文档库 最新最全的文档下载
当前位置:文档库 › DfX Glossary of Terms

DfX Glossary of Terms

DfX Glossary of Terms
DfX Glossary of Terms

DfX Glossary of Terms

This Glossary of Terms is courtesy of Alfred Crouch from his book:

Design for Test for Digital IC's and Embedded Core Systems

A-B C-D E-F G-H I-J K-L M-N O-P Q-R S-T U-V W-Z

A-B

AC Fault Models:

mathematical descriptions of faulty behavior designed to assess timing compliance of a circuit -- the most common examples are the gate-level transition and the path delay fault models.

AC Testing:

the application of vectors to a circuit with the intent to verify the timing compliance -- for example, testing using the transition or path delay fault models to determine the delay or cycle-time involved in conducting register-to-register, input-to-register, and register-to-output transfers.

ATPG (Automatic Test Pattern Generation):

the use of a software tool to generate test vectors algorithmically.

At-Speed Scan:

a scan test architecture that allows the scan chains to be operated (shift and sample) at the rated clock frequency for purposes of verifying timing criteria (frequency, specifications, AC faults), and to reduce the tester application time.

Automatic Test Equipment (ATE):

a class of equipment used to apply vectors to a completed chip design -- also known as a tester, test platform, IC ATE. A tester may be used to test final packaged product, or it may be used in conjunction with other support equipment such as wafer probers to conduct test on raw die.

Benchmarking:

the comparison of items against a “best in class” standard, or against each other with a “selection criteria” established. This term, in the context of this text, is applied in two ways: it is applied to the process of comparing various ATPG tools, with an established selection criteria, to choose the tool that best meets the needs of the design or test organization; and it is applied to the process of comparing embedded cores, with an established selection criteria, to choose the core that best meets the needs of the design organization.

BIST (Built-in Self-Test):

a design unit generally with on-chip resources to apply stimulus and evaluate responses so that the design unit can be tested to some level from within the chip (for example, memory BIST allows a memory test unit to be placed on-chip, for the purpose of testing the on-chip embedded memory arrays, with minimum direct interaction from an external tester). BIST is commonly described in two main categories, Logic BIST and Memory BIST.

BIST'ed Memory:

a memory array with a BIST methodology closely associated -- more specifically, one with the BIST logic in close association so the physical unit may be treated as a single design entity, with associated signals such as Data, Address, Read-Write, Output-Enable, BIST-Invoke, BIST-Done, and BIST-Fail (as opposed to, for example, a single centralized BIST controller that has the ability to test multiple memory arrays).

BIST Test Wrapper:

a design unit or level of hierarchy, that is viewed as the external interface of a non-mergeable or “test-in-isolation” core, that uses embedded built-in self-test techniques, such as LFSR's for pattern generation (PRPG) and/or response evaluation (Signature Analysis), as the method to apply and/or evaluate isolated testing.

Bridging Fault Model:

a fault model represented by shorting together two elements -- these elements can be transistor components and connections, gate components and connections, or

wire interconnect signals. The case of an element being constantly shorted to power (VDD) or ground (VSS) is the stuck-at fault model.

C - D

Circuit Learning:

a process conducted by the ATPG tool to identify complex circuits, or structures that are difficult to operate or make tracing decisions through, and to establish the way to deal with these circuits prior to beginning algorithmic test generation. Circuit learning reduces the time involved with vector generation, or enhances the ability of the ATPG engine to successfully create a vector.

Clock Domain:

all sequential elements connected to the same physical clock distribution network -- note that a chip design may have multiple domains and some domains may be defined to be operated at the same frequency, however, if the physical clock nets are distributed separately with different skew and delay management, then they are considered different clock domains.

Combinational:

a type of circuit or circuit description that is comprised only of combinational gates -- there is no state holding logic, sequential logic, or memory logic in the circuit description. In the context of this text, circuits rendered effectively combinational simplify the ATPG process.

Concurrent Test Engineering:

the methodology whereby the test issues, concerns, goals, and budgets of a chip design are dealt with concurrently to the functional design. The opposing methodology has been called “over the wall” in that the design is accomplished and then it is “tossed over the wall” to a test group to then eke out the quality measurement on the completed and frozen design.

Controllability:

the ability to place nets, nodes, gates, or sequential elements to a known logic state. This has two main contexts in this text, the ability for an ATPG tool to place known

values wherever necessary in the design description during the vector generation activity; and the ability for a tester to place known values at the edge of a chip, or within a chip by using a test architecture such as scan.

Core: see Embedded Core

Cost-of-Test:

the measurement of the expense generated during a chip design, or of the cost added to a final chip product, due to the DFT or test process. In the context of this text, the cost-of-test is described as the additional time added to the design cycle due to DFT and test activities (TTM impact); the additional time added to the product cycle due to vector generation for qualification time -- time-to-volume (TTV impact); the direct impact to the silicon size due to test logic (Silicon Cost); the direct impact to the number of package pins and to power rating of a chip package due to test logic (Packaging Cost); and the direct costs involved with the testing process such as the cost of the tester, the throughput time on a test floor, the cost and complexity of the test program, etc. (Test Cost). These costs can be separated into recurring and non-recurring costs, where recurring costs are incurred each time a final chip is produced.

Critical Path:

those paths that establish the product's frequency, or pin specifications, within some defined timing guardband, and those paths that would establish the product's frequency in the presence of delay faults that would not be caught by some other test such as stuck-at or transition delay based testing.

Current-Based Fault Model:

a fault model that may be represented by any of the structural, bridging, or delay fault models, that is applied with the intent of measuring the current drawn by the circuit as the observe operation, rather than the propagation of voltage values to observe points.

DC Fault Models:

mathematical descriptions of faulty behavior designed to assess structural compliance of a circuit independent of any timing requirements -- the most common example is the gate-level stuck-at fault model.

Defects:

the “real world” physical anomalies that can occur in silicon or in packaging. Defects may result in the final chip product not being in compliance with it's operation parameters (logic functions, frequency performance, power consumption), or may result in a limited product lifetime (reliability). Defects may exist, but may not be destructive -- not all defects map to fault models and ultimately chip failure modes.

Delay-Based Fault Model:

mathematical representations of faulty behavior based on the concept of timing. In the context of this text, the launching of a voltage-based logic transition (0->1, 1-

>0) into a circuit, and the observance of the circuits logic response to that transition at a later time interval. The most common examples of delay-based fault models are the gate-level transition and path delay models.

Delay Fault Models: see Path Delay and Transition Delay entries.

Delay Path Sensitization:

the establishing of a propagation pathway from one point in a circuit to another point in a circuit, through a described pathway of gate elements, by controlling the “off path” values of the gate elements in the path -- for example, the AND type gate would have a logic 1 placed on the off-path gate inputs to allow the path-input to pass the logic 1 or logic 0 value. This analysis is done by an ATPG tool during the generation of path delay vectors.

Design Rules for Test: also known as DFT rules

the set of design restrictions placed on a design description for the test process. These rules are applied to ease the vector generation process (manual or ATPG); to enhance the quality measurement metric (fault coverage); or to reduce the cost-of-test (test time, vector depth). Common design rule examples are: no asynchronous sequential elements, no combinational feedback paths; no non-scannable sequential elements.

Deterministic Vector Generation:

a type of ATPG where all vectors that are created are crafted deterministically by targeting faults and algorithmically generating a unique vector to exercise the fault and propagate the fault effect to an observe point. The other form of vector generation is “random”, where random groupings of logic 1's and 0's are applied and fault coverage is assessed by fault simulation.

DFATPG: Design-for-ATPG

the action of applying design rules to a chip design to ensure that an ATPG tool can successfully generate vectors and achieve a targeted quality level.

DFT: Design-for-Test

the action of placing features in a chip design during the design process to enhance the ability to generate vectors, achieve a measured quality level, or reduce the cost-of-test.

E - F

Edge Set: see Tester Edge Sets.

Embedded Core: a reusable design unit, meant to be integrated as part of a larger design, that can be delivered as a soft core (HDL and RTL), firm core (gate-level netlist), or hard core (layout description). The core can be further grouped as mergeable (the core can be mixed and merged or flattened with other logic), and non-mergeable (the core is meant to be delivered and integrated as a complete unit and “tested-in-isolation”).

Exhaustive Testing:

a test method whereby all possible 2n values are applied to the inputs of a combinational circuit to exercise every possible applied value. For sequential circuits, this method requires the application of all possible 2n values to the inputs, and the application of all possible 2m sequential sequences of the 2n values.

Expected Response:

the predicted or deterministic output of a circuit under test. When a circuit in a known state is exercised by a known input stimulus, the cared outputs (real

response) must match the expected response -- any difference between the real response and the expected response is a failure.

Failure:

a real vector response that is measured at the tester and compared to the predicted “expected response”. Any differences between the real response and the expected response is a failure and is the criteria used to discard silicon product. Although vectors are applied to exercise faults, a successfully exercised fault that is propagated to a tester observe point is called a failure.

Fault Coverage:

the metric of how many faults are exercised and successfully detected (their fault effect is observed) versus the total amount of fault content in the circuit under test.

Fault Dropping:

the part of the ATPG process where the tool removes detected faults from the total list of faults contained in the circuit. This is a tool runtime and a vector sizing optimization operation.

Fault Equivalence:

the part of the ATPG process where the ATPG tool conducts fault management by declaring the equivalent faults to a fundamental fault and then removes equivalent faults from the fault list. Equivalent faults are those that are automatically detected when a fundamental fault is exercised -- for example, detecting the stuck-at 0 fault on the output of an AND-gate requires driving the output to a logic 1, which requires driving all inputs to a logic 1, thereby detecting the stuck-at 0 faults on all inputs.

Fault Exercising:

the portion of a vector that excites the fault. In the context of this text, an ATPG tool will place a fault in a design description, and will trace back from the fault location to the necessary control points to create the portion of the vector that will excite the fault (drive it to the opposite of it's faulted value for a stuck-at fault, or apply a logic transition for a delay fault).

Fault Grading: also known as vector grading

the act of simulating a target vector against a good circuit description, and a circuit description that contains a fault -- the goal being to see if the expected response is different between the two circuits at an observe point. If a difference is detected, then the fault has been detected -- if a difference is not detected, then the fault is masked for that vector (not detected).

Fault Masking:

a fault that is not able to be detected due to a circuit configuration problem such as reconvergent fanout or redundancy. An exercised fault can not be driven uniquely to an observe point.

Fault Metric:

the measurement of the fault content of a circuit -- see fault coverage.

Fault Model:

a mathematical model of faulty behavior that can be used to assess the compliance of a circuit to various criteria. For example, structural compliance can be verified by using a stuck-at fault model, timing compliance can be verified by using a delay fault model, and current leakage compliance can be verified by using a bridging fault model.

Fault Selection:

the part of the ATPG process where the tool selects a fault from the total list of faults contained in the circuit.

Fault Simulation: see fault grading.

Full-Scan: a scan test architecture in which all sequential elements, that are not specialized memory cells, are scan cells connected into scan chains -- and proper logic precautions have been taken to allow for the ability to safely shift random logic values through the scan chains.

Functional Testing:

a form of testing where a design element is tested by the application of functional, operational, or behavioral vectors. In general these vectors are graded for structural

coverage when applied to the final product testing. If the vectors are not structurally graded, then the testing may be called “design verification”.

G - H

I - J

Iddq Testing: quiescent current testing

a form of testing where an IC is placed in a state and after the combinational switching has settled, the current drawn by the IC is measured. In CMOS processes, good transistors draw no current other than diode reverse current when the transistor is not actively switching.

JTAG Test Wrapper:

a test wrapper that uses, and maintains compliance with, the boundary scan architecture, TAP, and TAP controller described in the IEEE 1149.1 Standard. A JTAG test wrapper uses a “slow scan” method that allows functional vectors to be serialized, scanned into the interface, and then applied “all at once” with an update operation. JTAG test wrappers generally do not support the needs of at-speed test or AC test goals. JTAG is mostly associated with the chip package pin interface, and not individual cores.

Input Stimulus:

the applied logic values to a circuit under test.

K - L

Logic BIST:

a form of testing for logic circuits where the stimulus generator and/or the response verifier is placed within the circuit. The most common form of logic BIST is to use linear feedback shift registers (LFSR's) to conduct pseudo-random pattern generation (PRPG) and to conduct output pattern compression (signature analysis).

Known State:

a requirement in order to conduct testing. A circuit under test must have a known state so that a deterministic (predictable) response can be generated by the application of a known input stimulus.

M - N

Manufacturing Testing:

testing accomplished after the manufacture of a silicon product. The purpose of this testing is to verify that the manufacturing process did not add destructive defect content to the chip design. This type of testing is generally applied to packaged parts to ensure that the packaging process also did not add destructive defect content to the final product.

Mostly Full-Scan:

a partial-scan test architecture where most of the sequential elements, other than specialized memory cells, are scan cells and are connected into scan chains. The sequential cells that are not made scannable are those that are in areas of critical timing where scan insertion would negatively impact chip performance, or large register arrays where scan insertion would negatively impact the chip area budget.

Multiplexor Mode:

a method of connecting an embedded core, with or without a test wrapper, to the package pins of the part for access to test operations -- this term is generally applied to an embedded core that does not support any other form of testing but the application of functional design vectors through the functional interface, or through a bus interface, brought out to the package pins.

Non-Recurring Cost:

the “one time” cost incurred on a silicon product. In the context of this text, it is the cost-of-test that is added to the product during the design-for-test development and the vector generation process.

O - P

Observability:

the ability to observe nets, nodes, gates, or sequential elements after they have been driven to a known logic state. This has two main contexts in this text, the ability for an ATPG tool to drive fault effects to observe points in the design description during the vector generation; and the ability for a tester to observe expected response values of the chip internals at the package pins.

Parallel Scan:

the architectural support of multiple scan chains, that are designed to be used simultaneously, to reduce the number of shift clocks (shift bit depth) involved with the scan process by parallelizing the scan bit depth across several tester channels. This architecture reduces the required clock cycles needed to load a state in the design unit and reduces one aspect of the cost-of-test.

Parametric Testing:

a form of testing where the

Partial-Scan:

a scan test architecture which allows sequential elements other than specialized memory cells, to not be scan cells, and to not be connected into existing scan chains. Only some cells are made scannable and connected into scan chains -- usually only those cells that restrict the ability to achieve a high fault coverage metric.

Path Delay Fault Model:

a mathematical model of faulty behavior that relies on a complete logic pathway being slow-to-rise or slow-to-fall as the fault, and is used to verify the timing compliance of a circuit pathway. This is accomplished by driving the fault to the fail value initially, and then by applying a logic transition, and by observing the propagated fault effect at a later time interval.

Path Sensitization:

the establishing of a propagation pathway from one point in a circuit to another point in a circuit to propagate a fault effect to an observe point. This analysis is done by an ATPG tool during the generation of vectors.

Pattern:

a grouping of individual vectors. Usually the grouping of vectors has a purpose such as “the logic verification pattern”, “the memory test pattern”, or the “input leakage pattern”. Sometimes vectors are grouped into small pattern sets to fit within the memory limits of a test platform, and several of these patterns collectively make up a purposeful pattern such as “the logic verification pattern set”.

Pin Specifications:

the timing specifications involved with the ability to apply new data to chip input pins, and to observe valid chip output data. The specifications are usually defined as

input-setup, input-hold, output-valid, and output-hold.

Q - R

Quality:

a term associated with the overall goodness of a part. In the test industry, this term is taken as meaning the measurable fault coverage of a delivered device plus the device's reliability statistics.

Reliability:

a term associated with the defect-free lifetime of a product (how long does the product last in the field before it fails due to a latent defect). The metric for reliability is generally a mean-time-between-failures (MTBF) rating or a failures-in-time (FIT) rating.

Symantec System Works

-- Installed – generally will automatically defend against virus attack

the cost that is incurred and repeated each time a product is manufactured. In the context of this text, it is the cost-of-test incurred with each device -- the DFT logic impact to each die and the “in socket” test time for each product that is tested.

Retention Testing:

a form of testing to assess whether the state elements (sequential and memory) of a circuit are able to retain logic state for a long period of time. This form of testing is done routinely on memory arrays, and is sometimes accomplished on sequential

logic elements if the design is advertised as “static”.

Robust Fault Detection:

a term applied to delay testing where a path is exercised uniquely, and all off-path values required to enable the propagation path being tested, are held stable for the number of time intervals required to conduct the test. For example, a two-cycle test that launches a 0->1 transition into a path must have all off-path logic values remain stable for the two cycles -- if the off-path values toggle, then the resulting transition at the observe point may not be uniquely due to the launched transition.

S - T

Scan Cell:

a sequential element connected as part of a scan chain -- in the context of this text, a D flip-flop, having a scan multiplexor to allow selection between the functional D input and the test-only SDI input. Scan flip-flops, when in functional mode, may support all specialty sequential functions such as Set, Reset/Clear, Data Hold, Clock Enable, and Asynchronous functions, however, it is recommended that the scan function has the higher priority than all other flip-flop functions.

Scan Chain:

a set of scan cells connected into a shift register by connecting the scan cell ‘s Q, or SDO, output port to the dedicated SDI scan input port.

SDI:

the Scan Data Input port on a scan cell -- more specifically, the assert side of the input multiplexor when the control signal, SE, is asserted.

SDO:

the dedicated Scan Data Output port on a scan cell, or the connection on the scan cell Q or QB output port used as a dedicated scan connection to another scan cell's SDI port.

Scan Domain:

a set of scannable flip-flops that are connected and synchronized by the same clock, and are controlled by the same scan enable -- for designs with multiple clock

domains, there are multiple scan domains that can be shifted and sampled independent of each other, and can be operated in such a way as to preserve the natural timing relationship between clock domains if necessary.

Scan Mode:

the configuration of a design unit that supports the use of the scan chains for test purposes -- more specifically, a test encoding allows applied scan data to be read into the first scan element of certain scan chains, allows test data to be read from the last element of certain scan chains, and allows the scan enable signal to be used to control the shift or sample action of certain scan chains -- other internal control signals may also be created and asserted. A signal named “scan mode” is sometimes created to constrain certain pins and circuit elements during scan testing.

Scan Test Wrapper:

a design unit or level of hierarchy, that is viewed as the external interface of a non-mergeable or “test-in-isolation” core, that uses scan chains routed through the interface hierarchy level, and/or test access to internal scan chains, as the method to apply and evaluate isolated embedded testing.

SE:

the scan enable port on a scan cell and it's globally routed control signal -- this is the multiplexor control signal that selects whether the scan cell will update with data from the functional D input port or the test-only SDI input port -- this signal is generally distributed as a fanout tree since it must control every scannable flip-flop in a design.

SE -- Fast_SE, Slow_SE, Shift_SE:

when multiple clock domains exist, multiple scan enable signals, SE, must exist to provide independent shift and sample control of portions of the design and to create the independent scan domains -- for example, Fast_SE would be the scan enable (SE) signal distributed to all scannable flip-flops connected to the fast clock., while PLL_SE would be the scan enable signal distributed to the scan chains in the Phased-Lock-Loop design element.

SE -- Force_SE, Tristate_SE:

when scan design rules are relaxed on asynchronous elements, gated-clocking, and tristate or multiple driver nets, then scan control signals are needed to ensure safe shifting can occur (scan data is not stopped or corrupted during the shift operation, and driven contention does not occur during the shift operation). These signals may not fanout to every scan flip-flop, and so, they should be modeled in the HDL/RTL and synthesized to make timing as opposed to SE signals which are gate-level scan inserted.

Sequential:

a type of circuit or circuit description that is comprised of both combinational gates and state holding or sequential logic in the circuit description. In the context of this text, circuits that are sequential require multiple time frame combinational ATPG, or sequential ATPG, to process.

Serendipitous:

In the context of this text, this is bonus fault coverage that is discovered when a vector for a targeted fault is fault simulated. For example, a vector is created to target only one fault, when this vector is fault simulated it is discovered that 30 other faults were detected -- the 30 extra faults are serendipitous fault coverage. Another form of serendipitous fault coverage is when vectors generated against one fault model are graded against another fault model -- for example, a set of vectors with 97% stuck-at fault coverage are fault simulated against the transition delay fault model and 35% serendipitous fault coverage is discovered.

Shared Pins, Borrowed Pins:

package pins that have extra uses other than their functional purposes -- more specifically, in the context of this text, pins that are used to provide direct access to scan chains or direct access to embedded core units when those units are in a test mode.

Single Fault Assumption:

the assumption that an ATPG engine or a fault simulator uses to simplify their processes. It is much easier to conduct the various analyses with only one fault installed in the design description -- including the ability to conduct analyses with multiple faults significantly increases the compute resources needed.

Structural Testing:

a form of testing whereby the goal is to verify the structure of a chip (the wire connections and the gate truth tables). The opposing form of testing is functional or behavioral testing.

Stuck-At Fault Model:

a mathematical representation of faulty behavior that is modeled by shorting gate connections and wire routes to either VDD or VSS. The SAF is a DC fault model that is applied independent of timing or frequency.

Test:

the observation of a known expected response as a result of the application of a known input vector into a circuit in a known state -- the purpose being to measure some effect against a compliance standard.

Testability: see Design-for-Testability

Test Coverage:

a metric that is slightly different than fault coverage. Test coverage can be defined as the cumulative fault coverage of the testable logic (non-testable or redundant faults are removed from the denominator). Test coverage is generally higher than fault coverage.

Tester Accuracy:

the smallest ambiguity there is in edge placement.

Tester Edge Sets:

a tester timing format that can be applied to each pin individually. An edge set, for example, is the data format and timing information involved with applying new data to a chip input pin, and is comprised of the input-setup time, the input-hold time, and the waveform type such as NR or RTZ. A chip package pin may support more than one edge set.

Tester Precision:

the smallest measurement that the tester can resolve.

Tester Timing Format:

a term related to tester vector formats. Testers may contain waveform generators that make use of various waveform types such as non-return (NR), return-to-zero (RZ), surround-by-complement (SBC) which are designed to change logic values at the setup and hold times associated with an input pin. A test pattern comprised of logic 1's and 0's can be mapped to these various formats during the development of the test program. These timing formats are designed to verify the device pin specifications with each vector application.

Test Program:

a collection of test patterns that have been organized in a certain order and converted to the language of a specific test platform. It is called a program because

it is basically software, and the tester is the CPU -- test patterns may be comprised

of subroutines, pattern and test routine calls, and algorithmically controlled or sequenced events.

Test Wrapper:

a design unit or level of hierarchy, that is viewed as the external interface of a non-mergeable or “test-in-isolation” core, that also contains logic that allows isolated testing to occur -- the testing supported can be BIST, Scan, or direct access from multiplexed pins. A test wrapper is usually designed to reduce the functional

interface of a core to a more manageable number of test signals, to ease test integration.

Time-to-Market: TTM

the amount of time it takes to get from a design specification to a product sample. Time-to-market generally concerns the design aspect of a product development cycle.

Time-to-Volume: TTV

the amount of time it takes to get a chip into volume production. Time-to-volume generally concerns the vector delivery, tester management, and yield enhancement aspects of the development cycle.

Transition Delay Fault Model:

a mathematical model of faulty behavior that is based on a gate or gate connection being slow-to-rise or slow-to-fall, and is used to verify the timing compliance of that gate or gate connection. This is accomplished by driving the fault to the fail value initially, and then by applying a logic transition, and by observing the propagated fault effect at a later time interval.

U - V

Vector:

the collection of logical 1's and 0's applied to a chip at a given point in time. Usually the vector is referenced from a synchronizing clock signal -- in this case, the definition of a vector is the collection of logical 1's and 0's applied per clock edge. Scan vectors are a special case in where a single scan vector is the collection of logical 1's, 0's, and clocks required to load a scan chain.

Vector Efficiency:

also known as “fault efficiency” or “fault efficient vectors” -- a metric that concerns the “faults per clock-cycle”, or the fault coverage content of a vector set in relation to the size of the vector set. A rating of more faults-per-vector is generally good, but a higher rating indicates vectors with high activity content which may consume more power during application.

Vector Masking:

the ability to ignore an “expected response value” of an output vector. In the context of this text, this has two applications, the ability of an ATPG tool to print vectors in a data format that includes a vector mask (a pseudo-vector that maps onto an output vector and indicates which bits of the vector are “cared”); the ability of the test platform to ignore output values that are not required as part of the test on a vector-by-vector basis.

(同义词专栏)100个最常用英语单词的替换词

1. think 认为,思考 = take...into consideration, consider, ponder, meditate, contemplate, think over, reflect on/upon. 2. decide :断定 = come to the conclusion, arrive at the conclusion, draw the conclusion, conclude, judge, assert, wind up. 3. get: 得到 = acquire, obtain, attain, reap , earn, gain, procure 4. support: 支持 = approve of, in favor of ,uphold, stand by one's side, agree with, give ones' assent ,advocate, recommend 5. say no to: 反对 = oppose, object to, be against ,resist, boycott 6. important: 重要的 = far-reaching, profound, significant, eventful ,key, essential, fundamental, crucial, decisive, vial, substantial ,play an important part in ``` 7. use: 使用 = optimize, make best/full use of ,employ, utilize ,apply 8. glad, happy: 高兴的 = be in a good mood, cheerful, joyful, joyous, pleased, delighted 9. hard-working: 勤奋的 = diligent, studious, industrious 10. serious:认真的 = conscientious, cautious 11. calm:平静的 = sober, reasonable, sensible, rational 12. clever:聪明的 = intelligent, bright, wise, brilliant, smart, ingenious 13. tired :累的 = exhausted, fatigued, run-down, worn-out, weary 14. be used to : 适应 = be adapted to, be accustomed to , be adjusted to 15. stop:阻止 = hinder, curb, hamper, restrain, prevent, ward off, avoid 16. 好处:good side 坏处:bad side 好处,优点:advantage, merit, benefit 坏处,缺点:disadvantage, defect, flaw, drawback, deficiency 、管路敷设技术通过管线不仅可以解决吊顶层配置不规范高中资料试卷问题,而且可保障各类管路习题到位。在管路敷设过程中,要加强看护关于管路高中资料试卷连接管口处理高中资料试卷弯扁度固定盒位置保护层防腐跨接地线弯曲半径标等,要求技术交底。管线敷设技术中包含线槽、管架等多项方式,为解决高中语文电气课件中管壁薄、接口不严等问题,合理利用管线敷设技术。线缆敷设原则:在分线盒处,当不同电压回路交叉时,应采用金属隔板进行隔开处理;同一线槽内强电回路须同时切断习题电源,线缆敷设完毕,要进行检查和检测处理。、电气课件中调试对全部高中资料试卷电气设备,在安装过程中以及安装结束后进行 高中资料试卷调整试验;通电检查所有设备高中资料试卷相互作用与相互关系,根据生产工艺高中资料试卷要求,对电气设备进行空载与带负荷下高中资料试卷调控试验;对设备进行调整使其在正常工况下与过度工作下都可以正常工作;对于继电保护进行整核对定值,审核与校对图纸,编写复杂设备与装置高中资料试卷调试方案,编写重要设备高中资料试卷试验方案以及系统启动方案;对整套启动过程中高中资料试卷电气设备进行调试工作并且进行过关运行高中资料试卷技术指导。对于调试过程中高中资料试卷技术问题,作为调试人员,需要在事前掌握图纸资料、设备制造厂家出具高中资料试卷试验报告与相关技术资料,并且了解现场设备高中资料试卷布置情况与有关高中资料试卷电气系统接线等情况 ,然后根据规范与规程规定,制定设备调试高中资料试卷方案。 、电气设备调试高中资料试卷技术电力保护装置调试技术,电力保护高中资料试卷配置技术是指机组在进行继电保护高中资料试卷总体配置时,需要在最大限度内来确保机组高中资料试卷安全,并且尽可能地缩小故障高中资料试卷破坏范围,或者对某些异常高中资料试卷工况进行自动处理,尤其要避免错误高中资料试卷保护装置动作,并且拒绝动作,来避免不必要高中资料试卷突然停机。因此,电力高中资料试卷保护装置调试技术,要求电力保护装置做到准确灵活。对于差动保护装置高中资料试卷调试技术是指发电机一变压器组在发生内部故障时,需要进行外部电源高中资料试卷切除从而采用高中资料试卷主要保护装置。

新能源汽车运用 与维修专业介绍

新能源汽车运用与维修专业 一、专业简介 专业名称及代码:新能源汽车运用与维修(600212) 招生生源及学制:高中或中职毕业生(三年) 产业背景及就业前景: 2012年以来国务院相继出台了《节能与新能源汽车产业发展规划(2012~2020年)》等文件,为新能源汽车发展营造良好的政策环境,并起到了强有力的推动作用。2017年中国新能源汽车产销均接近80万辆,分别达到79.4万辆和77.7万辆,同比分别增长53.8%和53.3%,预计今年2018年中国新能源汽车的销售增长将达到40%左右。依据十三五规划,到2020年新能源汽车产量将达到200万辆,累计产量超过500万辆。浙江省新能源汽车产业规模居国内领先,形成了包括整车制造、关键零部件、核心基础材料研发生产、新能源汽车示范运营、充电设施制造与建设在内的较为完整的新能源汽车产业链。 通过调研发现,新能源汽车专业的人才已经成为各个新能源企业争夺的对象,出现了供不应求的局面。目前新能源企业中有85%的技术人员并非新能源专业毕业,而是相近或相关的机械、电子、控制等传统专业。由于从业人员总体素质偏低,导致劳动生产率低、管理水平低、服务质量低、事故率高。通常,汽车保有量与汽车技术服务从业人员比例以30:1为宜,以2020年电动汽车保有量计算,所需技术人员为16.7万人,而现有技术人员数量远远不能达到要求,就业前景非常广阔。 专业培养目标:培养德、智、体、美全面发展,适应社会发展与经济建设需要,掌握新能源汽车结构及工作原理,具备新能源汽车使用、诊断、维修、服务等技能,适应新能源汽车行业技术、管理、生产、服务需要的高素质技术技能人才。 职业资格证书:汽车维修工技术等级证书、低压电工作业证书、机动车检测维修专业技术人员职业资格证书(选考)、汽车驾驶证书(选考)。 二、专业实力及特色 1.创新师资培养模式,校企共育一流师资队伍 汽车学院多年来通过实践,构建了“多渠道、递阶式、多维提高”的师资培养模式。通过“学校与企业培训互补、理论与技能训练结合、专职与兼职互融、学历提升与终身学习并举”等师资培养机制的运行,培养了一支职教理念先进、理论实践双优的教学团队。 本专业教师团队共计14人,其中专任教师12人,企业兼职教师2人。专任教师学历层次较高荣誉丰硕,其中博士1人、硕士11人,全国交通技术能手2名,省高职高专专业带头人2名,全国技能大赛优秀指导教师3人;教师团队梯次合理,其中副教授6人、高级实验师1人、讲师2人、助教3人,双师型教师有10人,其中8人系统接受过企业培训,具有丰富的实践经验。 2.产教融合共建共享,建成一流实训教学平台 汽车学院现有实训基地面积共计12000m2,校内实训条件位居全国一流。为完成本专业教学,汽车学院完成了新能源汽车实训室的建设,陆续采购了吉利、比亚迪、丰田等品牌新能源汽车,以及纯电动汽车整车动力系统实训台、新能源汽车电机电控系统实验台、电机控制与测试实训装置、新能源汽车专用诊断测试仪器等,总价值接近1200余万元。 秉承校企共建共享理念,2018年与浙江吉利汽车销售有限公司合作建立新能源校企合

小学生英语单词近义词大全

小学生英语单词近义词大全 1. 大: big--- large 2. 照片:picture ---photo 3.厕所:toilet—WC 4.课程:class —lesson 5.每个人:everyone—everybody 6.每个人:glass —cup 7.钱包:purse— wallet 8.家:home—house 9.漂亮:beautiful—pretty 10.通常:usually—often 11.旁边:near —beside 12.花园:garden —park 13.桌子:desk —table 14.湖泊:river —lake 15.回家:go home —come home 16.刚才:amoment ago—just now 17.大量的:a lot of —lots of — many 18.擅长:be good at—do well in 19.当然:of course —sure

20.来自:befrom—come from 21.散步:take a walk —go for a walk 22.坐公交:take a bus—by bus 23.想要:would like —want 24.寻寻:look for— find 25.会:meeting---party 【篇二】 1. 自行车:bike---bicycle 2. 上:above ---on 3. 父亲:father---dad 4. 下:under---below 5. 晚上:evening ---night 6. 孩子: kid --- child 7. 说:speak--- talk/say 8. 欢乐:glad --- happy 9. 快:fast --- quick 10. 妈妈: mother ---- mum 11. 听:hear --- listen 12. 后面:below --- under 13. 看:see--- watch/look

同义词词汇表

同义词词汇表 写在前面的话 各位亲,你们都是优秀的,因为你们正在奋力实现自己的梦想。 当然,一路上你们需要劈荆斩棘,听说读写,各有难处。对于托福阅读来,难就难在词汇要求高。单词不是万能,但不背单词万万不能。阅读题目中约有1/4 是单词题,因此想要驾驭托福阅读,一定要搞定单词题。而且面对这些题目时,最好做到秒杀它,这样才能有余裕处理其它较复杂阅读题目。那么如何秒杀?我们先来了解一个事实:新托福考试自2005年问世以来,考重题的概率已经达到了惊人的程度,一些词汇题也多有重复。因此要想秒杀,我们可以事先牢记历史上考过的词汇。但不用紧张,这些词汇的总数并不多,而且大部分收录于本手册中,共计20页左右,供亲们短期强化记忆。路遥费马力,一鼓作气,再而竭,三而衰,建仪大家短期内过完一遍,然后重复重复再重复,在读文章中重复,在做题目中重复。如此操作,定能在词汇题上所向披靡! 另外,除准备词汇题外,该手册还有一重要作用─准备同义替换。我们再了解一个事实:阅读题目的选项通常都是对原文某句话的同义改写,即同样的意思,不同的表达。因此,对于这种换了马甲的答案,我们一定要能洞穿其本质没变。如何洞穿?熟悉常见的同义替换词组就是一个好方法。但是对于一些词汇间的本质联系,亲们可能理解上有些困惑,若有此种情况,强烈建议使用美国的麦克米兰词典,该词典用2000左右的基础词汇解释了所有的高级词汇, 何其牛尔! 最后建议在平日做题时,若有词汇题错误,或者理解错误,不妨纳入那手册,集中记忆,为熟手尔!手册中难免有纰漏,请大家当当啄木鸟,指正错误, 共同完善它。 期望大家托福阅读取得好成绩,托福取得好成绩!

A 1.absorb=take in=assimilate=incorporate(incorporate sth into sth)吸收 incorporate=embrace=include 包括(反义:exclude, rule out, remove, preclude)2.appealing=attractive=compelling=inviting=tempting=popular 吸引的 (appeal为名词时=popularity;beckon= attract 吸引) 3.absorbed=engrossed=fully engaged in 全神贯注=be not absent 4.abundant =abound with=a number of=do not lack=myriad of 大量的 5.accommodate=provide with=endow with 给予 6.accommodate to = adapt to=be accustomed to= 适应( gear 表示使适合) 7.accumulate=collect= build up= amass= gather 累积(增加)=increase (augment= increase 扩大) 8.adherent=advocate=supporter 支持者,拥护者 9.adjacent (to)=nearby=neighboring=adjoining 相邻的 10.advent=arrival=coming=introduction of sth 到来,引入 11.affair = event= occasion =matter=episode事情,事件 12.akin to=similar to=alike= analogous 相类似的(等于动词resemble) 13.allocate=distribute =designate 分配,指定钱或人如何使用 14.almost=nearly=virtually 几乎(程度之深) 15.aloft=overhead=above (在…上面) 16.alter=change=transform=fluctuate= be unstable 变化,不稳定(convert 使转变) be stable=do not change 17.anticipate= expect 期望,预料 18.antiseptic= sterilized=clean 无菌的,干净的 19.antithesis=oppose=disagree with= disapprove of 反对,不同意 20.apparent=obvious=evident明显A is made evident by B= B show A (in evidence=evident: It was early, and few pedestrians were in evidence on the city streets) 21.appreciable= noticeable=striking =conspicuous 显而易见的 22.approach= come closer to 靠近 23.approach= means= method=manner=avenue 方法, 方式 24.article=item=object 物品 25.assertion=strong statement 断言 26.as a rule=usually=generally 通常,一般来说 27.assorted=various 各种各样的 28.assist=benefit=help= aid=favor 对什么有好处或帮助( benefit 有时 =boon=favor, boon=something useful that brings great benefits and make your life easier) 29.attribute=characteristic=feature=trait=property=hallmark 特点,特征( 请注意: character表个性,人物;be c haracterized by…具有…的特点) 30.attribute to= ascribe to =accredit to=due to= owe to 归因于… ------------------------------------

英语中常见的同义词集锦

表示“需要”(v)的单词:need, require, involve ,entail 表示“意味着”的单词:mean, involve, entail 表示“宿舍”的单词:dormitory, quarters, lodgings 表示“住宿”的单词:accommodations, (a)lodging 表示“欺骗”(v)的单词:cheat, deceive, trick, fool 表示“渴望”(v)的单词和词组:desire, yearn for/after, long for, thirst for,aspire to do sth, look forward to doing sth, keen on/about doing sth, keen to do sth, keen that, have an urge to do sth(具有做某事的强烈欲望,非常想做某事,形容极度渴望)表示“同情”(v)的词组:sympathize with, yearn for, feel sympathy for 表示“重要的”的单词:important, crucial, vital, essential, integral, indispensable, significant 表示“参加,从事”的词组:take part in, join(in),participate in, involve sb in (主动, 其被动形式为sb be involved in), sb be engaged in=sb be employed in 表示“能力”的单词: ability和 capability(主要用于人)talent(只用于人), competence, capacity(可用于人或物), faculty 表示“想象”(v)的单词和词组:imagine, fancy, fantasy,envisage(英)=envision(美) conceive of 表示“包含(v)”的单词和词组:include, involve, comprehend, inclusive of, embrace, embody, comprise, contain(实际包含的量),encompass 表示“能容纳”的词组:can hold/accommodate 表示“表现,体现”(v)的单词:render, reflect, display, indicate, manifest, embody 表示“导致,引起(v)”的单词和词组:render, entail, lead to, result in, bring about, cause, trigger=prompt(诱发),pose(本义为造成问题或危机) 表示“强大的,强有力的”的单词和词组:powerful, mighty, potent, strong 表示“(感觉等)敏锐的,灵敏的”的单词:keen, acute(首选这两个词)perceptive 表示“提供”的单词和词组:provide/supply sb with sth=provide/supply sth for sb=render/offer sb sth, contribute sth to sth 表示“忙于……,埋头于……”的单词和词组:be buried in, be employed in, be engaged in, sb be immersed in=immerse oneself in 表示“致力于”的词组:devote oneself to =dedicate oneself to, sb be devoted to=sb be dedicated to 表示“表现,体现”(v)的单词:render, reflect, manifest, characterize 表示“显示,表明”(v)的单词:show, suggest, indicate, reflect, reveal,(首选这三个词)emerge 表示“证明”(v)的单词:validate, demonstrate, verify, confirm,prove 表示“证实(v)”的单词:affirm,confirm, prove 表示“说明,阐释(v)”的单词:explain, illustrate, elaborate 表示“持续不断的”的单词:continual,continuous, incessant 表示“(计划,规定等)被实施,生效”的词组有come into effect/force, be implemented, be put into effect/execution, be carried into execution=be put in/into execution 表示“意识到+从句”的词组:know+that从句 realize+that从句 be/become aware of the fact+ that从句 be conscious+that 从句 表示“阻止,阻碍”(v)的单词或词组:prevent/inhibit/hinder sb from doing sth, impede sb to do sth, hamper sb in doing sth

新能源汽车运用与维修专业介绍

新能源汽车运用与维修 专业介绍 公司标准化编码 [QQX96QT-XQQB89Q8-NQQJ6Q8-MQM9N]

新能源汽车运用与维修专业 一、专业简介 专业名称及代码:新能源汽车运用与维修(600212) 招生生源及学制:高中或中职毕业生(三年) 产业背景及就业前景: 2012年以来国务院相继出台了《节能与新能源汽车产业发展规划 (2012~2020年)》等文件,为新能源汽车发展营造良好的政策环境,并起到了强有力的推动作用。2017年中国新能源汽车产销均接近80万辆,分别达到万辆和万辆,同比分别增长%和%,预计今年2018年中国新能源汽车的销售增长将达到40%左右。依据十三五规划,到2020年新能源汽车产量将达到200万辆,累计产量超过500万辆。浙江省新能源汽车产业规模居国内领先,形成了包括整车制造、关键零部件、核心基础材料研发生产、新能源汽车示范运营、充电设施制造与建设在内的较为完整的新能源汽车产业链。 通过调研发现,新能源汽车专业的人才已经成为各个新能源企业争夺的对象,出现了供不应求的局面。目前新能源企业中有 85%的技术人员并非新能源专业毕业,而是相近或相关的机械、电子、控制等传统专业。由于从业人员总体素质偏低,导致劳动生产率低、管理水平低、服务质量低、事故率高。通常,汽车保有量与汽车技术服务从业人员比例以30:1为宜,以2020年电动汽车保有量计算,所需技术人员为万人,而现有技术人员数量远远不能达到要求,就业前景非常广阔。 专业培养目标:培养德、智、体、美全面发展,适应社会发展与经济建设需要,掌握新能源汽车结构及工作原理,具备新能源汽车使用、诊断、维修、服务等技能,适应新能源汽车行业技术、管理、生产、服务需要的高素质技术技能人才。 职业资格证书:汽车维修工技术等级证书、低压电工作业证书、机动车检测维修专业技术人员职业资格证书(选考)、汽车驾驶证书(选考)。 二、专业实力及特色 1.创新师资培养模式,校企共育一流师资队伍 汽车学院多年来通过实践,构建了“多渠道、递阶式、多维提高”的师资培养模式。通过“学校与企业培训互补、理论与技能训练结合、专职与兼职互融、学历提升与终身学习并举”等师资培养机制的运行,培养了一支职教理念先进、理论实践双优的教学团队。 本专业教师团队共计14人,其中专任教师12人,企业兼职教师2人。专任教师学历层次较高荣誉丰硕,其中博士1人、硕士11人,全国交通技术能手2名,省高职高专专业带头人2名,全国技能大赛优秀指导教师3人;教师团队梯次合理,其中副教授6人、高级实验师1人、讲师2人、助教3人,双师型教师有10人,其中8人系统接受过企业培训,具有丰富的实践经验。 2.产教融合共建共享,建成一流实训教学平台

英语常见单词同义词

As/so far as +sb+be concerned 就谁而言Shallow a肤浅的=superficial Allow for 考虑到 Invention n发明 Line up awith b 对准 Level off 保持稳定 On the level 真诚 Do ones level best 做到最好 Effortless 不费力的 Infer v 推导 Inferiority n 劣势 Superior a 杰出性 Inferior a低等的 Inference n推理推导 Defer to服从于有to Deference n 服从听话 Deduce v 演绎 Induce v诱发 Inducement n不好的事情原因 Conclusion n 结论 Professionalize v职业化 ize什么化Professionalization 专业化 Professionalism n职业水准 Suppose =provided 倘若 Provision=agreement 条款 Supply n 补给品 Physically challenged 残疾人 Unchallenged a不成问题的 Mass-market label 大众商标 Mass-figure 大数据 Anticipate 预测 Precisely 精确的 Productive a富有成效的多产的 Productivity potential 生产潜力 Only 句首引起倒装 In turn 回报 State 州复数是国家 Fearsome 可怕 Agenda 日程 In businesses of every variety 各行各业Left,被动分词后面的名词 which is 省略了Put right 解决 Curb=control over 控制 Rationalization of exploitation 剥削合理化

新能源汽车技术论文

新能源汽车 摘要: 在不断加剧的“人、车、自然”的矛盾之下,人们开始从把目光从传统的燃油汽车转向新能源汽车。文章主要介绍与新能源汽车相关的一些情况。 首先,介绍了新能源汽车的基本概念,与传统的汽车划清界限。在认清它的概念之后,根据新能源汽车现有的技术及发展情况对它做出分类,并对每种类型作出详尽的描述,以便更清楚了解每种类型的汽车的特点。然后,分析新能源汽车发展的战略背景及现状介绍,列出福克斯电动车及雷诺电动概念车DeZir两个实例,对现阶段情况下新能源汽车所面对的难题作出分析,并且针对现状对未来进行展望,提出发展方向。最后,文章指出新能源汽车是实现汽车工业可持续发展的必由之路,但是现在依旧面临重重困难,未来任重而道远。 关键词:新能源汽车电池可持续发展难题 正文: 一.新能源汽车概述 随着车辆增加,导致石油供不应求,目前世界上2/3的石油被汽车用掉【1】。石油价格与日俱增,环境污染日趋严重,“人、车、自然”之间的矛盾愈加突出,人们不得不把目光重新放在节能与新能源汽车上。新能源汽车是指除汽油、柴油发动机之外所有其它能源汽车。我国2009年7月1日正式实施了《新能源汽车生产企业及产品准入管理规则》,明确指出:新能源汽车是指采用非常规的车用燃料作为动力来源(或使用常规的车用燃料、采用新型车载动力装置),综合车辆的动力控制和驱动方面的先进技术,形成的技术原理先进、具有新技术、新结构的汽车。 二.新能源汽车分类及简介 新能源汽车包括电动汽车、气体燃料汽车、生物燃料汽车、氢燃料汽车。

1.电动汽车——以电能为动力的汽车,一般采用高效率充电电池,或燃料电池为动力源。电能是二次能源,可以来源于风能、水能、热能、太阳能等多种方式。电动汽车包括纯电动汽车、混合动力(电动)汽车和燃料电池电动汽车。 (1)纯电动汽车(PEV)【2】 纯电动汽车是指完全由动力蓄电池提供电力驱动的电动汽车,虽然它有134年的悠久历史,但一直仅限于某些特定范围内应用,市场较小。主要原因是由于各种类别的蓄电池,普遍存在价格高、寿命短、外形尺寸和重量大、充电时间长等严重缺点。 铅酸电池有一定价格优势,但是由于它太过笨重,充电时间又长,因此在低端产品市场上有较强的竞争力和实用性,只被广泛用于车速小于50km/h的各种场地车、高尔夫球车、垃圾车、叉车以及电动自行车上。 镍氢电池的主要优点是技术比较成熟,安全性较好,相对寿命较长,但是由于镍金属占其成本的60%,导致镍氢电池价格居高不下。 锂离子二次电池作为新型高电压、高能量密度的可充电电池,其独特的物理和电化学性能,具有广泛的民用和国防应用的前景。其突出的特点是:重量轻、储能大、无污染、无记忆效应、使用寿命长。同时它是一种真正的绿色环保电池,不会对环境造成污染,是目前最佳的能应用到电动车上的电池。 (2)混合动力电动汽车(HEV) 由于完全由动力蓄电池驱动的纯电动汽车,其性能/价格比长期以来都远远低于传统的内燃机汽车,难于与传统汽车相竞争,上个世纪90年代以来着手开发混合动力汽车。混合动力电动汽车是指具备两个以上动力源、而其中有一个可以释放电能的汽车。 混合动力汽车按混合方式不同,可分为串联式、并联式和混联式三种;按混合度(电机功率与内燃机功率之比)的不同,又可分为微混合、轻度混合和全混合三种。根据研究表明,混合动力汽车的节油率几乎与汽车功率的混合度和汽车的生产成正比上升。因此,从长远来看,研制全混合电动汽车是一种必然趋势。(3)燃料电池电动汽车(FCEV) 20世纪60年代,研发出了液氢和液氧发电的燃料电池。由于石油危机和大气污染日趋严重,以质子交换膜式为代表的燃料电池技术,受到世界各国普遍重视。 质子交换膜燃料电池(PEMFC)主要优点:其排放生成物是水及水蒸汽,为零污染;能量转换效率可高达60~70%;无机械振动、低噪声、低热辐射;宇宙质量中有75%是氢,地球上氢也几乎是无处不在。氢还是化学元素中质量最轻、导热性和燃烧性最好的元素;氢的热值很。但燃料电池电动汽车存在发动机使用寿命短、制造成本高、环境适应很差和燃料使用成本大等的技术、经济问题。 2.气体燃料汽车——利用可燃气体作能源驱动的汽车。 汽车的气体代用燃料种类很多,常见的有天然气和液化石油气。 气体燃料汽车——专用气体燃料汽车、两用燃料汽车和双燃料汽车。 (1)专用气体燃料汽车是以液化石油气、天然气或煤气等气体为发动机燃料的汽车;两用燃料汽车是指具有两套相对独立的供给统系,一套供给天然气或液化石油气,另一套供给天然气或液化石油气之外的燃料,两套燃料供给系统可分别但不可共同向气缸供给燃料的汽车,如汽油/压缩天然气两用燃料汽车等; (2)双燃料汽车是指具有两套燃料供给系统,一套供给天然气或液化石油气,另一套供给天然气或液化石油气之外的燃料,两套燃料供给系统按预定的配

含近义词词语大全

含近义词词语大全 含近义词词语大全 近义词,是指词汇意义相同或相近的词语,如“美好”和“美妙”、“懒惰”和“怠惰”、“枯萎”和“干枯”、“宽敞”和“宽阔”。与“近义词”意思相近的词为同义词。 含近义词词语大全(一) 层峦叠嶂心烦意乱崇山峻岭奇形怪状惊涛骇浪 装模作样摇头晃脑文丛字顺改朝换代通风报信 能说会道甜言蜜语分门别类追根究底虚情假意 幸灾乐祸通情达理丰功伟绩歪门邪道生擒活捉 离乡背井豪言壮语汪洋大海琼浆玉液斩尽杀绝 深思熟虑真凭实据灵丹妙药凶神恶煞心满意足 街头巷议翻山越岭精雕细刻生拉硬扯琼楼玉宇

风言风语全心全意必恭必敬呆头呆脑多才多艺 独来独往暴饮暴食非亲非故怪模怪样诚惶诚恐 敢作敢为古色古香戒骄戒躁尽善尽美见仁见智 克勤克俭疑神疑鬼偏听偏信倾国倾城群策群力 如痴如醉如火如荼任劳任怨十全十美土生土长 同心同德先知先觉各种各样载歌载舞无忧无虑 无边无际无影无踪不卑不亢不慌不忙不屈不挠 不伦不类自吹自擂一朝一夕一针一线五湖四海 朝三暮四四分五裂丢三落四四平八稳五颜六色 七拼八凑七嘴八舌五光十色千娇百媚千呼万唤 千丝万缕千头万绪千军万马千真万确千差万别

千变万化前因后果千山万水东倒西歪南征北战 含近义词词语大全(二) 安魂定魄:魂、魄:人的.灵气、精神。指使人心安定。 卑身贱体:①谓俭约勤苦。②弯腰俯首,屈从奉迎。 察颜观色:观察别人的脸色,以揣摩其心意。 赤身裸体:赤:光着。大部分身体或全身裸露。 道尽途穷:道、途:路。走到路的尽头。形容无路可走,面临末日。 丢魂失魄:形容非常惊慌,没头脑,无主见。 斗怪争奇:指以奇怪取胜。:含近义词的成语 端本正源:端:端正,清理。本:根本。源:根源。指从根本上加以整顿清理。 关门闭户:门户都关闭起来。形容冷清寥落。 喊冤叫屈:为遭受冤屈而喊叫。 呼朋唤友:指招引意气相投的人。 秽言污语:指粗俗下流、不堪入耳的话。 积年累岁:指经过的时间长。同“积年累月”。 家家户户:每家每户。指所有的人家。 街号巷哭:号哭于大街小巷。形容悲痛至极。 街谈巷说:大街小巷里人们的议论。指民间的舆论。同“街谈巷议”。

新能源汽车技术专业人才培养方案....

新能源汽车技术专业 人才培养方案 烟台职业学院 2013年7月 目录 一、专业信息 (1) 二、专业培养目标及规格 (1) 三、毕业条件 (2) 四、职业领域及就业岗位 (2) 五、典型工作任务 (3) 六、课程设置及教学安排 (3) 七、课程描述 (6) 八、各类课程学时学分比例 (10) 九、考核评价 (10) 十、教学条件保障 (11)

新能源汽车技术专业人才培养方案 一、专业信息 1.专业代码:580420 2.学历层次及学制:专科三年 3.招生对象:普通高中毕业生、对口高职毕业生 二、专业培养目标及规格 (一)培养目标 本专业培养与我国社会主义现代化建设要求相适应的,在德、智、体、美等方面全面发展的,面向新能源汽车售后技术服务和管理企事业单位,在生产、服务一线能从事新能源汽车维修、检测、管理等工作,具有良好职业道德素质,能独立学习与职业相关的新技术、新知识,对社会、企业和客户有强烈责任意识,具有职业生涯发展基础的应用性高技能专门人才。 (二)培养规格 1.基本素质 (1)思想政治素质过硬,道德情操高尚,身心素质健康; (2)具有良好的适应企业或行业要求的职业理想、职业道德、人文素质、团队合作精神、创新精神和创业能力。 2.知识要求 (1)利用计算机完成各种汽车维修单据、表格处理;

(2)利用数学知识进行汽车维修成本核算; (3)会使用外语查阅外文汽车维修资料; (4)会阅读和分析汽车电路图,并能拆画部分主要电路; (5)掌握汽车机械部件各个总成的机械原理及工作原理; (6)掌握新能源汽车电池系统、电机驱动系统以及控制系统的检修,并会对新能源汽车进行整车故障诊断与排除。 3.能力要求 (1)职业能力 A.职业核心能力 ①具备基本的计算机操作能力; ②具备专业必须的机械、电工电子、电力电子等技术应用能力; ③具备正确使用外语专业资料的能力。 B.职业岗位能力 ①掌握新能源汽车构造原理和维修诊断知识与技能; ②掌握新能源汽车售后服务知识与技能; ③具有安全、文明生产和环境保护的相关知识和技能。 (2)方法能力

新能源汽车技术创新研究「范本」

新能源汽车技术创新研究「范本」 新能源汽车技术创新研究本文简介:摘要:环境污染与能源消耗是一项全球各国都十分重视的问题。由于我国经济的高速发展,导致的环境污染与能源消耗日趋严重。而汽车行业作为21世纪的时尚产业,应立足当前所面临的汽车尾气污染问题与能源消耗问题。基于此,文章以新能源汽车主要推广城市的创新数据为基础,在城市视角下探究了新能源汽车的创新技术,以供相关 新能源汽车技术创新研究本文内容: 摘要:环境污染与能源消耗是一项全球各国都十分重视的问题。由于我国经济的高速发展,导致的环境污染与能源消耗日趋严重。而汽车行业作为21世纪的时尚产业,应立足当前所面临的汽车尾气污染问题与能源消耗问题。基于此,文章以新能源汽车主要推广城市的创新数据为基础,在城市视角下探究了新能源汽车的创新技术,以供相关研究人员参考。 关键词:城市视角;新能源汽车;技术创新 新能源汽车作为汽车产业发展的重要领域之一,在节能减排理念的影响下,更应从技术层面入手,加大对技术创新的研究力度,找准技术发展方向,从而更好地实现新能源的开发与利用,为汽车行业的可持续发展护航。可见,就新能源汽车主要推广城市的调研数据为基础,分析新能源汽车技术创新发展的瓶颈因素,并提出未来的新发展方向,将有着十分重要的现实意义。 1基于城市视角下发展新能源汽车的重要性 汽车产业是构成国民经济体系的重要组成元素,它与我们的工作、生活的方方面面都有着密切相连的关系,现已成为了现代化社会必不可缺的一员。但是,我们可以看到传统的汽车以石油为燃料,这种石油型汽车虽然能够为人们提供便捷、舒适的交通工具,但是同时也增加了对化石能源的依赖,加深了能源的损耗。基于对城市未来可持续发展的考虑,发展新能源汽车已经成为了汽车成业未来发展的新方向。从宏观角度进行分析,开发新能源汽车是汽车领域的一股新潮流,同时也是现代社会的一种必然趋势。科技的进步、社会的变更、人们价值观的变化以及人类生活方式的改变等等都对汽车未来的发展趋势产生着影响,而汽车的开发必须要和当下社会发展的要求相符合。面对当下社会的主要问题——环境能源

2017英语词汇近义词分类整理

高考英语近义词(分类)整理 动词类: 1“看” look看的动作/ see看的结果; watch观察/observe为了研究进行的观察; Notice注意catch sight of看见 / stare好奇地看/ glare瞪着看 Glance瞅见/glimpse瞥见 see a film watch TV 2“说” tell sth tosb.=tell sb sth告诉的内容 talk with sbabout sth 强调说话者之间的交流Say sth诉说的内容 speak in English说的语言whisper sth to sb 耳语 Inform sb of sth 通知某人某事 reason/talk/persuade sb into doing sth 说服某人做某事 bargain讨价还价 chat聊 天 repeat重复 explain解释 warn警告remind提 醒Discuss 讨论debate辩论 figure指出declare宣布claim 自称mention 提起 admit 承认deny 否绝describe描 述announce 公布introduce 介绍complain抱怨 3“叫” cry哭叫 call叫 shout大喊 scream尖叫 moan呻吟 sigh 叹气quarrel大吵 4“问” ask 询问interview 采访express表达 question审问 5“答” answer回答 respond回应(用其他方式回应) reply回复 6 “听” listen to听的动作 hear听的结果 pick up收听 overhear 无意听到 7“写” dictate听写 write sth 写describe描写 drop a line 写信draw画 take down/write down写下,记下 8“拿/放” take拿走 bring拿来 hold举着 carry扛,挑(无方向性)fetch拿来拿去 lift举 put放lay 铺/放置 pull 拉/push推 9“抓” take hold of 抓着seize紧抓 grasp 握住 scratch 抠10“打” hit一次性的打击 beat不间断的打击 strike突然的击打/突然想到 blow吹刮 attack攻击 11“扔” throw扔 drop掉放弃错过fall 倒下无意掉下来wave 招手shake摇 12“送” send寄送 deliver递送 give给 offer 主动给予see off 给某人送行 13“摸/抱” touch摸/fold折叠 /embrace拥抱/ hug抱/hold 握 in one’s arms 14“踢/碰” kick踢/knock敲/ tip 轻敲

英文同义词替换大全

同义词替换大全 Cambridge4TEST1 1.ignore=pay no attention=not pay any attention=take no notice=not ta ke any notice忽略,无视v. 2.encounter=face=confront=meet 遇见,遭遇v. 3.mistaken view=misconception错误的观点n. 4.easy to reach=accessible容易达到的adj. 5.change=modify(modification)改变v. 6.destruction=destroy=loss毁坏n. 7.investigate=make inquiries=enquiries=go into=probe=look into调查v. 8.where=geographical location表地点 9.important=vital=essential=crucial重要的adj. 10.reason=cause=factor=origins=root=stimulus=impetus原因n. 11.protect=guard=safeguard=shield=conservation保护v. 12.newspapers,television=media媒体n. 13.where to live=habitat居住地n. 14.get warmer=global warming变暖n. 15.contribute to=play a part有助于v. 16.survive=continuing existence幸存,活下来v. 17.curriculum=course=syllabus课程n. 18.link to=be connected with=be linked with把…和…相联系v.

3 、新能源汽车技术专业简介

东风公司新能源汽车技术定向培养简介汽车运用与维修专业(汽车类专业) 世界石油资源的不断减少,传统汽车产生的尾气,对环境的影响逐步加剧,发展新能源汽车被提高到国家战略高度。新能源汽车的新技术,将会替代燃油机汽车。纯电动汽车、燃料电池汽车、燃气汽车将会主导汽车产业,新能源汽车将会重新定义世界汽车的发展格局。东风新能源汽车将会引领中国汽车技术革新的发展方向。 东风汽车公司为了适应新能源汽车发展的需要,与湖北泽优职业教育公司进行深度合作,制定了新能源汽车技术人才培养计划,组建了湖北泽优职教公司东风汽车公司高级技工学校新能源汽车教学基地,指定该基地为东风公司唯一定点培养新能源汽车人才的基地,为全国东风新能源汽车4S店、全国公交集团、出租公司、东风实业部技术骨干培养合格的新技术、新技能人才。 湖北泽优职业教育公司、东风汽车公司、东风汽车公司高级技工学校的强强联合,从自主教材研发到教学支持,从教师培训到实操训练,从理论学习到见习提高,从实训考证到最终就业,制定了东风新能源汽车人才定向培养方案,形成了一套完整的教育教学体系,为学生的稳定就业和职业发展打下了坚实的基础。 一、专业名称:汽车运用与维修(汽车类专业) (新能源汽车人才定向培养) 二、联合办学模式: 中职:2+0.5+0.5、2.5+0.5;2+1、2+2;高职:2+1 即:前期在本校学习传统汽车四大系统,后期在湖北泽优职业教育东风汽车公司高级技工学校教学基地学习新能源汽车专业知识、实训实操、见习、考证、对口就业。 三、企业师徒制实训 报读汽车运用与维修(新能源汽车技术定向培养)专业学生,有半年时间在东风汽车公司、比亚迪股份公司或者其他车企从事带薪师徒制顶岗实习。 四、就业方向:新能源汽车公交集团、新能源汽车出租车公司、新能源汽车4S店、东风汽车公司和比亚迪股份公司实业部基层管理干部、技术骨干、及其他新能源车企。 五、工资待遇:试用期3000元左右(大部分提供食宿),转正后3500--8000元左右。(根据学生自身情况,不同的岗位而定)

相关文档
相关文档 最新文档