九甸峡水利枢纽工程原型观测设计及观测成果初步分析

九甸峡水利枢纽工程原型观测设计及观测成果初步分析
九甸峡水利枢纽工程原型观测设计及观测成果初步分析

九甸峡水利枢纽工程原型观测设计

及观测成果初步分析

闫小淇,张世杰,吕乃兵

(甘肃电投九甸峡水电开发有限责任公司,甘肃临洮730500)

摘要:深覆盖层面板堆石坝监测一直是国内外1=程界至今尚未解决的难题。结合九甸峡水利枢纽深覆盖层面板堆石坝监测的实施,以及对监测成果的分析,提出合理解决深覆盖层面板堆石坝监测难题的有效方法,可为深覆盖层丽板堆石坝监测提供借鉴。.

关键词:面板堆石坝;深覆盖层;原型观测;九甸峡水利枢纽工程

Pr ot ot ype M oni t or i ng D e s i gn and P r el i m i nar y A n al y si s f or Jl udi anxi a W at er Pr oj ect’

Y ah X i粕qi,Z hang Shij i e,Lu N a i b i ng

(Gans u El ect ri c Pow er I nv est m e nt Ji udi anxi a H ydr opow er D evel opm e nt C o.,l ad.,Li nt a o G a m u730500)

A bs t r act:ne m oni t or i ng f or f ace r o c k f f ll da m f ounded o n deep over bur de n has no t yet be en s ol ved a t do m est i c a nd a b r oad.The m oni t or i ng f or Ji udi anxi a C F R D w a s i nt r o duced a nd t he dat a w er e pr el im i nar i l y an al yz ed.T he s ys t em at i c m oni t or i ng m et he ds f or f ace roc kfi l l da m f ounde d o n de e p ov er bu r de n a糟suggest ed.and c a n be a s r ef er enc e f or s i m i l ar pr oj ect s.

K e y

W or ds:fac e roc kfi l l dam;deep over bur den;p r ot ot yp e m om m f i ng;Ji udi anxi a W a t e r Pr oj ect

中图分类号:'r v698.1(242)文献标识码:A文章编号:0559-9342(2010)1l—0087埘

1工程概况

九旬峡水利枢纽工程大坝地震设防烈度为8度,最大坝高133m,坝址区左岸岸坡陡峻近似直立,右岸发育有=乏级阶地,坝基分布深厚覆盖层。是目前我国在覆盖层上修建的最高的混凝土面板堆石坝。大坝按l级建筑物设计,安全监测相应按1级建筑物标准设计。

枢纽工程安全监测系统主要包括:①混凝土面板堆石坝监测。包括坝体表面及内部位移监测、变形监测和渗流监测。混凝土面板应力、应变、挠度监测,面板缝、周边缝监测,面板与垫层间的脱空监测,趾板基础渗流监测,防渗墙挠度及渗流监测等项目,其中,以基础及坝体变形、防渗墙应力应变、坝基渗流监测为主,面板应力应变和周边缝变形监测为辅;②泄洪洞进口高边坡及洞身典型断面应力应变监测;③溢洪洞进口高边坡及洞身典型断面应力应变监测;④引水发电洞洞身典型断面应力应变监测,调压井及压力管道应力应变监测;⑤厂房高边坡及厂基应力应变、渗流等监测。

观测频率执行L S6卜94《土石坝安全监测技术规范》的规定,并根据现场实际,对出现特殊情况或异常值的部位加密观测。

2监测项目设置

2。1混凝土面板堆石坝

(1)大坝河床部位。在河床覆盖层建基面顺河向埋设了8支渗压计、8支土压力计,埋设位置基本接近.埋设高程在2072.39-2082.82m之间。埋设4组水平测斜仪,坝后设置一梯形量水堰,以观测渗流量。

(2)大坝乎趾板、连接板。共埋设5支渗压计、6支土压力计和6组钢筋计。

(3)大坝防渗墙。共埋设24组钢筋计、3支渗压计、2组测斜仪。

(4)大坝坝体。根据大坝河床、左岸岸坡、右

收穑日期:2010--09-26

作者简介:固小淇(197卜)。男,河南林州人,高级工程师,主要从事工程建设管理工作.一

W at er Pow e r V01.36No.11固

水利水电工程勘察设计问题及措施

水利水电工程勘察设计问题及措施 随着我国改革开放的不断深入,水利水电工程建设对我国社会的发展有着越来越重要的影响,因此做好水利水电工程勘察不但是水利水电工程的基础部分,同时也是最重要的部分。但是在实际的工程勘察设计中,很多时候会忽视对水利水电工程的勘察,导致很多问题没有被发现,严重影响了工程项目的耐久性和使用寿命。因此,工程人员一定要重视对水利水电工程的勘察,认识到勘察工作与工程之间的密切关系,使用各种测绘技术,提高工程勘察和设计水平,从而提高整个工程建设的质量。 一、水利水电工程的勘察 水利水电工程勘察主要是对工程建设的地质、地层和水文情况进行了解的过程。在水利水电勘察过程中,对勘察人员的专业知识和技能都有一定的要求,而且勘察过程也有一定的难度,首先要对地质学有所了解,还要掌握测绘技术,完成对水利水电工程勘察项目的勘测,并将勘测得到的数据展示出来,为施工方案的确定提供参考。随着我国经济建设的不断发展,越来越多的水利水电工程随之出现,由于水利水电工程易受外界地质因素的影响,尤其是地质条件较差的地区会严重影响工程的建设和质量,因此在工程勘察阶段,就要对工程周围的水文情况进行详细的调查,明确调查的指标,尤其是要对地下水的类型、地下水位、排泄条件以及其变化规律进行详细的了解,为工程项目施工提供数据支持。除此之外,对于其他可能会涉及到基坑的工程,还要在勘察阶段进行抽水和压水的试验,了解土层的渗透性,分析对工程项目的潜在威胁,并有针对性的制定施工方案。

二、水利水电工程勘察设计存在的问题 (一)勘察技术精确度较差 水利水电工程勘察设计是一项技术性极强的工作,一定要按照水 利水电工程的勘察设计要求进行勘察和测绘,但是在实际勘察工作中,很多勘察人员的技术水平不足,而且由于水利水电工程相对隐蔽,加大了勘察难度。使用落后的技术,再加上恶劣的勘察环境,导致在勘察过程中会影响勘察的精确度,得不到精确的数据,从而给水利水电工程的施工造成了干扰。 (二)工程设计较为盲目 在水利水电工程项目建设中,一些设计人员在设计的过程中过于盲目,有的设计人员在没有充分了解实际情况的基础上就凭借以往的经验进行设计,还有的设计人员过于依赖工程勘察的结果,对于其中一些不合理的地方没有进一步的研究,在设计方案形成之后也没有对方案进行进一步的比较和论证,确定了基本的可行性就完成了任务,忽略了因地制宜的原则,很多地方都考虑不周,很可能存在资源浪费、缺乏经济性、影响工程质量的隐患。 (三)勘察力度不够充分 水利水电工程勘察设计工作需要按照步骤循序渐进,不断深化和细化。需要对工程结构图、工程量、工程费用和工程基础资料作为支撑,但是在实际勘察中,勘察力度不够充分,在没有完成全面勘察、

龙林水库水利枢纽设计

本科论文 龙林水库水利枢纽设计

目录 1 设计基本资料 (4) 1.1 自然地理与水文气候特性 (4) 1.2 工程地质情况 (7) 1.3 建筑材料 (9) 2 工程等别及建筑物级别 (11) 3 洪水调节计算 (12) 3.1 设计洪水与校核洪水 (12) 3.2 拟定水库的重复利用库容 (13) 3.3调洪演算与方案选择 (14) 3.4 依据调洪演算成果修订溢流堰的尺寸 (15) 3.5 依据上述成果确定特征水位和特征高程 (15) 4 坝型选择及枢纽布置 (16) 4.1 坝址及坝型选择 (16) 4.2 枢纽组成建筑物 (16) 4.3 枢组总体布置. (17) 5 大坝设计 (18) 5.1土石坝坝型选择 (18) 5.2大坝轮廓尺寸的拟定 (18) 6、渗流计算 (20) 6.1 计算方法 (20) 6.2 渗透变形演算 (21) 7、稳定分析计算 (22) 7.1计算方法 (22) 7.2计算方法 (24) 8 基础处理 (25) 8.1 河床部分 (25) 8.2 坝肩处理 (25) 9 细部构造设计 (25) 9.1 坝的防渗体、排水设备 (25) 9.2 反滤层、过滤垫层及过渡层设计 (26) 9.3 护坡设计 (26) 9.4 坝顶布置 (26) 9.5 马道及排水沟设计 (26)

9.6 排水棱体设计 (27) 10 输水建筑物设计 (28) 10.1 隧洞选线与布置 (28) 10.2隧洞的体型设计 (28) 10.3隧洞的细部构造 (31) 10.3.1洞身衬砌 (31) 11泄水建筑物设计 (33) 11.1 溢洪道选线与布置 (33) 11.2溢洪道的体型设计 (33) 14 参考文献篇目 (41) 15 致 (42)

挡水坝毕业设计

挡水坝毕业设计 篇一:混凝土坝毕业设计 摘要 本次设计内容为潘家口水利枢纽,坝型选择为混凝土重力坝。 重力坝主要有非溢流挡水坝段、溢流表孔坝段、溢流底孔坝段和电站厂房坝段组成。挡水坝段最大断面的坝底高程为122.0m,坝顶高程为227.8m,防浪墙高1.2m,最大坝高为105.8m,属高坝类型。坝顶宽9m,最优断面的上游坝坡坡率为1:0.2,上游折坡点高程为182.0m,下游坝坡坡率为1:0.7,下游折坡点高程214.9m。 溢流坝段布置在主河道中心,止水采用两道紫铜中间加沥青井的形式。坝基防渗处理(主要依据上堵下排的原则),上游帷幕灌浆(两道),下游侧设置排水管。 以非溢流挡水坝段为计算选择断面,进行了抗滑稳定分析和应力分析,分别采用单一安全系数法和可靠度理论法计算法进行计算,最终验算满足抗滑稳定,上游坝踵没有出现拉应力,设计剖面合理可行 设计中认真总结,运用几年来所学的理论知识及专业知识,结合毕业设计的任务进行思考、分析应用,提高了独立思考与独立工作的能力,同时也加强了计算、绘图、编写设

计文件、使用规范、手册能力的培养,使我们成为合格的水利人才。 关键词:非溢流坝;细部构造;地基处理 Abstract This design content for the Panjiakou project, dam type selection for the concrete gravity dam. A gravity dam are mainly non overflow dam section of spillway dam, spillway, bottom hole dam and powerhouse dam section of. Non overflow dam section of each of15 meters wide, distributed in the dam powerhouse dam section ends; each16 meters wide, disposed near the right bank main riverbed, outfit machine 3units; the bottom orifice of each section of22 meters wide, arranged in a powerhouse left main riverbed; overflow section of each segment width 18meters, is arranged in the house music river main river bed. Dam section of maximum cross section of the bottom surface elevation of 122.0 meters, at elevation of 227.8 meters,1.2 meters high wall, the dam height of 105.8 meters, is a type of dam. Crest width of 9 meters, the optimal section of the upstream dam slope rate of

水利、水电行业工程勘察设计资格分级标准讲解

水利、水电行业工程勘察设计资格分级标准 状态:有效发布日期:1992-07-01 生效日期: 1992-07-01 发布部门: 能源部、水利部 发布文号: 基设[1992]72号|建开[1992]5号 (一)水利、水电行业工程设计资格分级标准 一、总则 (一)根据建设部(1991)504号文印发的《工程勘察和工程设计单位资格管理办法》,结合水利、水电行业的实际情况制定本标准。 (二)工程设计①(注①:水利、水电行业工程设计包括可行性研究阶段。)范围主要包括: 水利行业 (1)流域或区域综合利用规划,防洪,治涝、灌溉、供水、水土保持等专业规划; (2)综合利用水利枢纽及水库工程; (3)堤防及河道整治工程: (4)灌溉及排涝工程; (5)引、调、供水工程 (6)水土保持工程; (7)其他水工程。 以及上述工程的配套工程的设计,主要有:通航、过木、过鱼等过坝或交叉建筑物的设计,水电站等设计及水库淹没迁移城镇规划。 水电行业 (1)河流规划、规划选点、水电开发规划; (2)水电站(含抽水蓄能电站、潮汐电站)设计;

(3)以发电为主的综合利用枢纽工程设计; 以及上述工程的配套工程的设计,主要有通航、过木、过鱼等过坝或交叉建筑物设计。 (三)水利、水电工程设计资格划分为甲、乙、丙、丁四级。 二、分及标准 (一)甲级: 1.资历:具有10年以上水利或水电工程设计资历(重新恢复的设计单位资历按原成立时间计算)。社会信誉好。独立承担过至少两项大型水利或水电工程①(注①:大、中小型工程规模与表三、表四承担工程设计规模相对应。)设计任务,并已开工或建成投产,开工项 目设计质量优秀,投产项目经运行考验,安全可靠,达到设计主要的技术经济指标,效益显著。 2.技术力量:技术力量雄厚,专业配备齐全,有同时承担两项大型水利或水电工程设 计任务的技术力量,并配备有相应的科研和地质人员,能独立承担难度大的规划和工程设计,有完成国内先进水平的设计和研究开发新技术的能力。 技术力量详见表一、表二。 3.技术水平:具有本行业的技术专长和计算机软件开发能力,设计水平为国内先进, 是水利或水电行业中的骨干设计院。在近十年内至少有一项工程获得过国家或省、部级优秀工程设计奖或至少获得二项国家或省、部级科技进步奖。参加过国家和部门、地方工程建设标准规范的编制工作。 4.技术装备:达到国家规定Ⅰ级设计单位技术装备及应用水平现阶段的考核标准。 5.管理水平:全面质量管理达标验收取得合格证书。建立了一套有效的全面质量管理体系和标准体系。以质量为主体目标管理有实效。 (二)乙级: 1.资历:社会信誉好。独立承担过至少两项中型水利或水电工程设计任务,并已开工 或建成投产,开工项目设计质量好,投产项目经运行考验,安全可靠,达到设计主要的技术经济指标,效益较好。 2.技术力量:技术力量强,专业配备齐全,有同时承担两项中型水利或水电工程设计

水利枢纽与水工建筑物设计计算书

目录 第一章工程规模的确定....................................................... - 3 - 1.1 水利枢纽与水工建筑物的等级划分..................................... - 3 - 1.2 永久建筑物洪水标准................................................. - 3 -第二章调洪演算 ............................................................ - 4 - 2.1洪水调节计算....................................................... - 4 - 2.1.1 洪水调节计算方法........................................................ - 4 - 2.1.2 洪水调节具体计算........................................................ - 4 - 2.1.3 计算结果统计:.......................................................... - 8 -第三章大坝设计 ............................................................. - 9 - 3.1 坝顶高确定 ........................................................ - 9 - 3.1.1 计算方法................................................................ - 9 - 3.1.2 计算过程................................................................ - 9 - 3.2 坝顶宽度 ......................................................... - 10 - 3.3 开挖线的确定...................................................... - 10 - 3.4 非溢流坝剖面设计.................................................. - 10 - 3.4.1 折坡点高程拟定......................................................... - 11 - 3.4.2 非溢流坝剖面拟定....................................................... - 11 - 3.5 非溢流坝段坝体强度和稳定承载能力极限状态验算...................... - 17 - 3.5.1 荷载计算成果........................................................... - 17 - 3.5.2正常蓄水位时坝体沿坝基面的抗滑稳定性及强度验算.......................... - 35 - 3.5.3正常蓄水位时坝体2-2面的抗滑稳定性及强度验算............................ - 36 - 3.5.4正常蓄水位时坝体3-3面的抗滑稳定性及强度验算............................ - 36 - 3.5.5正常蓄水位时坝体4-4面的抗滑稳定性及强度验算............................ - 38 - 3.5.6校核洪水位时坝体沿坝基面的抗滑稳定性及强度验算.......................... - 40 - 3.5.7校核洪水位时坝体2-2面的抗滑稳定性及强度验算............................ - 40 - 3.5.8校核洪水位时坝体3-3面的抗滑稳定性及强度验算............................ - 41 - 3.5.9校核洪水位时坝体4-4面的抗滑稳定性及强度验算............................ - 42 - 3.5.10正常蓄水位地震时坝体沿坝基面的抗滑稳定性及强度验算..................... - 45 - 3.5.11正常蓄水位地震时坝体2-2面的抗滑稳定性及强度验算....................... - 46 - 3.5.12正常蓄水位地震时坝体3-3面的抗滑稳定性及强度验算....................... - 46 - 3.5.13正常蓄水位地震时坝体4-4面的抗滑稳定性及强度验算....................... - 49 - 3.5.14设计水位时坝体沿坝基面的抗滑稳定性及强度验算........................... - 50 - 3.5.15设计水位时坝体2-2面的抗滑稳定性及强度验算............................. - 51 - 3.5.16设计水位时坝体3-3面的抗滑稳定性及强度验算............................. - 51 - 3.5.17设计水位时坝体4-4面的抗滑稳定性及强度验算............................. - 54 - 3.6 应力计算 ......................................................... - 55 - 3.6.1 边缘应力............................................................... - 55 - 3.6.2内部应力............................................................... - 55 - 3.6.3 截面应力计算表......................................................... - 58 - 3.6.4 应力图................................................................. - 70 - 3.7 溢流坝段的设计.................................................... - 71 -

水利水电工程毕业设计

西安理工大学毕业设计(论文) 题目铜钱坝碾压混凝土坝枢纽 布置及变形监测设计 专业水利水电工程 班级工(卓)101班 学生 指导教师 2014

铜钱坝碾压混凝土坝枢纽布置及 变形监测设计 摘要 铜钱坝水库坝址位于汉江支流玉带河下游,该水库是以供某工厂工业用水为主,兼补偿下游农田灌溉用水,以及防洪、发电、养鱼等综合利用水利枢纽工程。本次毕业设计分析了坝址的地形和地质条件,对比几种坝型最终选取常态混凝土重力坝和坝轴线并进行了枢纽布置。枢纽建筑物包括泄水建筑物、挡水大坝、底孔、供水管道和电站等。然后对该工程的溢流坝及底孔的形式和消能及防冲进行了设计。坝体剖面的稳定和应力计算,荷载组合取了基本组合和特殊组合两种不同的情况,以正常蓄水位时的荷载组合作为基本组合;以校核荷载和地震荷载作为特殊组合。设计中选取了坝基面和廊道底部截面作为计算截面,对坝体的两种稳定和强度都进行了计算,结果都满足要求。本次设计的主要成果有:设计说明书1份,设计图纸9张以及其他相关附图附表等。 关键词:碾压混凝土重力坝;溢流坝;底孔;设计。

Tong Qian dam water conservancy hub project layout and Water discharge building design ABSTRACT Tong Qian dam located in hanjiang river dam site tributary jade belt linked to the downstream, the reservoir for a factory in industrial water is given priority to, and compensation of farmland irrigation water downstream, and flood control, power generation, fish, and other comprehensive use of water conservancy hub project. The graduation design analysis of the dam site topographical and geological conditions, compared several dam type selection ultimately normal concrete gravity dam and dam axis and the general layout. Hub buildings including outlet structure, Block water dam,underport,Water supply pipe and power stations. Then the spillway and bottom outlet in the form of engineering and the energy dissipation and scour protection design. The stability of the dam profile and stress calculation, the load combination to take the basic combinations and special combination of two different situation, normal water level of the load combination as the basic combination;c hecking loads and seismic loads as special combinations. In the design of the dam foundation and corridor on the surface as the section at the bottom section on the dam two stability and strength are calculated, the result is meet the requirements. The design of the main achievements are: a design specifications, design drawings and other relevant drawings six pictures schedule, etc. Key words: roller compacted concrete gravity dam; Overflow dam; under port; Design.

函江水利枢纽工程毕业设计

河海大学函授本科 毕业设计讲明书 函江水利枢纽工程毕业设计(泄水闸设计)

班级:水利水电班 姓名:X X X 指导老师:王润英 目录 第一章综合讲明 (3) 1.1工程概况 (3) 1.2毕业设计成果(泄水

闸).................................................... (4) 第二章水文.................................. .. .................. .......................................................... . (10) 2.1流域概况....................................................... ......................................................... .. (10) 2.2气象....................................................... ......................................................... . (10) 2.3洪水....................................................... ......................................................... . (10)

第三章工程地形、地质 3.1地形地貌....................................................... ......................................................... .. (12) 3.2闸址地质....................................................... ......................................................... .. (12) 3.3当地建筑材料....................................................... ......................................................... (12) 3.4地震................................................................................ . (13) 第四章工程布置及建筑物................................ ....................... ..........................................................

平山水利枢纽设计说明书

平山水利枢纽设计计算书

学院:水利水电学院 班级:水电5班 姓名:张远金 学号:2011301580349

目录 一、综述 (4) 1.1 工程概况 (4) 1.2 枢纽任务 (4) 1.3 设计基本资料 (4) 二、坝址水文特性 (5) 三、枢纽及库区地形地质条件 (6) 3.1 坝址、库区地形地质及水文地质 (6) 3.2 筑坝材料 (6) 四、枢纽建筑物选型及枢纽总体布置 (7) 4.1工程等级及主要建筑物的级别、洪水标准 (7) 4.2 枢纽建筑物选型 (9) 五、土石坝设计 (11) 5.1 选择土石坝的类型 (11) 5.2 土石坝的剖面设计 (12) 5.5 土石坝的构造设计 (15) 5.3 渗流稳定计算 (17) 5.4 坝坡稳定分析计算 (20) 5.6地基处理及与岸坡连接 (24) 六、正槽溢洪道设计 (25) 6.1 正槽式溢洪道的位置选择 (25) 6.2 溢洪道的孔口尺寸确定 (25) 6.3 溢洪道泄槽设计 (28) 6.4 溢洪道消能设计 (32) 6.5 溢洪道细部结构设计 (34)

一、综述 1.1 工程概况 平山水库位于湖北省某县平山河中游,该河系睦水的主要支流,全长284公里,流域面积为556平方公里,坝址以上控制流域面积为491平方公里;平山河是山区性河流,河床比降3‰,沿河道有地势比较平坦的小平原,地势自南向东由高变低。最低高程为62.5左右。 1.2 枢纽任务 该枢纽以灌溉发电为主,并结合防洪、航运、养殖、给水等进行开发。 1.3 设计基本资料 1..水库规划资料 (1)正常蓄水位:113.0m (2)设计洪水位:113.1m (百年一遇) (3)校核洪水位:113.5m (千年一遇) (4)死水位:105.0m(发电极限工作深度为8m) (5)灌溉最低库水位:104.0m (6)水库总库容:2.0亿m3 (7)水库有效库容:1.15亿m3 =7.35 m3/s,相应的下游水位63.20m;(8)发电调节保证流量Q p

全国优秀水利水电工程勘测设计奖评选办法

附件1: 全国优秀水利水电工程勘测设计奖评选办法 第一章总则 第一条为推动水利水电行业的技术创新,提高水利水电工程勘测设计水平,引导、鼓励水利水电工程勘测设计单位和专业技术人员创作出更多技术先进、经济和社会效益好、生态环境友好的工程勘测设计成果,根据水利水电行业的实际情况,特制定本办法。 第二条全国优秀水利水电工程勘测设计奖包括优秀水利水电工程勘测奖、优秀水利水电工程设计奖、优秀水利水电工程标准设计奖、优秀水利水电工程勘测设计计算机软件奖。 上述各奖项分设金质奖、银质奖和铜质奖三级。 第三条全国优秀水利水电工程勘测设计奖一般每两年评选一次。 第四条全国优秀水利水电工程勘测设计奖评选工作遵循实事、科学严谨和公开、公平、公正的原则。 第五条中国水利水电勘测设计协会负责全国优秀水利水电工程勘测设计奖的组织、评选工作,以及获奖项目参评全国优秀工程勘察设计奖的推荐工作。

第二章评选的围 第六条全国优秀水利水电工程勘测设计奖评选围包括:水利枢纽、水电站、抽水蓄能电站、河道整治、引调水、灌溉排涝、城市防洪、水土保持、围垦以及水环境水生态等工程项目。 独立的测量项目,水文地质勘察项目,可以申报优秀水利水电工程勘测奖。 规划项目(包括综合规划、专项规划和专业规划等)可申报优秀工程设计奖。 第七条全国优秀水利水电工程建设标准设计奖评选围包括: (一)经国务院有关部门或省、自治区、直辖市水利、水电主管部门审查批准出版的工程建设标准设计。 (二)经相关行业协会审查批准出版的工程标准设计。 第八条全国优秀水利水电工程勘测设计计算机软件奖评选围包括: (一)具有自主知识产权,适用于水利、水电工程勘测设计的国产软件。 (二)引进后经二次开发,适用于水利、水电工程勘测设计的软件或数据库。 第九条涉密项目进行脱密处理,并经主管部门批准后方可申报。

江北河水利枢纽工程设计计算书

南昌工程学院 毕业设计计算书 水利与生态工程学院水利水电工程专业毕业设计题目江北河水利工程枢纽设计(重力坝方案) 学生姓名蒋煌斌 班级12水利水电(8)班 学号2014110004 指导教师周燕红 完成日期二零一六年月日

江北河水利枢纽工程设计(重力坝方案) Jiangbei river water conservancy project design(gravity dam project) 总计毕业设计页 表格个 插图幅

目录 第一章调洪计算 (1) 1.1计算下泄流量........................................................................................................................11.2设计情况调洪计算................................................................................................................31.3校核情况调洪计算................................................................................................................6第二章非溢流坝计算. (4) 2.1基本资料 (4) 2.1.1设计依据....................................................................................................................42.1.2地质地形资料............................................................................................................42.2非溢流坝段剖面尺寸拟定.. (4) 2.2.1防浪墙与两种工况下水位的高差?h (4) 2.2.2设计洪水情况下的设h ?设计算..............................................................................62.2.3校核洪水下的校核h ?计算.. (6) 2.2.4坝顶高程的计算........................................................................................................72.2.5坝顶宽度的确定........................................................................................................72.2.6坝体断面选择............................................................................................................72.2.7坝基防渗、排水设施以及廊道位置、尺寸的拟定............................................82.3荷载计算 (9) 2.3.1坝体基本荷载............................................................................................................92.3.2基本荷载计算..........................................................................................................112.4抗剪断稳定计算..................................................................................................................182.5坝体应力计算. (19) 2.5.1设计水位情况下的应力计算:............................................................................192.5.2校核水位情况下的应力计算:. (20) 第三章溢流坝段计算 (21) 3.1孔口设计 (21) 3.1.1溢流坝单宽流量的确定.........................................................................................213.1.2堰顶高程的确定. (21) 2.1.3的确定与d H H max ...................................................................................................213.2溢流坝断面尺寸的拟定.. (22) 3.2.1曲线段设计..............................................................................................................223.2.2中间直线段计算.....................................................................................................233.2.3反弧段计算..............................................................................................................233.2.4挑流消能水力水舌挑射距离和冲刷坑深度的计算.. (24)

浅谈水利工程勘察设计中几个问题

浅谈水利工程勘察设计中几个问题 【摘要】本文介绍了水利工程地质勘察设计施工过程中存在的几个常见问题,探讨了解决问题的措施。 【关键词】地质勘察;勘察设计;问题处理 引言 近几年,随着我国国民经济的飞速发展,水利项目作为事关国计民生的基础设施项目,投入逐年加大,水利项目无论是数量、还是广度难度都日益增加,对项目的前期策划、论证和决策,从勘测、设计及施工运营都提出了新的要求。水利工程的工作重点之一是勘察设计工作,倘若勘察设计中出现问题,就难以保证整体项目的进度和工程质量。在水利工程实践过程中,由于地质问题引起的工程事故时有发生,轻则修改设计方案,增加投资,延误工期,严重时造成工程失事给人民生命财产带来重大损失。笔者在长期从事水利工程地质勘察工作中,发现并思考了几个常见问题,在此抛砖引玉地几点体会简述如下: 1水利工程勘察设计中存在的主要问题 1.1勘察设计单位资质应严格把关 在水利工程项目管理逐步发展过程中,很多工程放宽了勘察设计单位的资质范围,勘察设计单位正迈向开放型、竞争型、公平型的全新自主发展模式。近年来,水利工程勘察设计单位逐年增多,水利勘察设计市场也日趋活跃。长期以来,我国政府对水利工程察设计单位实行准入制度,但部分地区相关职能部门专业人员相对缺乏,管理工作的相对滞后,最终导致我国部分地区,不同程度地出现了无证、越级承揽勘察设计业务、粗制滥造勘察设计文件等情况,近年来,水利工程勘察设计尤其是中小型工程的勘察设计工作整体质量有所下降,有造成重大工程质量和人员伤亡等事故的隐患。 1.2勘察设计工作缺乏完善的行业管理体制 水利工程勘察设计主要是服务于水利工程、枢纽工程建设的,勘察设计的结果将直接决定水利工程项目的规模、整体建筑形式以及工程项目资金总量等问题,在水利工程前期准备阶段和工程预算工作中占有极为重要的地位和作用。由于缺乏完善的管理体制,水利工程管理部门判断勘察设计结果和方案的准确性、真实性和可行性可能出现偏差,甚至在某些方面影响到水利工程设计图的绘画,最终制约工程项目整体工作的进度和质量。另外,很多勘察设计单位还没有完全建立企业化的管理体系,较大程度上存在着以收入和利润为单一考核衡量指标的现象,缺乏科学、完善的考核评价机制和激励导向,与行业发展相比在管理水平方面还存在较大差距。

桃林口重力坝水利枢纽设计

目录 第1章基本资料 (1) 1.1枢纽概况及工程目的 (1) 1.2设计基本资料 (1) 1.2.1 水文分析 (1) 1.2.2 气象条件 (5) 1.2.3 工程地质 (5) 1.2.4 当地建筑材料 (7) 1.2.5 交通条件 (8) 1.2.6 施工条件 (8) 1.2.7 效益(以1984年价格水平及费用标准计算) (8) 第2章枢纽布置 (11) 2.1坝轴线选择 (11) 2.1.1 坝段比较 (11) 2.1.2 坝线选择 (12) 2.2坝型选择 (13) 2.3枢纽布置 (13) 第3章坝体剖面设计 (14) 3.1坝顶高程的确定(参考《水工建筑物》教材 P34) (14) 3.2挡水坝剖面设计 (16) 3.2.1 坝顶宽度的确定 (16) 3.2.2 折坡点位置及坝底宽度的确定 (17) 3.2.3 基础灌浆廊道尺寸拟定 (17) 3.2.4 排水廊道尺寸拟定 (17) 3.3溢流坝剖面设计 (18) 3.3.1 溢流面曲线设计——参考《水工建筑物》教材P38 (19) 3.3.2 剖面设计 (23) 3.4水力计算 (24) 3.4.1 堰顶过流量计算 (24) 3.4.2 底孔泄流计算 (24) 3.4.3 挑流消能计算 (25) 3.4.4 水面线的确定(参考《水工设计手册》卷6相关部分) (26) 3.4.5 溢流重力坝的上部结构设计 (28) 第4章挡水坝稳定分析及应力计算 (30) 4.1计算情况及控制标准 (30) 4.1.1 应力分析计算原理 (30) 4.1.2 稳定应力控制 (30)

4.2荷载组合及计算 (31) 4.2.1 荷载组合 (31) 4.2.2 荷载计算(正常蓄水位情况下) (31) 4.3兴利水位、校核水位下的计算 (36) 4.3.1 兴利水位下的计算 (36) 4.3.2 校核水位下的计算 (39) 4.4兴利水位加地震荷载作用下的计算 (42) 4.4.1 兴利水位加地震荷载下的抗滑稳定计算 (42) 4.4.2 兴利水位加地震荷载下的坝基础截面的应力计算(75.0米高程) (42) 第5章溢流坝稳定及应力计算 (44) 5.1荷载计算及其组合 (44) 5.1.1 自重:包括闸墩、坝体、工作桥、交通桥、启闭机。 (44) 5.1.2 动水压力的计算(兴利水位下) (46) 5.2兴利水位、校核水位下的稳定及应力计算 (46) 5.2.1 兴利水位下的计算 (46) 5.2.2 校核水位下的计算 (50) 第6章细部结构设计 (55) 6.1混凝土分区及标号选择 (55) 6.2坝体分缝 (56) 6.2.1 横缝 (57) 6.2.2 纵逢 (57) 6.2.3 水平施工缝 (57) 6.3坝体廊道系统 (57) 6.3.1 基础灌浆廊道 (57) 6.3.2 检查和坝体排水廊道 (58) 6.4止水和排水 (59) 6.4.1 横缝止水 (59) 6.4.2 坝体排水 (61) 6.5坝顶布置 (61) 6.6地基处理 (62) 6.6.1 地基开挖与清理 (62) 6.6.2 坝基帷幕灌浆 (62) 6.6.3 坝基固结灌浆 (63) 6.6.4 坝基排水 (63) 6.6.5 断层破碎带和软弱夹层的处理 (63) 参考文献 (65) 谢辞 (66)

某水利枢纽工程拦河闸设计毕业设计说明书(doc 52页)

目录 标题----------------------------------------------------------------------------6 设计总说明 -----------------------------------------------------------------7 第1章基本资料------------------------------------------------------------8 1.1 工程概况 ----------------------------------------------------------------8 1.3 工程地质及水文地质---------------------------------------------------8 1.4 水文资料-----------------------------------------------------------------9 1.4.1 渠首处河道水位~流量关系----------------------------------------9 1.4.2 泥沙资料---------------------------------------------------------------9 1.4.3 气象资料---------------------------------------------------------------9 1.5 设计补充资料---------------------------------------------------------10第2章选线、选型、枢纽布置------------------------------------------11 2.1 闸坝的选择------------------------------------------------------------11 2.2 枢纽布置形式-----------------------------------------------------------11 2.3 拦河建筑物形式(即采用拦河闸还是壅水坝)-------------------12 2.4 枢纽防沙设计-----------------------------------------------------------12第3章水闸的水力计算---------------------------------------------------13 3.1 闸孔设计---------------------------------------------------------------13 3.2 闸孔型式---------------------------------------------------------------13 3.3 闸底板高程的确定-----------------------------------------------------13 3.4闸孔尺寸的确定-------------------------------------------------------13

相关文档
相关文档 最新文档