当前位置:文档库 › 发电厂电气一次部分设计(全)

发电厂电气一次部分设计(全)

发电厂电气一次部分设计(全)
发电厂电气一次部分设计(全)

发电厂电气部分课程设计

目录摘要……………………………………………...................... 第1章设计任务……………………………..................... 第2章电气主接线图………………………........................ 2.1 电气主接线的叙述…………………………….. 2.2 电气主接线方案的拟定..................................... 2.3 电气主接线的评定.................................................. 第3章短路电流计算………………………..................... 3.1 概述.................................................................. 3.2 系统电气设备电抗标要值的计算................. 3.3 短路电流计算.................................................. 第4章电气设备选择………………………..................... 4.1电气设备选择的一般规则………………………. 4.2 电气选择的技术条件……………………………. 4.2.1 按正常情况选择电器………………………....... 4.2.2 按短路情况校验……………………………........ 4.3 电气设备的选择…………………………………. 4.3.1 断路器的选择………………………………. 4.3.2 隔离开关的选择……………………………. 第5章设计体会及以后改进意见…………........................ 参考文献………………………………………....................... 摘要

110kV变电站电气一次系统设计毕业设计(论文)

毕业设计论文 110KV变电所电气一次部分初步设计

毕业设计(论文)原创性声明和使用授权说明 原创性声明 本人郑重承诺:所呈交的毕业设计(论文),是我个人在指导教师的指导下进行的研究工作及取得的成果。尽我所知,除文中特别加以标注和致谢的地方外,不包含其他人或组织已经发表或公布过的研究成果,也不包含我为获得及其它教育机构的学位或学历而使用过的材料。对本研究提供过帮助和做出过贡献的个人或集体,均已在文中作了明确的说明并表示了谢意。 作者签名:日期: 指导教师签名:日期: 使用授权说明 本人完全了解大学关于收集、保存、使用毕业设计(论文)的规定,即:按照学校要求提交毕业设计(论文)的印刷本和电子版本;学校有权保存毕业设计(论文)的印刷本和电子版,并提供目录检索与阅览服务;学校可以采用影印、缩印、数字化或其它复制手段保存论文;在不以赢利为目的前提下,学校可以公布论文的部分或全部内容。 作者签名:日期:

学位论文原创性声明 本人郑重声明:所呈交的论文是本人在导师的指导下独立进行研究所取得的研究成果。除了文中特别加以标注引用的内容外,本论文不包含任何其他个人或集体已经发表或撰写的成果作品。对本文的研究做出重要贡献的个人和集体,均已在文中以明确方式标明。本人完全意识到本声明的法律后果由本人承担。 作者签名:日期:年月日 学位论文版权使用授权书 本学位论文作者完全了解学校有关保留、使用学位论文的规定,同意学校保留并向国家有关部门或机构送交论文的复印件和电子版,允许论文被查阅和借阅。本人授权大学可以将本学位论文的全部或部分内容编入有关数据库进行检索,可以采用影印、缩印或扫描等复制手段保存和汇编本学位论文。 涉密论文按学校规定处理。 作者签名:日期:年月日 导师签名:日期:年月日

发电厂电气部分 作业

作业 一.单项选择题 1.下面所述的电压等级,是指特高压交流输电线路的电压等级(D ) A)330kV;B)±500kV;C)±800kV;D)1000kV;E)220kV 2.下面所述的电压等级,是指特高压直流输电线路的电压等级(C ) A)330kV;B)±500kV;C)±800kV;D)1000kV;E)220kV 3.能源按被利用的程度,可以分为(B ) A)一次能源、二次能源 B)常规能源、新能源 C)可再生能源、非再生能源 D)含能体能源、过程性能源 4.能源按获得的方法分,可以分为(A ) A)一次能源、二次能源 B)常规能源、新能源 C)可再生能源、非再生能源 D)含能体能源、过程性能源 5.隔离开关的控制可分为(A ) A)就地控制与远方控制 B)远方控制与电动控制 C)就地控制与液压控制 D)集中控制与电气控制 6.载流导体三相短路时,电动力计算主要考虑工作条件最恶劣的一相,即(D) A)A相 B)B相 C)C相 D)中间相 7.对线路停电的操作顺序是(D ) A.先分母线隔离开关,再分线路隔离开关,最后分断路器 B.先分线路隔离开关,再分母线隔离开关,最后分断路器 C.先分断路器,再分母线隔离开关,最后分线路隔离开关 D.先分断路器,再分线路隔离开关,最后分母线隔离开关 8.关于备用电源,不正确的描述是(D ) A)明备用是指专门设置一台备用变压器(或线路),它的容量应等于它所代替的厂用工作变中容量最小的一台的容量; B)暗备用是指不另设专用的备用变(或线路),而将每台工作变的容量加大; C)备用电源的两种设置方式: 明备用和暗备用;

D)在大型电厂,特别是火电厂,由于每台机组厂用负荷较大,常采用明备用; E)暗备用运行方式下,正常工作时,每台工作变在欠载下运行,当任一台工作变因故被切除后,其厂用负荷由完好的工作变承担。 9.在电流互感器的选择与检验中,不需选择或校验(C) A)额定电压 B)二次负荷 C)机械负荷 D)动稳定 10.在屋内配电装置中,为避免温度变化引起硬母产生危险应力,一般铝母线长度为多少米 时,就应设置一个伸缩节?(B ) A)10~19 B)20~30 C)35~40 D)30~50 11.输电线路送电的正确操作顺序为(C ) A.先合母线隔离开关,再合断路器,最后合线路隔离开关 B.先合断路器,再合母线隔离开关,最后合线路隔离开关 C.先合母线隔离开关,再合线路隔离开关,最后合断路器 D.先合线路隔离开关,再合母线隔离开关,最后合断路器 12.维持电弧稳定燃烧的因素是( C ) A碰撞游离B高电场发射 C热游离 13.交流电弧过零后不再燃烧的条件是( C ) A工频电源电压小于燃弧电压 B 电弧电压小于熄弧电压 C 恢复电压小于介质强度 14.断路器燃弧的时间是(C ) A 断路器接到分闸命令至电弧熄灭的时间 B断路器接到分闸命令至触头分离的时间 C 断路器触头刚分离至电弧熄灭的时间 二、判断题 1.断路器的额定电流是指在任意的环境温度下,当断路器的绝缘和截流部分不超过其长期 工作的最高允许温度时,断路器允许通过的最大电流值。(错) 2.SF6全封闭组合电器是以绝缘油作为绝缘和来弧介质,以优质环氧树脂绝缘子作支撑元 件的成套高压组合电器。(错)

2×100MW发电厂电气部分设计毕业设计

2×100MW发电厂电气部分设计毕业设计 引言 随着高速发展的现代社会,电力工业在国民经济中的作用已为人所共知,它不仅全面的影响国民经济其他部门的发展,同时也极大的影响人民的物质与文化水平的提高,影响整个社会的进步,其中发电厂在电力系统中起着重要的作用.我国正在飞速发展,经济快速的增长使得对电能的需求量在不断提高,各类发电厂的数量随之而增加,特别是火力发电厂依然十分重要。 我本次设计的题目为“2 100MW发电厂电气部分设计”,设计的主要内容为:确定电气主接线图;选择主变压器的型号;对主接线上的短路点进行短路电流计算;设备选型及校验;发电机保护整定计算;防雷接地计算;屋外配置设计。 在佈仁图老师的认真辅导下使我在此次的毕业设计中对发电厂等方面的知识有了更多的了解,真是受益匪浅.

第一章绪论 随着我国经济发展速度的不断加快,特别是伴随西部大开发和振兴东北老工业基地的力度加大,我国的电力需求猛增。为了提高国家电力工业的效益,促进相关工业的技术水平的提高,增加新的经济增长点。近期的重点是:发展大容量、高效低污染的常规火电机组,积极开发洁净煤发电新技术,解决提高燃煤发电机组的效率和改善环境污染两大关键问题;开发水电站老机组的改造技术,提高机组效益和对水利资源的的效利用;加强电网关键技术的开发研究,积极推进跨大区电网互联,优化资源配置,建立有效电力市场体系;大力开发和推广节能降耗技术,加速对中小机组、老机组、城市和农村电网的技术改造,降低损耗,提高效益。 我国电力的发展将朝向“大机组、超高压、大电网、新能源”方向发展。 火力发电中的主要环节是热能的传递和转换,将初参数提高到超临界状态,提高了可用能的品位。使热能转换效率提高,这是大容量火电机组提高效率的主要方向。与同容量亚临界火电机组比较,超临界机组可提高效率2-2.5%,超临界机组可提高效率约5%。大型超临界机组的开发与应用,可以有效的改变我国电力工业目前能耗高和环境污染及依赖进口设备的局面,具有现实的经济、社会效益。 由于空冷电站的耗水量仅为湿冷电站的1/3,适合于我国富煤缺水的“三北”地区建设大型坑口电站,变输煤为输电。对减轻铁路运煤压力、促进“三北”及相邻地区的经济发展具有非常重要的现实意义。 设计为(2 100)MW发电厂电气部分设计,要任务是电气主接线,厂用电设计、短路计算、主要设备的选择和校验、防雷与接地装置设计、发电机保护的整定计算、配电装置设计。技术要求主接线可靠、灵活、经济、便于扩建。所有设计过程均需要考虑国家电力部门的技术规程和规范。

水电站电气一次毕业设计·某水电学院毕业设计

前言 毕业是教学过程中的一个重要环节,通过设计可以巩固本专业理论知识,掌握供配电设计的基本方法,通过解决各种实际问题,培养独立分析和解决实际工程技术问题的能力,同时对电力工业的有关政策、方针、技术规程有一定的了解,在计算、绘图、设计说明书等方面得到训练,为今后的工作奠定基础。本设计根据设计任务书可分为二大部分,第一部分为设计计算书,包括负荷计算、无功功率及补偿计算、短路电流的计算、设备选择及校验计算、配电变压器保护定值计算;第二部分为设计说明书,包括变电所位置和形式选择、变电所主接线设计、变电所主变压器台数和容量、变电所一次设备的选择与校验、变电所高、低压线路设计、变电所二次回路设计及继电保护的整定、防雷和接地装置设计;本设计基于本人掌握的供电知识基础,尚有正确和不完善的地方,敬请老师、同学指正! 第一章毕业设计任务书 1.1设计题目 10KV降压变电所电气设计 1.2设计目的

毕业设计是完成本专业教学计划的最后一个重要的教学环节,是对各门课程的综合运用和提高。通过毕业设计,巩固和加深学生所学专业理论知识,锻炼学生分析和解决实际工程问题能力。培养和提高学生综合使用技术规范、技术资料,进行有关计算、设计、绘图和编写技术文件的初步技能,为今后参加水电站和变电所电气设计、安装、运行、检修、试验打下基础。 通过本毕业设计,初步掌握一个小型水电站工程设计的思想、内容、方法和步骤。 1.3 有关的原始资料 黄坪电站为低水头径流式水电站,座落于茶陵县虎踞镇黄坪村,距茶陵县城25km ,装机容量5×1600 kw ,年利用小时数4833h ,发电机的型号为SF1600-60/4850,发电机额定电压为6.3kv 。电站取大输送功率为8000 kw 。根据茶陵县小水电网络规划和业主意向,电站出线等级为35kv ,共三回路,一回路送到9km 平水变并入茶陵县新组建小水电网,一回路送到近区新建的虎踞镇工业区,一回路备用。其输电导线型号为LGJ-120。 1.4 设计的总体要求 集中布置,明确要求,提倡讨论,独立完成,严禁抄袭,严禁拷贝现象。 第二章 电气一次部分设计 2.1 电气主接线方案的拟定 分析设计原始资料,全面考虑所设计电站在系统中所处地位、所供负荷性质、地理位置以及电站本身的总容量和机组台数,拟出二至三个可行的方案,进行一般的技术经济比较,通过论证,确定一个合理的主接线方案。 ~~~ 方 案 一 电网 工业 备用 ~1 35 6.3 ~

17西安交通大学《发电厂电气部分》(在线作业)

西交《发电厂电气部分》在线作业 一、单选题(共20 道试题,共40 分。) 1. 除发电机外,()是发电厂中最为贵重的大型电气设备。 A. 主变压器; B. 联络变压器; C. 厂用变压器; D. 自用变压器; 正确答案:A 2. 电气设备的动稳定电流应不小于通过该电气设备的最大()。 A. 三相冲击短路电流 B. 冲击短路电流 C. 三相短路电流 D. 持续工作电流 正确答案:A 3. 决定熄弧的基本因素是()。 A. 弧隙介质强度和加在弧隙上的恢复电压 B. 弧隙温度和弧隙恢复电压 C. 弧隙温度和弧隙距离 D. 弧隙距离和加在弧隙上的恢复电压 正确答案:A 4. 对供电距离较远、容量较大的电缆线路,应校验其电压损失ΔU(%),一般应满足()。 A. ΔU(%)≤5% B. ΔU(%)≤10% C. ΔU(%)≤15% D. ΔU(%)≤20% 正确答案:A 5. 电气设备额定电流的选择条件是它的值要大于等于()。 A. 短时最大工作电流 B. 最大持续工作电流 C. 最大短路电流 D. 持续短路电流 正确答案:B 6. 关于导体稳定温升说法正确的是()。 A. 与电流的平方成正比,与导体材料的电阻成反比 B. 与电流的平方成正比,与导体材料的电阻成正比 C. 与电流的平方成反比,与导体材料的电阻成反比 D. 与电流的平方成反比,与导体材料的电阻成正比

7. 发电机运行频率高于额定频率时,发电机的运行效率将()。 A. 上升 B. 下降 C. 不变 D. 根据具体的发电机有不同的结果 正确答案:B 8. 厂用电接线形式,错误的描述是()。 A. 通常都采用单母线分段接线形式,即为提高厂用电系统的供电可靠性,高压厂用母线按锅炉的台数分成若干独立工作段。 B. 同一机炉或在生产过程上相互有关的电动机和其他用电设备应接在同一分段上,同一机炉自用机械有两套互为备用,则应接在不同分段上; C. 全厂公用负荷,不需要设置公用段,分布在不同分段上; D. 低压厂用母线一般也可按锅炉分段,由相应的高压厂用母线供电; 正确答案:C 9. 发电机不对称运行属于()。 A. 故障运行方式 B. 正常运行方式 C. 非正常运行方式 D. 特殊运行方式 正确答案:C 10. 厂用高压变压器的容量选择正确的是()。 A. 厂用高压计算负荷再加上厂用低压计算负荷。 B. 厂用高压计算负荷与上厂用低压计算负荷之和,再加上10%的裕度; C. 厂用高压计算负荷的110%再加上厂用低压计算负荷。 D. 厂用高压计算负荷加上厂用低压计算负荷的110% 正确答案:C 11. 电弧形成之后,维持电弧燃烧所需的游离过程是()。 A. 碰撞游离; B. 热游离; C. 热电子发射; D. 强电场发射; 正确答案:B 12. 如果要求任一组母线发生短路故障均不会影响各支路供电,则应选用()。 A. 双母线接线 B. 双母线分段带旁路接线 C. 多角形接线 D. 二分之三接线 正确答案:D 13. 屋外配电装置特点叙述错误的是()。 A. 与屋内配电装置相比,建设周期短 B. 与屋内配电装置相比,扩建比较方便 C. 相邻设备之间距离较大,便于带电作业 D. 与屋内配电装置相比,占地面积大

110kV变电站电气一次部分课程设计

课程设计任务书 设计题目: 110kV变电站电气 一次部分设计 前言 变电站(Substation)改变电压的场所。是把一些设备组装起来,用以切断或接通、改变或者调整电压。在电力系统中,变电站是输电和配电的集结点。主要作用是进行高底压的变换,一些变电站是将发电站发出的电升压,这样一方面便于远距离输电,第二是为了降低输电时电线上的损耗;还有一些变电站是将高压电降压,经过降压后的电才可接入用户。对于不同的情况,升压和降压的幅度是不同的,所以变电站是很多的,比入说远距离输电时,电压为11千伏,甚至更高,近距离时为1000伏吧,这个电压经

变压器后,变为220伏的生活用电,或变为380伏的工业用电。 随着我国电力工业化的持续迅速发展,对变电站的建设将会提出更高的要求。本文通过对110KV变电站一次系统的设计,其中针对主接线形式选择,母线截面的选择,电缆线路的选择,主变压器型号和台数的确定,保护装置及保护设备的选择方法进行了详细的介绍。其中,电气设备的选择包括断路器、隔离开关、互感器的选择和方法与计算,保护装置包括避雷器和避雷针的选择。其中分析短路电流的计算方法和原因,是为了保证供电的可靠性。 目录 第1章原始资料及其分析 (4) 1原始资料 (4) 2原始资料分析 (6) 第2章负荷分析 (6) 第3章变压器的选择 (8) 第4章电气主接线 (11) 第5章短路电流的计算 (14) 1短路电流计算的目的和条件 (14) 2短路电流的计算步骤和计算结果 (15) 第6章配电装置及电气设备的配置与选择 (18) 1 导体和电气设备选择的一般条件 (18) 2 设备的选择 (19) 结束语 (25)

火电厂电气部分设计

发电厂电气部分课程设计 设计题目火力发电厂电气主接线设计 指导教师 院(系、部) 专业班级 学号 姓名 日期

课程设计标准评分模板课程设计成绩评定表

发电厂电气部分 课程设计任务书 一、设计题目 火力发电厂电气主接线设计 二、设计任务 根据所提供的某火力发电厂原始资料(详见附1),完成以下设计任务: 1. 对原始资料的分析 2. 主接线方案的拟定 3. 方案的经济比较 4. 主接线最终方案的确定 三、设计计划 本课程设计时间为一周,具体安排如下: 第1天:查阅相关材料,熟悉设计任务 第2 ~ 3天:分析原始资料,拟定主接线方案 第4天:方案的经济比较 第5 ~ 6天:绘制主接线方案图,整理设计说明书 第7天:答辩 四、设计要求 1. 设计必须按照设计计划按时完成 2. 设计成果包括设计说明书(模板及格式要求详见附2和附3)一份、主接线方案图(A3)一张 3. 答辩时本人务必到场 指导教师: 教研室主任: 时间:2013年1月13日

设计原始数据及主要内容 一、原始数据 某火力发电厂原始资料如下:装机4台,分别为供热式机组2 ? 50MW(U N = 10.5kV),凝汽式机组2 ? 300MW(U N = 15.75kV),厂用电率6%,机组年利用小时T max = 6500h。 系统规划部门提供的电力负荷及与电力系统连接情况资料如下: (1) 10.5kV电压级最大负荷23.93MW,最小负荷18.93MW,cos?= 0.8,电缆馈线10回; (2) 220kV电压级最大负荷253.93MW,最小负荷203.93MW,cos?= 0.85,架空线5回; (3) 500kV电压级与容量为3500MW的电力系统连接,系统归算到本电厂500kV母线上的电抗标么值x S* = 0.021(基准容量为100MV A),500kV架空线4回,备用线1回。 二、主要内容 1. 对原始资料的分析 2. 主接线方案的拟定 (1) 10kV电压级 (2) 220kV电压级 (3) 500kV电压级 3. 方案的经济比较 (1) 计算一次投资 (2) 计算年运行费 4. 主接线最终方案的确定

发电厂电气一次系统设计-毕业论文

毕业设计(论文) 题目发电厂电气一次系统设计 系别电力工程系 专业班级电气07K1班 学生姓名××× 指导教师梁海平 ××××年六月

发电厂电气一次系统设计 摘要 发电厂是电力系统中生产电能、控制电力的流向和调整电压的电力设施。它通过其变压器将各级电压的电网联系起来,将电能输送出去。 本设计是对一高压侧110kV,2回出线;中压侧35kV,4回出线;低压侧10kV,12回出线的发电厂一次系统进行的初步设计。该发电厂属于小型发电厂,它除承担向系统供应电能的任务外,还提供地区负荷。 本设计首先进行了原始资料的分析。通过分析,了解该发电厂的类型、负荷情况等;然后,再依据发电厂的电压等级、出线数目及其负荷大小,拟定出多种接线方案,再通过初步技术和经济比较,确定一个最优方案;再根据选择主变的原理和所给的该发电厂各电压等级的最大负荷量,确定了主变容量、台数及型号;然后,选择各个短路点,进行短路电流计算,为下面的电气设备选择打下基础;再次,便是根据上述设计成果确定各电气设备,确定配电设备。 最后根据这地区的雷雨情况配置避雷与接地装置及配电装置,完成电气主接线、电气平面布置、防雷与接地图。 关键字:发电厂设计;短路计算;设备选择;防雷保护

A DESIGN OF ELECTRIC MAIN SYSTEM FOR POWER STATION Abstract Power Stations are producing electricity in the power system, controlling the power flow and adjusting the voltage. It will link all levels of voltage power grid through its transformer and will supply power to the transmission system. The tentative design is to the first system of the power station which has high-tension side 110kV, four output connections; middle-tension side 35kV, four output connections, low-tension side 10kV, twelve output connections. The power station belongs to one middle-size station. In addition to assume the supply of power to the power system also to content the region loads. The design has firstly been carried on the analysis of primary source. Passing through the analysis, we can understand the type of this power station, load condition and so on. Secondly, based on the voltage level of power station, load size and the number of outline, we can obtain a wide range of wiring, and then through the preliminary technical comparison, the two options identified. In the light of the principle of choosing main transformer,we can choose the main transformer’s number, capacity and type .Next, selecting each short circuit point and carrying on the calculation of short circuit current, it is the foundation that has been conquered in the selection of the electric installation of next. Then, based on the above results of designed we can determine the electrical equipment, through the economically optimal choosing the best plan and determining the distributed equipments of the power base on the design achievement mentioned above. According to the situation in this region of the thunderstorm, lightning protection and grounding device are configured. The final completion of the main electrical wiring, the electrical layout, lightning protection and access map are draw. Keywords: Power station design; Short current calculation; Equipment selection; Lightning Resistant protection; Distribution devic

发电厂电气部分2019第1学期作业【答案】

《发电厂电气部分》作业 一.单项选择题 1.下面所述的电压等级,是指特高压交流输电线路的电压等级(D) A)330kV;B)±500kV;C)±800kV;D)1000kV;E)220kV 2.下面所述的电压等级,是指特高压直流输电线路的电压等级(C) A)330kV;B)±500kV;C)±800kV;D)1000kV;E)220kV 3.能源按被利用的程度,可以分为(B) A)一次能源、二次能源 B)可再生能源、非再生能源 C)常规能源、新能源 D)含能体能源、过程性能源 4.能源按获得的方法分,可以分为(A) A)一次能源、二次能源 B)可再生能源、非再生能源 C)常规能源、新能源 D)含能体能源、过程性能源 5.隔离开关的控制可分为(A) A)就地控制与远方控制 B)远方控制与电动控制 C)就地控制与液压控制 D)集中控制与电气控制 6.载流导体三相短路时,电动力计算主要考虑工作条件最恶劣的一相,即(D) A)A相 B)B相 C)中间相 D)C相 7.对线路停电的操作顺序是(D) A.先分母线隔离开关,再分线路隔离开关,最后分断路器 B.先分线路隔离开关,再分母线隔离开关,最后分断路器 C.先分断路器,再分母线隔离开关,最后分线路隔离开关 D.先分断路器,再分线路隔离开关,最后分母线隔离开关 8.关于备用电源,不正确的描述是(D) A)明备用是指专门设置一台备用变压器(或线路),它的容量应等于它所代替的厂用工作变中容量最小的一台的容量; B)暗备用是指不另设专用的备用变(或线路),而将每台工作变的容量加大; C)备用电源的两种设置方式:明备用和暗备用;

D)在大型电厂,特别是火电厂,由于每台机组厂用负荷较大,常采用明备用; E)暗备用运行方式下,正常工作时,每台工作变在欠载下运行,当任一台工作变因故被切除后,其厂用负荷由完好的工作变承担。 9.在电流互感器的选择与检验中,不需选择或校验(C) A)额定电压 B)二次负荷 C)机械负荷 D)动稳定 10.在屋内配电装置中,为避免温度变化引起硬母产生危险应力,一般铝母线长度为多少米 时,就应设置一个伸缩节?(B) A)10~19 B)20~30 C)35~40 D)30~50 11.输电线路送电的正确操作顺序为(C) A.先合母线隔离开关,再合断路器,最后合线路隔离开关 B.先合断路器,再合母线隔离开关,最后合线路隔离开关 C.先合母线隔离开关,再合线路隔离开关,最后合断路器 D.先合线路隔离开关,再合母线隔离开关,最后合断路器 12.维持电弧稳定燃烧的因素是(C) A碰撞游离B高电场发射 C热游离 13.交流电弧过零后不再燃烧的条件是(C) A工频电源电压小于燃弧电压B电弧电压小于熄弧电压 C恢复电压小于介质强度 14.断路器燃弧的时间是(C) A断路器接到分闸命令至电弧熄灭的时间 B断路器接到分闸命令至触头分离的时间 C断路器触头刚分离至电弧熄灭的时间 二、判断题 1.断路器的额定电流是指在任意的环境温度下,当断路器的绝缘和截流部分不超过其长期 工作的最高允许温度时,断路器允许通过的最大电流值。(错) 2.SF6全封闭组合电器是以绝缘油作为绝缘和来弧介质,以优质环氧树脂绝缘子作支撑元 件的成套高压组合电器。(错)

发电厂电气部分设计

2006-12-26 20:38:11 第一节原始资料 一、题目:200MW地区凝汽式火力发电厂电气部分设计 二、设计原始资料 1、设计原始资料: 1)某地区根据电力系统的发展规划,拟在该地区新建一座装机容量为 200MW的凝汽式火力发电厂,发电厂安装2台50MW机组,1台100MW机组,发电机端电压为10.5KV,电厂建成後以10KV电压供给本地区负荷,其中有机械厂、钢厂、棉纺厂等,最大负荷48MW,最小负荷为24MW,最大负荷利用小时数为4200小时,全部用电缆供电,每回负荷不等,但平均在4MW左右,送电距离为3-6KM,并以110KV电压供给附近的化肥厂和煤矿用电,其最大负荷为58MW,最小负荷为32MW,最大负荷利用小时数为4500小时,要求剩余功率全部送入220KV系统,负荷中Ⅰ类负荷比例为30%,Ⅱ类负荷为40%,Ⅲ类负荷为30%。 2)计划安装两台50MW的汽轮发电机组,型号为QFQ-50-2,功率因数为0.8,安装顺序为#1、#2机;安装一台100MW的起轮发电机组,型号为TQN-100-2,功率因数为0.85,安装顺序为#3机;厂用电率为6%,,机组年利用小时 Tmax=5800。 3)按负荷供电可靠性要求及线路传输能力已确定各级电压出现列于下表:10KV 110KV 220KV 名称 回路数 名称 回路数 名称 回路数 机械厂 2 化肥厂 2 系统 2

钢厂 4 煤矿 2 棉纺厂 2 市区 4 预留 2 预留 2 预留 1 合计 14 合计 6 合计 3 4)本厂与系统的简单联系如下图所示: 220KV 系统 220KV 新建电厂110KV 10KV 5)计算短路电流资料: 220KV电压级与容量为2000MW的电力系统相连,以100MVA为基数值归算到本厂220KV母线上阻抗为0.048,系统功率因数为0.85。 6)厂址条件:厂址位于江边,水源充足,周围地势平坦,具有铁路与外相连。 7)气象条件:绝对最高温度为400C;最高月平均温度为260C;年平均温

发电厂电气一次系统设计_本科毕业设计(论文)

毕业设计论文 发电厂电气一次系统设计 摘要 由发电、变电、输电、配电和用电等环节组成的电能生产与消费系统。它的功能是将自然界的一次能源通过发电动力装置转化成电能,再经输、变电系统及配电系统将电能供应到各负荷中心。 电气主接线是发电厂、变电所电气设计的首要部分,也是构成电力系统的重要环节。主接线的确定对电力系统整体及发电厂、变电所本身的运行的可靠性、灵活性和经济性密切相关。并且对电气设备选择、配电装置配置、继电保护和控制方式的拟定有较大的影响。电能的使用已经渗透到社会、经济、生活的各个领域,而在我国电源结构中火电设备容量占总装机容量的75%。本文是对配有六台50MW汽轮发电机的大型火电厂一次部分的初步设计,主要完成了电气主接线的设计。包括电气主接线的形式的比较、选择;主变压器、启动/备用变压器和高压厂用变压器容量计算、台数和型号的选择;短路电流计算和高压电气设备的选择与校验; 并作了防雷与接地。 关键词:变压器;发电厂;电力系统;一次设计;电气设备

目录 摘要...................................................................... I 1前言 (1) 2 电气主接线设计 (2) 2.1 主接线的设计原则 (2) 2.2 主接线设计的基本要求 (2) 2.2.1 主接线可靠性的要求 (2) 2.2.2主接线灵活性的要求 (2) 2.2.3 主接线经济性的要求 (3) 2.3 电气主接线的选择和比较 (3) 2.3.1 主接线方案的拟定 (3) 2.3.2 主接线各方案的讨论比较 (6) 2.3.3 主接线方案的初步选择 (6) 3 主变压器的选择 (7) 3.1 变压器的确定原则 (7) 3.2 方案一变压器的选择..................................... 错误!未定义书签。 3.3 方案四变压器的选择..................................... 错误!未定义书签。 4 短路电流计算书........................................... 错误!未定义书签。 4.1 短路电流计算的目的..................................... 错误!未定义书签。 5 方案1主要电气设备的选择 (8) 5.1 各回路最大持续工作电流一览表........................... 错误!未定义书签。 6 方案4主要电气设备的选择 (10) 6.2断路器的选择及校验..................................... 错误!未定义书签。 7 主接线方案的经济比较 (10) 7.1 方案1与方案4的综合投资 (10) 8 其他电气设备的选择 (11) 8.1 电流互感器的选择及校验 (11)

推荐-110kV变电站电气一次部分初步设计说明书 精品

重庆电力高等专科学校 重庆教培中心教学点 毕业专业:电力系统自动化

内容提要 根据设计任务书的要求,本次设计为110kV变电站电气一次部分初步设计,并绘制电气主接线图及其他图纸。该变电站设有两台主变压器,站内主接线分为110kV、35kV和10kV三个电压等级。各个电压等级分别采用单母线分段接线、单母线分段带旁母线和单母线分段接线。 本次设计中进行了电气主接线的设计。电路电流计算、主要电气设备选择及效验(包括断路器、隔离开关、电流互感器、母线等)、各电压等级配电装置设计及防雷保护的配置。 本设计以《电力工程专业指南》、《电力工程电气设备手册》、《高电压技术》、《电气简图用图形符号(GB/T4728.13)》、《电力工程设计手册》、《城乡电网建设改造设备使用手册》等规范规程为依据,设计的内容符合国家有关经济技术政策,所选设备全部为国家推荐的新型产品,技术先进、运行可靠、经济合理。

目录前言 第一部分110kV变电站电气一次部分设计说明书第1章原始资料 第2章电气主接线设计 第2.1节主接线的设计原则和要求 第2.2节主接线的设计步聚 第2.3节本变电站电气接线设计 第3章变压器选择 第3.1节主变压器选择 第3.2节站用变压器选择 第4章短路电流计算 第4.1节短路电流计算的目的 第4.2节短路电流计算的一般规定 第4.3节短路电流计算的步聚 第4.4节短路电流计算结果 第5章高压电器设备选择 第5.1节电器选择的一般条件 第5.2节高压断路器的选择 第5.3节隔离开关的选择 第5.4节电流互感器的选择 第5.5节电压互感器的选择 第5.6节高压熔断器的选择 第6章配电装置设计 第7章防雷保护设计 第二部分110kV变电站电气一次部分设计计算书第1章负荷计算 第1.1节主变压器负荷计算 第1.2节站用变压器负荷计算 第2章短路电流计算 第2.1节三相短路电流计算 第2.2节站用变压器低压侧短路电流计算第3章线路及变压器最大长期工作电流计算第3.1节线路最大长期工作电流计算 第3.2节主变进线最大长期工作电流计算第4章电气设备选择及效验 第4.1节高压断路器选择及效验 第4.2节隔离开关选择及效验 第4.3节电流互感器选择及效验 第4.4节电压互感器选择及效验 第4.5节熔断器选择及效验 第4.6节母线选择及效验 第5章防雷保护计算 第三部分110KV变电站电气一次部分设计图纸电气主接线图

变电站电气一次部分毕业设计

变电站电气一次部分毕业设计

毕业设计(论文) 课题名称220kV变电站电气一次部分初步设计 学生姓名 学号 系、专业电气工程系、电气工程及其自动化 指导教师 职称

内容提要 本次设计为220kV变电站电气一次部分的初步设计。根据原始资料,以设计任务书和国家及行业有关电力工程设计的规程规范为设计依据,并结合该地区实际情况设计该变电站,设计的内容符合国家有关经济技术政策,所选设备全部为国家推荐的新型产品,技术先进、运行可靠、经济合理。本期该变电站设有两台主变压器,远期该变电站设有三台主变压器。站内主接线分为220kV、110kV和10kV三个电压等级。 设计正文分设计说明书和设计计算书两个部分,设计说明书包括电气主接线设计、变压器选择说明、短路电流计算说明、电气设备选择说明、配电装置设计、电气总平面布置和防雷保护设计;设计计算书包括变压器选择、短路电流计算、电气设备选择及校验等,并附有电气主接线图及其它相关图纸。 关键词:220kV变电站;短路计算;主接线;设备选择。

Summary The design of 220 kV substation electrical part of the preliminary design at a time. According to the original data, a design specification and country and industry relevant power engineering design procedure specification for design basis, and combined with the region's actual condition, the design of the substation design in conformity with the relevant economic and technological policies of the state, the contents of the selected equipment for all countries recommend new products, advanced technology, reliable operation, economic and reasonable.. The substation is equipped with two sets of the main transformer, forward the has three main transformer substation. station connection is divided into 220 kV, 110 kV and 10 kV voltage grade three. This text points design specifications and design calculation of two parts, the design specifications, including the main electrical wiring design of transformer selection, the short circuit current calculation, electrical equipment selection, design of power distribution equipment, electrical total plane layout and lightning protection design; Design calculation includes the choice of transformer, the short-circuit current calculation, electrical equipment selection and calibration, etc., with the main electrical wiring diagram and related drawings. Key words: 220 kV substation; Short circuit calculation; The main wiring; Equipment selection.

火力发电厂电气部分设计

毕业设计论文 论文题目:300MW机组火力发电厂电气部分设计

摘要 由发电、变电、输电、配电用电等环节组成的电能生产与消费系统它的功能是将自然界的一次能源通过发电动力装置转化成电能,再经过输、变电系统及配电系统将电能供应到各负荷中心。 电气主接线反映了发电机、变压器、线路、断路器和隔离开关等有关电气设备的数量、各回路中电气设备的连接关系及发电机、变压器与输电线路、负荷间以怎样的方式连接,直接关系到电力系统的可靠性、灵活性和安全性,直接影响发电厂、变电所电气设备的选择,配电装置的布置,保护与控制方式选择和检修的安全与方便性。而且电能的使用已经渗透到社会、经济、生活的各个领域,而在我国电源结构中火电设备容量占总装机容量的75%。本次设计是针对一台300MW机组火力发电厂电气部分的设计。在本次毕业论文设计当中介绍了有关发电厂的一些电气设备如发电机、变压器、断路器、电压互感器、电流互感器和电动机等以及介绍了主变的选择和短路电流的计算条件,最后介绍防雷的重要性以及防雷的有效措施。因此,我们在电厂以后的工作当中一定要时刻保持安全和认真的态度。 本文对发电厂的主要一次设备进行了选择,并根据短路电流计算,通过电器设备的短路动稳定、热稳定性对主要设备进行了校验。在主接线设计中,我们把两种接线方式在经济性,灵活性,可靠性三个方面进行比较,最后选择双母线接线方式。 关键词:电气设备,发电机,变压器,电力系统, ABSTRACT By power、generation、substation,、transmission and distribution of electricity, electricity production and consumption system, its functio n is the nature of primary energy into electricity by electric power equipment, after losing, substation and power distribution system will be power supply to the load center. Reflects the main electrical wiring generators, transformers, lines, the number of circuit breaker and isolating switch and related electrical equipment, electrical equipment in each circuit connection relationship and generator, transformer and transmission lines, in which way the load between connections, is directly related to reli ability, flexibility and security of power system, directly affect the choice of the electrical