1.1

Targets must be stored according to the supplier recommended conditions and properly identified.

Remark:1.2Targets must be used within its shelf life.Remark:

1.3

Partially used targets must be stored in a proper container and identified.

Remark:1.4Practice FIFO for all targets with proper material tracking.Remark:

1.5Targets incoming quality ensurance/validation.

Remark:1.6Procedure for controlling rejected or expired targets. Isolated area should be assigned for temporary storage of these targets.

Remark:1.7Environmental control in the target storage area (with temp and humidity control and/or

monitoring).

Remark:

1.8General housekeeping in storage area: cleanliness, organization, etc.

Remark:

1.9

Substrate materials or raw parts (stainless steel, etc...) handling: proper storage to avoid surface contamination and scratches. Lint free glove should be used to handle raw parts.Remark:

1.10Incoming raw parts rejects and customer return parts handling: procedure and secured

storage.

Remark:

Total Score (max of 50)

02PVD PROCESS

2.1PVD room environment: general cleanliness.

Remark:

2.2PVD room environment: humidity and temperature control and/or monitoring. Frequency

and updated records.

Remark:

2.3Loading/unloading of parts: parts to be handled with lint free gloves. Scratches must be

avoided.

Mobile Devices Supply Chain

Materials & Failure Analysis Laboratory

Remark:

2.4

Holding fixtures: scratches must be avoided on substrates

Remark:

2.5Raw part cleaning: any process to clean the raw part surface

Remark:

2.6Raw part cleaning: cleaning process setup sheet and in-process check list availability

Remark:

2.7Control and track the interval time between after raw part cleaning (if exists) and before

PVD"

Remark:

2.8Raw part configuration/distribution on the holding jig in PVD process:

Remark:

2.9

PVD target cleaning prior to PVD process: remove surface contamination/degradation

Remark:

2.10Capability of using multiple type of targets in one batch process. If yes, definition of target

switching

Remark:

2.11Reactive gas control: availability of gas injection profile and the control of gas condition

Remark:

2.12PVD chamber interior surface shield cleaning: how to monitor the cleanliness and how often

to clean

Remark:

2.13

Availability of authorized PVD process master setup sheet used to start every operation.

(temp, voltage, current, vacuum level, parts and PVD target configuration, gas control, etc.)

Remark:

2.14PVD process parameters record for each batch: key parameters such as target, gas,

voltage, temp, etc....

Remark:

2.15Routine maintenance of PVD line (chamber, fixture, vacuum pump system, etc.): procedure

availability

Remark:

2.16Routine maintenance of PVD line (chamber, fixture, vacuum pump system, etc.): updated

records availability

Remark:

2.17SOP and WI availability to operators: operators should strictly follow working instruction.

Remark:

2.18In process rejects handling

Remark:

Total Score (max of 90)0 3PERFORMANCE TESTING

3.1Salt spray testing availability and testing procedure

Remark:

3.2UV radiation chamber for conducting UV weatherability: equiment avaialbility and testing

procedure

Remark:

3.3Humidity chamber availability for conducting the environmental exposure test

Remark:

3.4Purse Test availability (equipment and accessories) and correlation with Motorola

Remark:

3.5Scratch resistance testing availability (i.e. steel wool test or other similar tests) and testing

procedure

Remark:

3.6Temperature cycling testing availability and testing procedure

Remark:

3.7Calibration or Preventive Maintainaice plans for testing equipment

Remark:

3.8Calibration or Preventive Maintainaice records for testing equipment

Remark:

3.9General practice on protecting Motorola proprietary information

Remark:

3.10Availability of Master Sheet indicating the conformance of performance (on physical

property and cosmetic appearance) per specifications on Motorola Engineering Drawing

for each part before mass production

Remark:

Total Score (max of 50)0 4PART INSPECTION

4.1Lighting conditions and cleanliness in the inspection area

Remark:

4.2Check for defects on incoming raw parts

Remark:

4.3Inspector training on Motorola A97 spec: procedure and training records

Remark:

4.4Availability of Golden/Limit storyboards for visual checking cosmetic appearance

Remark:

4.5Inspection procedure for color

Remark:

4.6Light booth availability for color inspection

Remark:

4.7Availability of storyboards with defined reject limits on cosmetic apperance at inspection

station for operator reference.

Remark:

4.8Collection on rejects per defects category

Remark:

4.9Method to ensure inspection rejects not escaping into Good/Go/Pass parts

Remark:

4.10Tracking method for each batch of PVD products from the beginning (such as parts

cleaning) to the end (such as before packing) of the whole production

Remark:

Total Score (max of 50)

5GENERAL

5.1Any Quality Certification such as ISO:

Remark:

Total Score (max of 5)

Overall Score (max of 245 )0