The First Simulated International Conference on Mining Engineering, Rock Mechanism and Safety Technology

Conference Program

Sponsor by: Central South University, China Supported by: Graduate School of Central South University Hosted by: Doctor English Class D3

November, 04, 2013

Changsha, China

The First Simulated International Conference Conference Theme: Mining Engineering, Rock Mechanism and

Safety Technology

Conference Time: 8:00-12:00, Monday, November,

04, 2013

Conference Address: Room 229, Mining Building

Specially Invited Adviser:ShenJinhua

Session Chair:Wu Qiuhong

Hostess: Ma Li

Secretariat:XieXiaofeng

Organizing Committee:Xiexiaofeng, Ma Li, Wu Qiuhong

Notes for the conference program:

1.The time limit for oral presentations is set as follows:

It will be better if the reporting time is controlled within 5 minutes, but there are 1 minutes for the reporter answering the attendees’questions. The total time for each speaker is no more than 7 minutes. When the report runs overtime, the session chair will interrupt the speaker.

2.Everyone should be punctual and leave conference only after it comes to an end.

3.All participants please set your cell phone to silent mode during conference.

Agenda

Study on model experiment and design method of the anti-sliding

micro-piles

Ma Li135501002

Abstract:This paper which is supported by transportation science and technology development and innovation project of Hunan province, has completed a large collection of anti-sliding micro-pile research information at home and abroad, and design a large-scale physical model experiment about the anti-sliding micro-pile to study the anti-sliding characteristics in Different composite structure. Then the article proposes a new method of the anti-sliding micro-pile about internal force calculation and design with the experiment results. Finally, the applicable environment of the anti-sliding micro-pile composite structure is discussed.

Study on Dynamic Effects of Existing Tunnel Caused by Blasting Excavation of Undercrossing New Tunnel

XieXiaofeng135501003

Abstract: Cross tunnel with small interval is a new kind of structure emerged in recent years. The adoption of cross tunnel with small interval is not only to meet the special requirements of unusual geological condition and overall linear route, but also conducive to the overall programming and optimization, with significant economic, social and environmental benefits. However the design and construction of this kind of tunnel remains many technical questions to be solved. For instance, when the new tunnel is close to existing tunnel,the seismic wave induced by blasting endangers the safety and stabilization of the surrounding rock and the lining of existing tunnel. With the rapid urbanization process and the further utilization of underground space, the cross tunnel with small interval will be an increasing number. The research of its design and construction technologies, impacts on existing structure, have high significance on both academic study and engineering practice.

The development trend of mining technology

XieYousheng 135501004

Abstract: There are more than 10 000 pits in our country, which refer to coal mines, metal mine, and others. The shallow resources are drying up, our pay more and more attention to deep resources. In the meantime, the problems caused by the deep mining engineering need for better technologies or knowledge to solve. The digital mining is an advanced technology, the technology is composed of mining science and technology, informatics, artificial intelligence, computing Science.

The Caving Mining Safe Control Technology on The Multi-Mined-Out-Areas Conditions of the ShizhuyuanPolymetallic Mine

Zouping 135501005

ABSTRACT: The Shizhuyuanploymetallic mine was mining by room-and-pillar open stope method for more 10 years. After 36 designed rooms are mined out, left 2,600,000m3 mined-out areas with 8000m2 of the maximum continued exposed face of roof without filling for some reasons. For the mine sustainable development and the safe mining, one mainly issues is how to management of mined-out-areas and the pillar mining. So some study was carried out:

1) After the engineering geological evaluation, the mechanics parameters of rock mass was derived by generalized Hoek-Brown failure criterion.

2) Cavability (i.e. caving areas) of the Shizhuyuanploymetallic mine was worked out by Laubscher and extended Mathews methods.

3) For the purpose of safety mining, the ground pressure monitoring system such as Acoustic Emission(AE), displacement and pressure method that suit for the hard rock were designed and installed. The technological routes of the ground monitoring and an early warning case are listed.

STATUS AND PROSPECT OF DIGITAL MINE TECHNOLOGY

Wu Shuliang 135501006

Abstract:With the scientific and technological progress and economic development recently,the conception ofdigital mine is widely accepted. The basic technology of digital mine can not only improve the production efficiencyand reduce the accident rate,but also the digital mine is the ultimate objective of the mining industry. This paperintroducesthe application status of digital mine. In the future,the research of high-tech digital minetechnology should be emphasized and mine intelligent technology should be popularized,which will enhance thesustained and healthy development of mining industry in our country .

How to select a proper mining method

Huang Zhiguo 135501007

Abstract: To select a mining method is vitally important for the design of mining. Inorder to selecta optimalmining method, some main factors should be considered carefully, and some proper approach should be followed accordingly. My report briefly introduced the main factors affecting the selection of an mining method, and a proper approach to select an mining method.

Ground Control

Wu Weiwei135501008

Abstract: The terms ground control and strata control, which here are used interchangeably , date back some 60 years to the early 1930s when the use of rock bolts was pioneered in the United Stated. The first international conference on rock pressure and

ground control was held in Liege, Belgium, in 1951. In essence, ground control means maintaining rock mass stability by controlling the movement of excavations in the ground, which can be either rock and soil. This is a specialty engineering field that is important because the design of underground excavation is, to large extent, the design of underground support systems such as pillars and rock reinforcement.

Although today, ground control is no longer solely a mining art since much of it can qualify as an engineering science, the application of rock and soil mechanics principles and techniques in day-to-day mine planning and design is still not common. It is hoped that the up-to-date knowledge digest contained in this chapter will contribute to better dissemination and application of ground-control concepts and techniques, some of which have been available for many years but which mining engineers have not availed themselves fully.

Theoretical study of equal stress load-bearing-arch strength in deep

soft rock roadway

WangPing135501009

Abstract:For the difficult support characteristics of deep-soft rock roadway, accordingto the stress distribution law and the bolt support properties, deep-soft rock roadway equal stress bearing arch strength theory by bolt was proposed. The theory is based on the roadwaystress environment, through match the length of anchor bolts, it could be formed a more uniform stress distribution of bearing structure in the surrounding rock.This bearing structurewith betterbearing ability that will maintain the stability of roadway.In addition,the formula of bearing capacity of circle-bearing arch has obtained, it has a certain reference value for the project of soft rock engineering in deep.

Numerical Simulation on Mechanism of Pre-splitting crack under

Filling-Mining

Ke Bo 135501010

Abstract: In underground mining, especially in reconstructed mining environment, the study on controlling blast disturbance effect and pillar extractionclamping action is much lacked. According to the characteristics of rock mechanics and explosives, using JWL state equation of high explosive and explicit dynamical analysis software package LS-DYNA, the mechanism of pre-splitting near backfill was simulated on the basis of study on fragmentation ore block’s mining in GaoFeng mine, China Tin group Co. Ltd.

Study of Mechanical Property of Limestone Specimens

with Natural Continuous Plane

Wu Qiuhong135501012

Abstract:Rock is made of mineral grains with fissures, beddings and cracks, heterogeneity and anisotropy of rock can occur at micro and macro scales,and it is not nonlinear elastic at all. On basis of granite and limestone with natural single continuous weak plane, heterogeneity, anisotropy and mechanical parameters of rock were studied.

BASED ON MICRO-SEISMIC MONITORING TECHNOLOGY IN MINE

SAFETY MANAGEMENT RESEARCH

Huang Weixin 135501013

Abstract: As the superficial resource in mine is beening exhausted, mining-induced seismicity is becoming an serious economic and secure problem in deep mining.It’s necessary for secure produce and people’s life and property to research the response lower and fataless for forecast of mining-induced seismicity. This paper deeply studied the

response lower of mining-induced seismicity in Dongguashan copper mine.It included space-time lower,related characteristics of magnitude-frequency and energy-seismic moment,stress-strain lower and relations between seismicity and exploitation,and get some perfect results.

The Typical Application of Room and Pillar Method

inErlihe Lead-zinc Mine

Wang Chun135501014

Abstract:The form of ore body in Erlihe Lead-zinc Mine is irregular,which looks like a saddle. The ore body is so hick and large that it is very difficult to exploit.The mine adopt open stope method with footwall chute used to be applied for mining,but the effect is not ideal.According to the mining technical condition of ore body ,the room and pillar method is recommended.The research results show that loss ratio,dilution ratio and mining-cut ratio are all significant fall.At the same time,the roof of goaf was controlled effectively by using the anchor to support.The room and pillar method is an ideal mining method for mining the saddle of ore body by synthesizing all kinds of factors.

The application of the Dimine in open-pit mine

Xiao Yingcai135501015

Abstract: Establishing production plan of open-pit mine is aindispensable link in mining engineeringnowadays, In this paper, testablishingthe orebody model and the surface model based on the original geological data by DIMINE software,with the actual data, optimize the design of the open-pit, and on the basis, the system can automatically optimize the order of stripping, meanwhile technical staff canparticipatein the preparation of stripping

plan.The results show thatusing the three-dimensional visualization can obtain satisfactory state of shell open.can effectively guide the design ofmining stage or mid -long term production plan On Open-pit standing on the actual production data, it can provide new workable way for stripping planoptimization, meanwhile ,it improves the production efficiency and achieve the goal of quick work in open-pit mine .

Numerical Simulation of Hydraulic Fracturing in Coal Bed

Sun Gangzhong135501016

Abstract: The gas extraction is an effective means in dealing with the gas,Hydraulic fracturing for increasing permeability is an effective technological approach in low-permeability coal seam,to get the cracks of rock mass in Hydraulic fracturing , using Flac3d to simulate. Set the criterion of crack development.A computing algorithm with moving boundary condition was developed on the basis of discontinuum mechanics and implemented in FLAC3D.FLAC3D offers the advantage to integrate all fractures in one single computing model.

Prediction and Safety Analysis for Ground Subsidence of Transition from Open Pit to Underground Mining

KeYuxian 135501017

Abstract:In order to maximize mining the underground resources and ensure the safety of the buildings and structures located at ground, the ground subsidence and movement induced by transition from open pit to underground mining of Xinqiao Mine was studied based on a three-dimensional model established by MIDAS/GTS. The results showed that the largest value of surface tilt(i), curvature(K) and horizontal deformation (ε) are 0.640mm/m, 0.012×10-3/m and 0.503mm/m, which lower than the structures and buildings objects protection level and the allowable deformation value corresponding. The ground

subsidence and movement induced by transition from open pit to underground mining will don’t endanger the buildings and structures located at ground, which provide a theoretical basis for prediction and safety analysis of Xinqiao Mine’s ground subsidence.

Cemented backfilling performance of yellow phosphorus slag

Yang Li 135501018

Abstract: Laboratory experiments about feasibility of cemented backfilling with yellow phosphorus slag, including physical-mechanical properties and chemical compositions, optimized proportion, cemented mechanism, was carried out to make good use of yellow phosphorus slag, tackling with the environment and safety problems of those piled outdoors as well as geological hazards and high cost issues during the mining processof Kaiyang Phosphorus Mine Group, Guizhou. The results show that, yellow phosphorus slag, possessing a certain potential cemented properties, can be used as Portland cement substitute. Adding quicklime, hydrated lime and other alkaline substances can deal with the high residual phosphorus of yellow phosphorus slag and phosphorousgypsum, improving the initial strength of cemented backfilling body of yellow phosphorus slag and phosphorousgypsum. Based on the initial strength requirements, the recommend proportions of mass ratio are 1:1 (yellow phosphorus slag: phosphor gypsum), 1:4:10 (Portland cement: yellow phosphorus slag: phosphor gypsum) and 1:4:10 (ultrafine powder: yellow phosphorus slag: phosphor gypsum), with 5% of hydrated lime addition, 60% of mass fraction of solid and good rheological properties.Ca(OH)2is the activating agent of hydration reaction of yellow phosphorus slag and the cemented process involves hydration stage, solidifying stage and strength stage. The hydration reaction velocity of yellow phosphorus slag, Portland cement and ultra-fine powder speeds up, with the stability of cemented microstructure and initial strength also increasing.

Wear mechanism and serious wear position of casing pipe

in vertical backfill drill-hole

Liu Enyan135501019

Abstract: Vertical backfill drill-hole is usually a key project in an underground mine with backfill method and can be easily damaged by impact of backfill slurry. Observation of the damaged vertical backfill drill-holes in Jinchuan Nonferrous Metal Corporation (JNMC), Gansu Province, China, given by a digital drill-hole video camera, indicated that there usually exist serious wear zones in casing pipe in vertical backfill drill-hole (CVBH). It was suggested that serious wear position of CVBH should be located at an interface between air and solid?liquid mixture within CVBH. Backfill slurry falls freely and impacts the wall of CVBH near the interface with great momentum and energy coming from high speed free fall of backfill slurry. The depth of serious wear position of CVBH, i.e., free fall height of backfill slurry in CVBH, can be estimated by the height of vertical backfill drill-hole, the length of horizontal pipeline, the density of slurry and the hydraulic gradient of pipeline system. A case study indicated that the estimation equation of serious damage depth of CVBH was of enough accuracy and was helpful for daily maintenance and management of vertical backfill drill-hole.

Risk Assessment on Blocking of Filling Pipeline Based on Uncertainty

Measurement Theory

WANG Shi135501020

Abstract:In order to forecast the difficult degree on filling pipeline blocking of filling system in deep mine, the assessment model of filling pipeline blocking was established on the basis of the uncertainty measurement theory. Ten evaluation indexes were selected as the discriminant ones of the uncertainty measurement model. The uncertainty measurement function of each index was obtained based on the in-situ data. The information entropy theory was used to calculate the weight of each discriminant index,

and the predictive value of filling pipeline blocking was finally achieved using the rules of credible recognition criteria. The results show that the four evaluation objects are Longshou mine of Jinchuan company, Dahongshan copper mine, Hedong gold mine, and Xincheng gold mine, and the risk grades of them are respectively Ⅱ, Ⅲ, Ⅳ, and Ⅲ. The influence of evaluation system versus the evaluation indexes can be comprehensively considered by the uncertainty measurement theory, which is quantitatively calculated.

Stability analysis and comprehensive treatment methods of landslides under complex mining environment—a case study of Dahu

landslide from Linbao Henan

Dai Bing 135501021

ABSTRACT:A case study of Dahu landslide from Linbao Henan in China was discussed in this paper. Based on various kinds of basic data, the 3D numerical model of a geological structure which possesses all kinds of information including the mechanical characteristics and the geometrical parameters of geological discontinuities were known from previous works. Thus, both the whole geological structure and all kinds of geological components involved in a slope can be visualized on computer, the complicated analysis and calculation can be then carried out easily and effectively. Firstly, the combination of 3D numerical model with some classical theories in slope stabilization can easily provide the present stability factor. Then according to monitoring data of the total station, the potential sliding trends are analyzed if landslides do not occur. Secondly, there are a number of uncertainties on the factors of coupled disaster forming, such as, rainfall, earthquake, and mined-out area. The unascertained mathematics theory is applied to the stability comprehensive analysis. It shows four landslide bodies get to be at unstable state if there are some inducements. Thirdly, sliding distance and movement scope were predicted if landslides occur. On the basis of the analysis above, the treatments of the landslide body called isolated method of culvert are proposed. It has solved the contradiction of landslide and mining radically, and provides important technical assurance for safety and sustainable development of mine.

Simple discussion on filling theory and technology

GuoHongquan135501022

Abstract:The development situation of the cutand fillmethod athome and abroad is presented andits advantages are also described such ashigh safety, high recovery ratio and smalldestruction to ecologicenvironmenton ground surface. Applicable condition and developmentorientation of the dry fillingmethod, hydraulic sand fillingmethod, cemented fillingmethod and fillingmethod arediscussed.It thinksthatwith progress ofscience and technology, the cutand fillmethodwillbecome a foremostminingmethod in undergroundmining ofdeposit.

Establishment of Comprehensive Emergency Management System

for Campus Emergencies

Song Qing-hua 135501024

Abstract:Because of social transformation, expansion of university enrollment and introduction of other service industries made campus potential safety hazard more complex. Campus emergencies are increasing in frequency and often occur in different forms, which have aroused widely public attention. Campus emergency has the features of social sensitivity, subject activeness, loss additive, as well as showing the characteristics of general emergency, thus abruptness, uncertainty, destructiveness, derivative, diffusivity, sociality. Apparently, traditional safety control system is far from meeting the requirements of current campus security situation, deep reformations for campus security are needed. China’s policy for emergency management is called “one plan and three systems” (representing emergency response plan and organizational system, mechanism system, legal system) had been made into practice in many domains and helped improve their security. It is found that emergency management will be effective and efficient only by: firstly, bringing into play the effort of the whole society (including not only school, educational system, family, students that have direct correlation with emergency, but also media, transport agency, hospital, public security and other social organizations that are

indirectly associatedwith emergency) and secondly, considering the whole life cycle of emergency (including four time periods, thus no emergency, before the emergency, during the emergency and after the emergency) to minimize the resulted loss.Based on the “one plan and three systems” policy and with the intention of controlling emergency from a time-space perspective, the idea of establishing the Comprehensive Emergency Management System (CEMS) for campus emergencies is put forward. It is rational to expect that there will be resistance to the system’s implement ation for economical restriction or lack of safety awareness, so more detailed consideration is necessary for the system’s eventual accomplishment.

3-D Numerical Analysis On The RightOpportunity Of Support In Soft

Rock Roadway

GUI Rong 135501025

Abstract: An analysis was made on the soft rock of Yunling tunnel by using the finite element software ABAQUS.The changes of the displacement, stress and plastic zone during the process of construction was analyzed.And using the way to get the right opportunity of support in the soft rock. It is validated that the method is correctusing the monitoring data and the method will be significant for engineering practicability.

Features of pipe transportation of paste-likebackfilling in deep mine

Yang Jiang 135501027

Abstract:Based on the pipe transportation of paste-like backfilling system of a certain deep coal mine, dynamics process was simulated and analyzed. A two-dimension dynamic model of extraordinary deep and lone pipe was built by GAMBIT, on the base of which, simulation was done by implicit solver of FLUENT 2ddp. The results show that hydraulic loss of pipe transportation is less than the pressure produced by gravity which means backfilling material can flow by itself; when the inlet velocity is 3.2m/s, the maximum

velocity of 4.10m/s isat the elbow and the maximum velocity in the horizontal pipe is 3.91m/s, which are both sensible to meet the stability requirement. Results of the simulation were proved reliable by the residual monitor plotting of related parameter, so it’s concluded that the system of pipe transportation is safe and reliable.

Research on heavy metals pollution in soil along the ortransportation

roadside

Li Xiaoyan 135501028

ABSTRACT:This paper introduces the main sources and transmission of heavy metal pollution in the ore transportations roadside soil and the detection methods of heavy metals in the soil, and analysis the influence degree of the soil polluted by heavy metals according to the main evaluation standards at this stage. But the present study lack of quantitative impact of heavy metals and can not highlight the defect effects of heavy metals on the biological activity of certain proportion evaluation standard.

Experimental investigation on the energy-saving diffuser of a main

fan

Li Gang 135501029

Abstract: The main fan diffuser in a coal mine is an energy-recycling equipment with a dynamic energy loss for the main fan. Engineering practices and related researches show that the body structures of three types of diffusers are irrational. To solve the problem, an energy-saving diffuser is designed on the basis of the velocity potential theory. Under conditions of inlet velocity from 7 m/s to 32 m/s, 7 condition experiments using the energy-saving diffuser of 2.31 AER (area-enlarging ratio) and 5 condition experiments using the energy-saving diffuser of 2.00 AER were conducted. Through a comparative analysis of the experiments, the results show that the COP (coefficient of performance) of the energy-saving diffuser of 2.31 AER is better than that of the energy-saving diffuser of 2.00 AER.

英语模拟国际会议

Introducing a speaker (Sample)

Having spoken to over a million people, give or take a few thousand, our speaker is known for her ability to relate to audiences by leaving them in the "interested student of life position." Her passion is contagious! And, she claims to have many great passions in life–including her husband, two children, sailing and watching her identical twin sister get older. So to speak to you on "Speak and Grow Rich," Please join me in welcoming–from the coast of Massachusetts –author, educator, business owner, wife and first mate, Nancy Hunter Denney. 其它个人信息 表示欢迎 He has co-authored over 300 peer-reviewed publications and 75 issued U.S. patents, and is the recipient of several awa rds and honors including the Eli Lilly Award in Biological Chemistry and the Pure Chemistry Award from the American Che mical Society; the Allan P. Colburn Award and the Profession al Progress Award from the American Institute of Chemical En gineers; and the Alan T. Waterman Award from the National S cience Foundation. He is an elected member of the American Academy for Arts and Science and the National Academy of En gineering. Over the past two decades, he has co-founded four biotechnology companies (Kosan Biosciences (KOSN), Alvine Pha rmaceuticals, Flamentera AG, Sitari Pharmaceuticals), and was the founding President of the non-profit Celiac Sprue Researc h Foundation. Dr. Zhang is a Professor in the Departments of Chemical Eng ineering Dalian University of technology, panjin campus, and assistant dean of Departments of Chemical Engineering. He rec eived his PhD in chemical engineering in 1990 at (place fro m he obtain degree.) After completing postdoctoral studies ch emical engineering from UK, he joined Dalian University in 1992. His research on fuel cells has opened the door to fundamentally new approaches for engineering of fuel cell

英语模拟国际会议讲稿

英语模拟国际会议讲稿 Company Document number:WUUT-WUUY-WBBGB-BWYTT-1982GT

英语模拟国际会议 主持人:王×会议出席人:朱××会议中提问者两人:董×、赵××休会中途与嘉宾交谈两人:张×、唐×× 会议结束提问者:余×、龚× 主持人王×:Ladies and Gentleman: May I have your attention please Our conference will begin in a few minutes. All the presenters are requested to be seated. Let me introduce myself,i am wang yuan from SCNU,it’s a privilege for me to chair this session. Once the ceremony has started,you are refrained from taking pictures, using flashbulbs or leaving your seats. guests, distinguished delegates, ladies and gentlemen, and all the friends:At this special time of wonderful June, in this grand hall of the beautiful city, our respectable guests are here getting together. Academic Seminars of CAS are organized by the Bureau of Personnel and Education of CAS, and held by the CAS research institutes. Now, first of all, please allow me to give our hearty welcome to all of you present, and thank you, for your friendly coming. We feel so proud, and appreciated as well to be the host of the event. For this conference, we are following the agenda here. The meeting is supposed to last for five days,it is the first congress which covers the true sense of psychological education、moral education,basic education

国际会议作报告英语发言稿

国际会议作报告英语发言 稿 Prepared on 22 November 2020

Thankyou,prof.….Mynameis…..I’m from…..Iamverypleasedtobeheret ojointhisforum.Thetopic,themainpartsofmyresearchareaboutsoilpavement. Mypresentationwillincludethesefourparts: First,somebackgroundinformationaboutthisresearch;second,themainwork wehavedone;third,someconclusionswehavegotandthelast:innovationandpr esentationofourpublishedpapers. WhyIchoosethisitem,theexistingquantityofairfieldsisstillnotsufficientand theairfieldshavemanyshortcomingsespeciallyinwartime.Second,thecomple mentaryfacilities,suchashighwayrunwaysarefarlessthanairfields,however,, ,thefieldairfieldcanfillthevoidofairfieldandtheycanbecombinedtobeairfield network. ,convenientandvalidity,fastmeansthefieldairfieldmustbeconstructedasfasta spossible,convenientmeanstheconstructionshouldneedtheminimumequip ment,laborandmaterialsconsideringtheactualconstructioncondition,validit ymeanstheconstructedairfieldisabletosupporttheoperationofgivenaircraftin specificallytime. Justlikemanyotherterritories,

国际学术会议常用语(英语)

学术会议常用表达 1. 有关会议的一般信息 (1)名称 conference academic conference international conference symposium annual meeting/symposium/conference forum, international forum workshop (2)日期 dates/important dates/key dates (3)地点 location/venue conference location/venue (4)主题 issues/themes/(main)topics/scope of conference conference themes/topics topic of interests 2.论文征稿、提交与录用 call for abstract/proposal/paper paper deadline deadline for abstract/full paper/proposal submission submission deadline deadline extended date for mortification of acceptance Paper acceptance/rejection will be informed by… deadline for authors notification camera ready version deadline 3. 会议注册 deadline/closing date for registration registration form registration information registration fees and items official invitation letter payment telegraphic transfer only bank transfer bank draft/check 4. 会议进程及容 conference schedule/program preliminary conference program final conference program opening ceremony/session keynote session/parallel session/tutorial session keynote speech oral presentation poster presentation tea/coffee

英文主持人演讲稿

英文主持人演讲稿 篇一:英文学术会议主持人发言稿 模拟国际会议主持词 一、开题语 Good morning, ladies and gentleman. Welcome to Chicago, a beautiful city of America. I’m^^^^^^^^^^^^^^^^, from*********** University of a very very great pleasure to participate in the 110TH Association of American Geographers Conference as the chairman,its my first time to do I really enjoy being stay here with you this morning. The International Geography Conference has been held 110th times by the Association of American Geographers (AAG) institute since 1904. The purpose of the conferences have contributed to share our experiences and knowledge of the advancement of geography, frontier developments and reaserches, as well as possible applications of them in solving practical problems. A lot of current issues have been discussed, and some of them have been effectively soluted. Welcome to the Association of American

国际会议发言稿 英文(精选多篇)

国际会议发言稿英文(精选多篇) 第一篇:国际会议--英文 表示欢迎:good morning, ladies and gentlemen, i’m privileged to welcome you all to “the current status and future development of cotton machinery” conference. 自我介绍:let me introduce myself i am dr lifrom beijing, china, and i am going to be the chair for this morning’s session. 介绍议题: this conference will focus on the discussion of the various aspects of cotton machinery. it includes the application of cotton machinery and the current status.and we will also discuss the prospect of cotton machinery. 介绍报告人: now it gives me great pleasure to introduce today’sparticipants. they are :han dan, the director general of the united nations industrial development organization(联合国工业发展组织总干事) zhang hui, president of china power investment group company. shang fengjiao, professor of physics ,head of american nuclear energy association. now, we welcome the opening of han dan do for us(现在,我们欢迎aa 为我们做致开幕词) aa上台

英文国际会议演讲稿范文

英文国际会议演讲稿范文 英文会议演讲稿篇一:英文国际学术会议开幕词演 讲稿 Distinguished guests, distinguished delegates, ladies and gentlemen, and all the friends: At this special time of wonderful August, With a pleasant subtropical climate in Xiamen, Our respectable guests are here getting together , undertaken by XMU , the 2014 10th International Conference on Natural Computation and the 2014 11th International Conference on Fuzzy Systems and Knowledge Discovery , will be open. Now, First of all, please allow me to give our hearty welcome to all of you present, and thank you , for your friendly coming. We feel so proud, and appreciated as well to be the host of the event. It is a great honor for us to have all you here to attend this conference, of which the theme is the academic exchange about the advanced technologies on Computer Science. Here I’d be delighted to introduce our conventioneers in brief. Apart from

国际会议英文发言稿

国际会议英文发言稿 篇一:英文国际学术会议开幕词演讲稿 Distinguished guests, distinguished delegates, ladies and gentlemen, and all the friends: At this special time of wonderful August, With a pleasant subtropical climate in Xiamen, Our respectable guests are here getting together , undertaken by XMU , the XX 10th Interna tional Conference on Natural Computation and the XX 11th International Conference on Fuzzy Systems and Knowledge Discovery , will be open. Now, First of all, please allow me to give our hearty welcome to all of you present, and thank you , for your friendly coming. We feel so proud, and appreciated as well to be the host of the event. It is a great honor for us to have all you here to attend this conference, of which the theme is the academic exchange about the advanced technologies on Computer Science. Here I’d be delighted to introduce our conventioneers in brief. Apart from our faculty and

国际会议发言稿模板

国际会议发言稿模板 篇一:国际会议作报告英语发言稿 Thankyou,prof.….Mynameis…..I’ mfrom…..Iamverypleasedtobeheretojointhisforum.Thetopicofmy presentationispropertiesofrapidconstructionmaterialsforsoil pavementoffieldairfield.Asisshowninthepicture,themainpartso fmyresearchareaboutsoilpavement. Mypresentationwillincludethesefourparts: First,somebackgroundinformationaboutthisresearch;second,the mainworkwehavedone;third,someconclusionswehavegotandthelast :innovationandpresentationofourpublishedpapers. WhyIchoosethisitem?Ithinkitcanbeillustratedfromthefollowing

fourparts.First,theexistingquantityofairfieldsisstillnotsuf ficientandtheairfieldshavemanyshortcomingsespeciallyinwarti me.Second,thecomplementaryfacilities,suchashighwayrunwaysar efarlessthanairfields,however,havemoreweakness.Third,acerta inamountoffieldairfieldisquitenecessaryconsideringsomeemerg enciessuchasrescueanddisasterrelief.Forth,thefieldairfieldc anfillthevoidofairfieldandtheycanbecombinedtobeairfieldnetw ork. Themeaningandaimofthisresearchcontainsthreeparts.Fast,conve nientandvalidity,fastmeansthefieldairfieldmustbeconstructed asfastaspossible,convenientmeanstheconstructionshouldneedth eminimumequipment,laborandmaterialsconsideringtheactualcons tructioncondition,validitymeanstheconstructedairfieldisable

国际会议英语口语句

国际会议英语口语100句 一、开幕式中,宣布开幕、欢迎词及贺词。 (1) Mr President of the Congress, President A and distinguished guests: 尊敬的大会的主席先生,会长A和贵宾们。 (2) Dr. (Professor) A, Dr. (Professor) B, ladies and gentlemen. A博士(教授)、B博士(教授),女士们,先生们。 (3) Mr. Chairman, fellow delegates, friends. 主席先生、同仁们、朋友们。 2 宣布开会。 (4) I am very pleased and honored to declare···(the conference)open. 我很高兴和荣幸地宣布···开幕。 3 来宾在开幕式上致辞。 (5) I am greatly honored to give the opening address/speech at this ···(3rd ) International Congress of ABC here in Beijing 我深感荣幸在北京举办的第···次ABC国际大会上致开幕词。 4 主办单位对参会者致欢迎词。 (6) On behalf of the ABC society, I am delighted to welcome all of you to the ···(1st) International Symposium of XYZ. 我很高兴代表ABC学会欢迎你们所有的人来参加第···届XYZ国际学术会议。 (7)You have come all the way for this conference. Thank you very much for your attention/participation. 你们远道而来参加会议。谢谢你们出席会议(参加会议)。 5 参加者对主办单位表示赞赏。 (8)Thank you for your invitation and warm hospitality. 谢谢你们的邀请和盛情款待。 6 介绍会议的背景。 (9)The history of this gathering/conference goes back to September 1982, when it first became apparent to us that developments in the field of ABC had become so important that a conference seemed mandatory. 此次会议的历史可追溯到1982年9月,当时ABC领域的发展已变得如此重要,组织一次会议显然是必要的。 7 介绍会议的目的和期望。 (10)The goals of this Conference are threefold. First, it should provide a forum for the exchange of information between participants in this interdisciplinary meeting. Second, it should provide an opportunity to establish and renew personal relationships between participants, and finally, it should stimulate the interest and ambition of participants from all over the world to cooperate in their efforts. 这个会议的目标有三重。第一,它必须为参会者在这个属于交叉学科的会议上提供信息交流

模拟国际会议演讲稿

1. Introduction Thank you very much. Mr. Jiao, for your kind introduction. Ladies and gentlemen, Good afternoon! My name is Lijia, came from Harbin Engineering University. I am honored to have been invited to speak at this conference. Before I start my speech, let me ask a question. Do you know what can affect the properties of foam concrete? Do you think how to reinforced the properties of foam concrete?Most of the investigations on foam concrete in the past have been con?ned(被限于)to neat cement paste, cement paste with partial replacement with admixtures and to cement–sand mixes. Today, my topic is about In?uence of ?ller type on the properties of foam concrete. I want to share our interesting research result on reinforced concrete frame with you. The content of this presentation is divided into 4 parts: In section 1, I will introduce what is the foam concrete. In section 2, I will talk about Parameters investigated and mix compositions.In section 3, I will give E?ect of water–solids ratio on design density. And finally, I will make a conclusion. 2. Body Section 1: the foam concrete Now, I will introduce the foam concrete. Pre-formed(成型的) foam concrete is manufactured(加工)by adding foam, prepared by aerating (充气)a foaming agent solution, to cement paste or cement mortar(灰

国际会议作报告英语发言稿

Thank you, prof. …. My name is ….. I’m from ….. I am very pleased to be here to join this forum. The topic of my presentation is properties of rapid construction materials for soil pavement of field airfield. As is shown in the picture, the main parts of my research are about soil pavement. My presentation will include these four parts: First, some background information about this research; second, the main work we have done; third, some conclusions we have got and the last: innovation and presentation of our published papers. Why I choose this item? I think it can be illustrated from the following four parts. First, the existing quantity of airfields is still not sufficient and the airfields have many shortcomings especially in war time. Second, the complementary facilities, such as highway runways are far less than airfields, however, have more weakness. Third, a certain amount of field airfield is quite necessary considering some emergencies such as rescue and disaster relief. Forth, the field airfield can fill the void of airfield and they can be combined to be airfield network. The meaning and aim of this research contains three parts. Fast, convenient and validity, fast means the field airfield must be constructed

英语模拟国际会议讲稿

英语模拟国际会议 主持人:王×会议出席人:朱××会议中提问者两人:董×、赵××休会中途与嘉宾交谈两人:张×、唐×× 会议结束提问者:余×、龚× 主持人王×:Ladies and Gentleman: May I have your attention please? Our conference will begin in a few minutes. All the presenters are requested to be seated. Let me introduce myself,i am wang yuan from SCNU,it’s a privilege for me to chair this session. Once the ceremony has started,you are refrained from taking pictures, using flashbulbs or leaving your seats. 3Q.Distinguished guests, distinguished delegates, ladies and gentlemen, and all the friends:At this special time of wonderful June, in this grand hall of the beautiful city, our respectable guests are here getting together. Academic Seminars of CAS are organized by the Bureau of Personnel and Education of CAS, and held by the CAS research institutes. Now, first of all, please allow me to give our hearty welcome to all of you present, and thank you, for your friendly coming. We feel so proud, and appreciated as well to be the host of the event. For this conference, we are following the agenda here. The meeting is supposed to last for five days,it is the first congress which covers the true sense of psychological education、moral education,basic education

新手参加国际学术会议制作幻灯片及演讲的注意事项

国际学术会议幻灯片制作及演讲技巧 Slides(幻灯片): 1. 幻灯片的标题页里要包含所有作者(们)的名字和联系方式,不要用“等等…”来代替。 2. 幻灯片的标题页里可以有你的名字和联系方式(包括单位),但是太具体的信息不用一一列出。 3. 一般10 分钟的演讲,时间最好控制在9 分钟左右(8~10 分钟之间),留些时间回答问题,幻灯片建议控制在12-25 张范围内。 4. 幻灯片的背景不要太显眼,背景图片要与主题有关。 5. 所有幻灯片的文字与背景要有很好的对比—亮色的文字在暗色的背景上或暗色的文字在亮色的背景上显示。 6. 恰当使用明显的颜色来标记重要的文字,但不要过多使用。 7. 幻灯片不要出现过于花哨的动画,不要出现声音,录像长度不要超过30 秒。 8. 幻灯片不要出现拼写错误;不要出现语法错误,例如“How to do this?” 就是一种语法错误;不要出现格式上的错误。(例如字词间或句点前不要有多余的空格) 9. 幻灯片不要出现大段的文字—一般来说一个段落不应超过20 个字(英语单词)。 10. 6-15 个英文单词(汉语可能为20 个字)的长句子尽少用或不用,幻灯片上的文字应该仅仅是列出要点。 11. 一张幻灯片上不要有太多的内容,最好不要看上去很拥挤。 12. 除非特殊情况,幻灯片上的文字大小不要小于28 号字体,标题用32号字。 13. 每4-5 张幻灯片中至少要有一张图片、图示、表格或者是其他非文字的幻灯片。 14. 图示和(或)图片是用来帮助你更清楚表达你的想法或是实验步骤的。 15. 复杂的化学式和数学公式(如果有的话)最好写在幻灯片上,这样的话演讲者就不用把它读出来了。 16. 幻灯片主要用来归纳实验细节、公式细节和(或)论点(如果有的话)地。 17. 结论部分的第一张幻灯片要有“结论”字样标注在上面。 18. 结论部分至少要有三张幻灯片。 19. 不要在幻灯片结尾打上“谢谢”字样,但是演讲者在结束后必须要说“谢谢”。 Introduction(简介): 20. 在演讲的开始要有一些“妙语”以吸引听众。 21. 开始的第一分钟要浅显易懂,要使用日常用语。 22. 在开始的一分钟里,要清楚说明论文的研究领域,范围和研究的问题。 23. 将论文中的问题用通俗易懂的语言与一些日常生活联系起来以引起听众的兴趣,这样听众就会了解研究结果的价值。 24. 在开始的一分钟里,不要让听众们感觉到这次演讲只是为专家们准备的。 25. 不常用和(或)重要的特殊词语要在使用之前加以说明。 26. 比较难的专业术语要用简单概念定义、类比等方法和(或)图片来说明。 27. 一个主题的简介的长度要适当(通常2-3 分钟)。 Body(主体): 28. 主体部分不能有过多的内容,否则要全部说清楚时间会很匆忙。 29. 不要只是简单陈述结果,而要阐述它们的意义(好还是坏?有多大价值?有没有惊人发现?)。 30. 演讲者不能陷入讲解枯燥细节的泥潭中,如果要介绍细节要把握好节奏,细节的介绍仅仅是为了便于专家理解研究的关键点。 31. 演讲者对材料方法的介绍不能过于简化,听众们也许知道研究的结论是不一般的,但还是要对得起“研究”二字。 32. 在主体的某些部分,演讲者要用严谨的,非常专业的语言来向专家们介绍论文。 33. 复杂的化学式和数学公式(如果有的话)要在幻灯片上写出来,在谈到时口头上用其名称或“这个公式” (指着幻灯片)来说明,这样可不用读出来以节省时间。

国际会议的最终演讲稿

国际会议的最终演讲稿 good afternoon ladies and gentlemen: my name is shaoshasha,i am a senior in china jiliang university and majoring in business management. i am honored to be here to deliver an introduction of our group case study .this is our team member tanglihua ,sundan and me as we all know. sony and lenovo both enjoy high reputation among the mass. therefore, as a famous brand over asia, sony competes with lenovo in domestic market only by obtaining the knowledge of the comparative disadvantage and corresponding betterment, and this is the primary issue we should to settle. taking the customers#39; demand as an base, we launched a market research and thereby get an understanding that the technical standard is the computer’s feature. since qfd is of great usefulness in analyzing dates, we apply it in our study in order to figure the approach of sony‘s improvement. in addition, quality function deployment is to help transform the customer wants into engineering characteristics for a product or service, prioritizing each product or service characteristic while simultaneously setting the development targets for the product