文档库 最新最全的文档下载
当前位置:文档库 › 工程类毕业设计中英文摘要

工程类毕业设计中英文摘要

工程类毕业设计中英文摘要
工程类毕业设计中英文摘要

摘要

本设计为工程预算及施工组织设计。选取的题目是新南通生活配套区8#宿舍楼工程造价与施工组织设计。本工程负一层为半地下车库,地上五层,外加一阁楼层,建筑高度18.14m,建筑面积2893.55m2,结构形式为砖混结构。

首先是工程造价。通过一点智慧软件计算工程量,综合分析现行建筑市场的人工、材料、机械等市场价格,编制设计任务书规定范围的工程量定额报价和工程量清单报价。

其次是施工组织设计。根据工程特点划分施工段,确定合理的施工顺序,选择主要分部分项工程施工方法和主要施工机械,根据工期要求编制合理施工进度计划表,并绘制施工平面图,以及采取有效的质量、安全等保证措施,例如安全文明施工措施、季节性施工措施等。本工程包括工程进度、质量、造价三大控制和项目管理机构设计。根据工期要求,在工程进度调整条件下,绘制调整后进度计划表.另外根据工程特点,确定本工程的质量、进度、造价等控制要点,进行项目管理机构设计。此外还完成了6张AutoCAD 绘图和外文翻译。单项作业为个人小结。

关键词:工程量计算,工程造价,施工方案

Abstract

This design is the budget and construction organization design of the engineering.The graduation design subject is New nan tong life supporting area 8# dormitory project cost and the construction organization design.The -1 layer of the project is a underground garage,there are 5 layers overground and a attic, the building is 18.14 meters tall and it’s construction area is 2893.55 square meters, the structure form is brick and concrete structure. the graduation design consists of three parts which are construction cost ,the construction organization design,and project management .

Firstly, it is construction cost .The cost of construction project is calculated by Fly. Analysis the current price of labor, materials, machinery in the construction market and work out the Fixed price and the detailed list of engineering quantity price.choose construction measures of main component project and major machine,

Secondly, it is construction organization design. Devide the construction period according to the features of the project, make sure a reasonable construction sequence, Prepare the reasonable construction progress schedule on the basis of construction time limit, draw the construction plan chart and make some measures to protect the quality and safety of the project like safety civilized construction measures and seasonal construction measures.The project includes progress,quality and cost control, and project management institutions desigh. Draw adjusted progress schedule in the progress of the projects under the condition of adjustment, Draw the construction plan chart. Make sure the project quality, progress, cost and control points and desigh project management mechanism. In addition,I complete six AutoCAD paintings, and the personal summary.

Key words: Quantity calculation , Construction cost , Construction method

土木工程毕业设计摘要

前言 毕业设计是培养学生综合运用所学的基础理论、基本知识和基本技能,分析和解决实际问题的能力。它具有很强实践性和综合性,是培养学生独立工作的一种良好途径和方法。在设计过程中,我重温和巩固了以前所学的基础理论和专业技术知识,弥补了自身在这些方面的欠缺,同时更深刻地体会到了作为一名路桥工作者无论是在设计还是在施工过程中,都必须以科学严谨的态度将理论与实践切实联系起来。在设计中,我翻阅了大量的参考资料,努力使所学的知识不断地系统化,不断地融会贯通。 本设计是株洲市芦淞大桥引桥上部结构设计,要求完成必要的毕业论文及桥梁总体布置图、主梁一般构造图、主梁施工程序示意图等图纸。 拟建大桥距株洲市一水厂取水口下游约500m,西起泰山路与长江南路的交点,跨湘江,东至株洲市芦淞区,接建宁大道。其中河东岸引桥高架跨越沿江南路、建设路后与建宁大道平交,河西岸引桥高架跨越滨江南路后与长江南路平交,另外河西岸设有半互通式立交将大桥与滨江南路相互联接。 钢桥主要由于跨越能力大、最适合于工业化制造、便于运输、安装速度快,构件易于修复和更换而且钢材强度高、材质均匀、塑性及韧性良好和可焊性好等优点,现代钢桥得到了很大发展。本次钢箱-混凝土连续梁桥的设计中中用到了材料力学、现代钢桥、钢结构、结构设计原理、结构力学、桥梁工程等学科的诸多知识。同时还从图书馆借阅了大量教学参考书,力求在设计过程中尽量做到规范、合理、清楚。此次设计使我所学的基础理论和专业技术知识更加系统、巩固、延伸和拓展,对我以后从事桥梁方面的工作具有很好的指导意义。 论文共分六章进行阐述,并配有多幅插图,力求更具说服力。限于本人水平和资料不足,设计中肯定存在诸多不足,敬请老师和同学多多批评指正! 在设计过程中,得到了莫时旭老师及路桥教研室其他老师的悉心指导,谨此表示感谢!

毕业论文中英文摘要及目录(供参考)

密级:立体停车库的PLC控制系统设计 Design of PLC Control System for Parking Garage 学院: 专业班级: 学号: 学生姓名: 指导教师: 2018年6月

摘要 随着我国国民经济的不断发展及城市现代化要求,汽车在我国越来越普及,而这将导致大中等城市“停车难”问题日益凸显。在现有的土地资源条件下,多层的机械式立体停车库可以很好的提高现有土地资源的利用率,充分发挥土地资源的空间优势,使得汽车的存放数量得以优化,从而快速有效地解决大中等城市“停车难”问题。本论文以一个三层三行三列二十一车位的升降横移式自动化立体停车库为主要研究对象,在深入分析了立体停车库运行原理的基础上,采用可编程控制器(PLC)为主要控制单元对该立体停车库控制系统进行设计。论文研究的主要内容为: 1、针对机械式立体停车库类型、国内外发展现状以及我国行业发展中存在的问题等进行研究。 2、选定以三层三行三列6+6+9结构二十一车位升降横移式立体停车库为研究模型,研究该立体停车库的总体结构设计及车库运行原理等。 3、对升降横移式立体停车库的硬件系统进行设计。内容包括:主回路设计,手动控制系统设计,PLC外围硬件设计,绘制了车库主电路图,手动控制电路图和PLC外围电路接线图等。 4、对升降横移式立体停车库的软件系统进行设计。内容包括:PLC总体介绍,PLC编程语言的选择,设计了程序主框架流程图,各基本功能程序流程图,按要求编写了梯形图程序等。 5、采用S7-200仿真软件对升降横移式立体停车库进行在线仿真与调试。 本论文重点对升降横移式立体停车库总体结构和控制系统的硬件、软件系统进行设计。设计过程采用模块化设计思路,结构灵活,通过对PLC软件系统设计及优化,使得本立体停车库具备智能化控制的功能,实现了立体停车库停车位能够安全、稳定、准确、快速的移动至人车交接处进行存取车操作。该立体停车库充分发挥土地资源的空间优势,大大提升了土地资源的空间利用率,是应对大中等城市停车难问题的有效解决方案。 关键词:立体停车库;升降横移式;PLC;控制系统设计 Abstract

工程造价专业毕业论文参考题目

工程造价专业毕业论文参考题目 1、浅谈定额计价与清单计价的异同 2、探讨低价中标在建筑工程中的合理应用 3、如何编制一份高质量的工程量清单 4、浅谈建设项目施工招投标 5、建设工程项目信息管理研究 6、浅谈工程项目风险管理 7、浅谈建筑工程合同价款的确定与调整 8、建设工程违约责任分析 9、工程量清单计价与传统报价模式比较研究 10、浅谈投标报价策略及报价技巧 11、建筑施工企业如何加强工程造价管理 12.工程设计对工程造价的影响 13、注重工程结算提高索赔意识 14、编制预结算过程中几个疑难问题之我见 15、运用预算电算化软件的一些体会 16、工程量清单与无标底招标的一些思考 17、浅谈工程项目内部成本控制及措施 18、如何进行项目成本管理 19、施工项目管理与项目成本控制 20、建设工程招标投标的发展趋势 21、浅谈建筑企业成本控制

22、我国工程造价咨询企业发展前景 23、关于在项目采购管理中成本降低的几点认识 24、论在工程量清单计价下投标报价策略及技巧 25、工程监理在控制工程造价中的作用 26、如何实施工程量清单报价 27、如何理解清单计价和定额计价的联系和区别 28、工程变更对造价管理的影响 29、浅谈工程造价人员应具备的基本素质 30、论工程索赔和控制及其费用的确定 31、项目管理(施工组织设计)对工程造价的影响 32、工程造价与建筑市场关系的认识与思考 33、清单计价模式的造价控制 34、浅谈造价管理与投资控制 35、关于项目成本控制的思考 36、关于工程量清单计价招标问题的探讨 37、论如何有效降低建筑项目成本 38论工程量清单计价的招投标 39、论建筑工程成本分析与成本结算 40、浅谈项目管理中的成本控制

工程造价毕业设计摘要

摘要 本次毕业设计题目为芦屯中心小学教学楼的招标文件、施工图预算及工程量清单三个部分,建筑面积4463.6平方米,层数为4层,层高3.9米,结构类型为框架结构。本毕业设计由招标文件的编制、施工图预算、工程量清单的编制三部分组成。 设计的任务是招标文件的编制、施工图预算和工程量清单的编制,其核心部分与首要工作是工程量的计算,在设计过程中,以《建设工程计量与计价》、《工程量清单计价与规则》为依据,按照辽宁省建筑工程工程量清单计价办法进行,经过指导老师上课的仔细讲授与个别答疑,并通过使用查阅资料与网络等手段,在指导老师的帮助下先完成了工程量的计算。 关键词:招标文件、施工图预算、工程量清单

Abstrac The graduation design subject is Lutun center primary school building project cost and the construction organization design. there are 4 layers overground, the building is 16.5 meter s tall and it’s construction area is 4463.6 square meters, the structure form is frame structure. the graduation design consists of three parts which are the preparation of tender documents,construction drawing budget and the formulation of the list of quantities. The design tasks are the preparation of tender documents,construction drawing budget and the formulation of the list of quantities,the core part and the primary work is he formulation of the list of quantities.In the design process,based on ‘Construction engineering measurement and measurement’and ‘The quantities bill valuation with the rules’,according to the Liaoning Province construction engineering list valuation measures,after the teacher carefully in class teaching and individual answer questions,and through the use of datd access and network means,in the guidance of teacher to help complete the calculation of the quantity. Key words: tender documents , construction drawing budget, the list of quantities.

毕业设计外文翻译附原文

外文翻译 专业机械设计制造及其自动化学生姓名刘链柱 班级机制111 学号1110101102 指导教师葛友华

外文资料名称: Design and performance evaluation of vacuum cleaners using cyclone technology 外文资料出处:Korean J. Chem. Eng., 23(6), (用外文写) 925-930 (2006) 附件: 1.外文资料翻译译文 2.外文原文

应用旋风技术真空吸尘器的设计和性能介绍 吉尔泰金,洪城铱昌,宰瑾李, 刘链柱译 摘要:旋风型分离器技术用于真空吸尘器 - 轴向进流旋风和切向进气道流旋风有效地收集粉尘和降低压力降已被实验研究。优化设计等因素作为集尘效率,压降,并切成尺寸被粒度对应于分级收集的50%的效率进行了研究。颗粒切成大小降低入口面积,体直径,减小涡取景器直径的旋风。切向入口的双流量气旋具有良好的性能考虑的350毫米汞柱的低压降和为1.5μm的质量中位直径在1米3的流量的截止尺寸。一使用切向入口的双流量旋风吸尘器示出了势是一种有效的方法,用于收集在家庭中产生的粉尘。 摘要及关键词:吸尘器; 粉尘; 旋风分离器 引言 我们这个时代的很大一部分都花在了房子,工作场所,或其他建筑,因此,室内空间应该是既舒适情绪和卫生。但室内空气中含有超过室外空气因气密性的二次污染物,毒物,食品气味。这是通过使用产生在建筑中的新材料和设备。真空吸尘器为代表的家电去除有害物质从地板到地毯所用的商用真空吸尘器房子由纸过滤,预过滤器和排气过滤器通过洁净的空气排放到大气中。虽然真空吸尘器是方便在使用中,吸入压力下降说唱空转成比例地清洗的时间,以及纸过滤器也应定期更换,由于压力下降,气味和细菌通过纸过滤器内的残留粉尘。 图1示出了大气气溶胶的粒度分布通常是双峰形,在粗颗粒(>2.0微米)模式为主要的外部来源,如风吹尘,海盐喷雾,火山,从工厂直接排放和车辆废气排放,以及那些在细颗粒模式包括燃烧或光化学反应。表1显示模式,典型的大气航空的直径和质量浓度溶胶被许多研究者测量。精细模式在0.18?0.36 在5.7到25微米尺寸范围微米尺寸范围。质量浓度为2?205微克,可直接在大气气溶胶和 3.85至36.3μg/m3柴油气溶胶。

土木工程本科毕业论文(设计)

摘要 随着我国经济的发展和建筑设计的多样化,高层建筑的基础设计对保证工程安全和控制工程造价至关重要。在选择基础形式时与建筑物的使用性质、上部结构类型、地质情况、抗震性能、对周围建筑物的影响及施工条件等有密切的关系。为节约投资应该对地基基础多方案比较进行优化设计。 本设计的题目是焦作三维国贸中心4#住宅楼桩基础设计,主要思路是根据地质勘察资料、施工条件和工程要求,确定桩基础的桩型、桩的断面尺寸和长度、单桩容许承载力、桩的数量和平面布置以及承台的尺寸和构造,再根据承受的荷载验算桩基承载力,估算沉降量并验算桩和桩承台的强度。 通过设计桩基础要达到掌握桩基设计计算的具体原理及主要设计步骤,更深入地理解桩基工程特性。通过本次钻孔灌注桩基础设计,使作者对桩的受力特点、制作工艺、设计过程和施工方法有一个更为深入的了解,做到了把作者大学四年所学的力学知识和基础课程与具体工程紧密结合,真正实现了理论应用于实践,增强了动手能力,对今后解决实际问题大有帮助。 关键词:地基;桩基础;钻孔灌注桩;设计;

ABSTRACT with the development of our economy and the diversification of architecturaldesign, foundation design of high-rise building is very important to guaranteeonstruction safety and control the project cost. In choosing base form buildings withhe use of the properties, the upper structure type, geological conditions, seismicperformance and influence on surrounding buildings and the construction conditionshave a close relationship. To save investment should optimize the foundation schemes designed. the main idea of this design is according to the geological exploration data, construction conditions and engineering requirements, determine the pile foundation pile type, pile section size and length, the number of allowable bearing capacity of single pile, pile and plane arrangement and the size and structure of the cofferdam, again according to withstand the load calculation of pile foundation bearing capacity, estimating and calculating the pile settlement and the strength of the pile caps. Through the design to achieve mastery of pile foundation design and calculation of concrete pile foundation principle and main design steps, a deeper understanding of pile foundation engineering characteristics. Through the drill hole filling pile foundation design, the author of pile bearing characteristics, production technology, design process and construction method has a more in-depth understanding, did the author at the university four years learning knowledge of mechanics and basic course and combining concrete engineering, truly achieve the theories into practice, enhance the ability to solve practical problems inthe future. Key words:the foundation; Pile foundation;Bored piles; Design; The construction

毕业设计中英文摘要

摘要 本毕业设计选取的题目是东天山小区2-1楼工程造价与施工组织设计。本工程负一层为半地下车库,地上六层,外加一阁楼层,建筑高度26.15m,建筑面积9119.7m2,结构形式为砖混结构。本毕业设计由工程造价、施工组织设计、工程项目管理、专题设计等四个部分组成。 第一部分工程造价。通过福莱一点通软件计算工程量,综合分析现行建筑市场的人工、材料、机械等市场价格,编制设计任务书规定范围的工程量定额报价和工程量清单报价。 第二部分施工组织设计。根据工程特点划分施工段,确定合理的施工顺序,选择主要分部分项工程施工方法和主要施工机械,根据工期要求编制合理施工进度计划表,并绘制施工平面图,以及采取有效的质量、安全等保证措施,例如安全文明施工措施、季节性施工措施等。 第三部分工程项目管理。包括工程进度、质量、造价三大控制以及工期索赔和项目管理机构设计。根据工期要求,在工程进度调整条件下,绘制调整后进度计划表并依据索赔程序,编制工期索赔文件。另外根据工程特点,确定本工程的质量、进度、造价等控制要点,进行项目管理机构设计。 第四部分专题设计。根据工程特点进行外脚手架计算和模板设计。并绘制脚手架设计图和模板设计图。 关键词:工程量计算;工程造价;施工方案;脚手架设计

Abstract The graduation design subject is Easten sky mountain district 2-1# building project cost and the construction organization design.The -1 layer of the project is a underground garage,there are 6 layers overground and a attic, the building is 26.15 meters tall and it’s construction area is 9119.7 square meters, the structure form is brick and concrete structure. the graduation design consists of four parts which are construction cost ,the construction organization design, project management and scaffolding template special design The first part is construction cost .The cost of construction project is calculated by Fly. Analysis the current price of labor, materials, machinery in the construction market and work out the Fixed price and the detailed list of engineering quantity price.choose construction measures of main component project and major machine, The second part is construction organization design. Devide the construction period according to the features of the project, make sure a reasonable construction sequence, Prepare the reasonable construction progress schedule on the basis of construction time limit, draw the construction plan chart and make some measures to protect the quality and safety of the project like safety civilized construction measures and seasonal construction measures. The third part is project management. It includes progress,quality and cost control,claim for extension of time and project management institutions desigh. Draw adjusted progress schedule in the progress of the projects under the condition of adjustment, Draw the construction plan chart, and prepare period claim document depend on the claim program. Make sure the project quality, progress, cost and control points and desigh project management mechanism. The fourth part is project design.Desigh the scaffold and template according to engineering characteristics and draw their figures. Key words: Quantity calculation ;Construction cost ; Construction method;Scaffold design

工程管理毕业设计论文摘要

庆阳市西峰区阳光住宅小区4﹟住宅楼标后相关文件 的编制 (施工图预算(土建部分)、标后施工组织设计(清单)、监理文件) [摘要]庆阳市西峰区阳光住宅小区4﹟住宅楼施工图预算(土建部分),标后施工组织设计,监理文件;施工图预算部分,依据国家现行建筑工程有关技术标准、规范、规程及法律、法规文件,以及甘肃省工程造价指导信息等进行编制。主要编制了单位工程预算表、人材机汇总表、主要材料、机械台班数量汇总表、建筑工程费用计算表、分项工程人材机汇总表等。通过科学的计算步骤,最终计算出该项工程的单方造价1247.57元,本工程总造价为14035850.42元;施工组织设计部分包括了编制说明、编制依据、范围、原则施工进度计划和工期保证措施、施工总平面布置和工程概况;确定施工总体目标,分析了施工总体布置的内容;阐述了施工准备的主要内容;具体说明了工程进度计划、机械选择、施工主要设备与工器具配置计划、施工主要材料采购与进场计划等分项工程的施工工艺及方案;详细介绍了本工程的质量、工期、安全的保证措施;文明施工和环境保护措施;还分别对雨季、冬季、夜间等特殊施工的技术措施做了介绍,并编排了相关工程项目的进度计划;监理文件部分包括监理文件大纲、监理规划、监理实施细则等。 关键词:预算、施工组织、监理文件

preparation of relevant documents (Construction drawing budget (civil section), after the standard construction organization plan ( list )and project management files) [Summary ]Xifeng district sunshine residential district in qingyang city 4﹟residential building construction drawing budget (construction), construction organization after design, project management files; construction drawing budget component, based on the national current building-related technical standards, specifications, regulations and laws, regulations, and instructions for the preparation of project cost in Gansu province. Main compilation unit summary of project budget, manpower, material, machine-class quantity summary table, construction cost breakdown table, summary of engineering talent. By science of calculation steps, eventually calculation out the items engineering of unilateral cost 1247.57 Yuan, this engineering total cost for 14035850.42 Yuan; construction organization design part including has prepared description, and prepared pursuant to, and range, and principles construction progress plans and duration guarantee measures, and construction total plane layout and engineering overview; determines construction general target, analysis has construction general layout of content; explained has construction prepared of main content ; Specific description has engineering progress plans, and machinery select, and construction main device and workers apparatus configuration plans, and construction main material procurement and approach plans divide items engineering of construction technology and the programme; more describes has this engineering of quality, and duration, and security of guarantee measures; civilization construction and environmental protection measures; also respectively on rainy season, and winter, and night, special construction of technology measures do has describes, and arrangement has related project of progress plans; supervision file part including supervision file outline, and supervision planning, and supervision implementation rules,. Keywords:Budgeting, supervision of construction organizations, documents

土木工程毕业设计中英文翻译

附录:中英文翻译 英文部分: LOADS Loads that act on structures are usually classified as dead loads or live loads are fixed in location and constant in magnitude throughout the life of the the self-weight of a structure is the most important part of the structure and the unit weight of the density varies from about 90 to 120 pcf (14 to 19 KN/m)for lightweight concrete,and is about 145 pcf (23 KN/m)for normal calculating the dead load of structural concrete,usually a 5 pcf (1 KN/m)increment is included with the weight of the concrete to account for the presence of the reinforcement. Live loads are loads such as occupancy,snow,wind,or traffic loads,or seismic may be either fully or partially in place,or not present at may also change in location. Althought it is the responsibility of the engineer to calculate dead loads,live loads are usually specified by local,regional,or national codes and sources are the publications of the American National Standards Institute,the American Association of State Highway and Transportation Officials and,for wind loads,the recommendations of the ASCE Task Committee on Wind Forces. Specified live the loads usually include some allowance for overload,and may include measures such as posting of maximum loads will not be is oftern important to distinguish between the

土木工程毕业论文

XX大学高等学历继续教育毕业设计 友爱五队安置区A地块幼儿园项目 施工组织设计 校外学习中心: 学生姓名: 专业: 层次: 年级: 学号: 2019年4月

施工组织设计是建筑施工组织的核心和灵魂,是对工程建设项目全过程的构思设想和具体安排,用来指导施工项目全过程各项活动的技术、经济和组织的综合性文件。本施工组织设计是针对1﹟楼工程施工的纲领性文件。编制时对项目管理机构设置、施工总体部署、施工准备、主要分部分项工程施工方法、工程质量保证措施、安全及文明施工措施、施工现场管理措施等诸多因素尽可能充分考虑,突出科学性、适用性及针对性,是确保优质、低耗、安全、文明、高速完成全部施工任务的重要经济技术文件。 本设计主要包括以下内容:工程施工组织设计书、施工进度计划安排、施工平面布置图、具体施工方案。为确保工期、质量及安全、文明工地,节约成本等条件,编制出针对性的施工组织设计,每个分部分项工程的特点、结构特征、施工难易程度工期和质量要求,编制出切实可行的施工方案。以指导施工顺利地完成本工程项目的建设,控制工程成本,创建优质工程。

摘要 (2) 第一章编制说明 (5) 1.1编制依据 (5) 第二章工程概况及工程特点 (6) 2.1工程概况 (6) 2.2工程特点与施工条件 (6) 第三章施工部署 (6) 3.1项目管理模式 (6) 3.2施工部署原则及流水段划分 (7) 第四章施工准备 (7) 4.1技术准备 (7) 4.1.1一般性技术准备 (7) 4.2施工现场准备 (8) 第五章主要施工方案 (8) 5.1测量工程 (8) 5.1.1工程定位 (8) 5.1.2水准点引测 (8) 5.1.2基础放线定位控制轴线投测 (9) 5.2土方工程 (9) 5.2.1验槽 (9) 5.2.2土方回填 (9) 5.3钢筋工程 (10) 5.3.1钢筋品种 (10) 5.3.2钢筋的加工 (10) 5.3.3钢筋连接 (10) 5.3.4钢筋绑扎 (10) 5.3.5钢筋成品保护 (11) 5.4模板工程 (12)

论文写作规范(中英文摘要及正文)-译文格式

要 随着时代的发展,人们对纺织品的要求也已经不再仅仅局限于实用。激烈的国际竞争逼使纺织企业采用高新 技术重视绿色工艺,开发环保产品则已成为新世纪市场竞争的新焦点。欧共体的Eco-label 倡导的是全生态的概念,欧盟委员会(2002/371/EC )生态标准中,在纺织纤维中列出腈纶纤维的考核指标:原料纤维中丙烯腈的残留量应低于1.5mg/kg 。 丙烯腈是一种有毒物质,且有致癌作用。其极毒,对温血动物的毒性约为氰化氢的1/30。丙烯腈不仅蒸气有毒,而且附着于皮肤上也易经皮肤中毒。长时间吸入稀丙烯腈蒸气,则能引起恶心、呕吐、头痛、疲倦和不适等症状。由此可见,丙烯腈直接危害着人们的健康。 本文依照欧盟(2002/371/EC )生态标准对腈纶纤维中丙烯腈残留量的控制,通过试验论证,确立了采用顶空固相微萃取和色质联用技术(HS —SPME —GC/MS ),由此建立腈纶纤维中丙烯腈残留量的测定方法。该方法具有操作简单,便捷,灵敏度高,准确性好的优点,而且仪器价格适中,便于推广。本文实验所使用的方法检测限低于0.5mg/kg ,回收率在86.2~ 关键词:腈纶,丙烯腈,残留量,气相色谱/质谱

competition, developing environmentally safe products has already become the new focus of the market competition in the new century. What Eco-label of European Community is advocated is all ecological concept , in the ecological standard of EU Committee (2002/371 / EC ), list the examination index of the fibre of the acrylic fibres in the dope-dyed fiber: The residue amount of the acrylonitrile should be lower than 1.5mg/kg in the raw materials fibre. The acrylonitrile is a kind of noxious substance extremely poisonous , the toxicity to the warm-blooded animal is about 1/30 of the hydrogen cyanide. Not only the vapour is poisonous for the acrylonitrile , but also adhere to the skin book of changes skin is poisonned. Suck the vapour of the rare acrylonitrile for a long time, can cause such symptoms as the nausea , vomitting , have a headache , tired and uncomfortable ,etc. . Therefore, the acrylonitrile is endangering people's health directly. Describe the HS-SPME-GC/MS procedure of determination method for acrylonitrile residue in acrylic fibre according to the limit control of European (2002/371/EC). The method provided very good linearity data. This method is easy to operate, highly sensitive and lower cost, easy to be extend. The limits of detection were below 0.5mg/kg, Acerage recovery between 86.2~98.6%.

桩基础毕业设计摘要

桩基础毕业设计摘要 1.桩平面布置原则 (1)力求使各桩桩顶受荷均匀,上部结构的荷载重心与桩的重心相重合,并使群桩在承受水平力和弯矩方向有较大的抵抗矩。 (2)在纵横墙交叉处都应布桩,横墙较多的多层建筑可在横墙两侧的纵墙上布桩,门洞口下面不宜布桩。 (3)同一结构单元不宜同时采用摩擦桩和端承桩。 (4)大直径桩宜采用一柱一桩;筒体采用群桩时,在满足桩的最小中心距要求的前提下,桩宜尽量布置在筒体以内或不超出筒体外缘1倍板厚范围之内。 (5)在伸缩缝或防震缝处可采用两柱共用同一承台的布桩形式。(6)剪力墙下的布桩量要考虑剪力墙两端应力集中的影响,而剪力墙中和轴附近的桩可按受力均匀布置。 2.桩端进入持力层的最小深度 (1)应选择较硬上层或岩层作为桩端持力层。桩端进入持力层深度,对于粘性土、粉土不宜小于2d(d为桩径);砂土及强风化软质岩不宜小于1.5d;对于碎石土及强风化硬质岩不宜小于1d,且不小于0.5m。(2)桩端进入中、微风化岩的嵌岩桩,桩全断面进入岩层的深度不宜小于0.5m,嵌入灰岩或其他未风化硬质岩时,嵌岩深度可适当减少,但不宜小于0.2m。 (3)当场地有液化土层时,桩身应穿过液化土层进入液化土层以下的

稳定土层,进入深度应由计算确定,对碎石土、砾、粗中砂、坚硬粘性土和密实粉土且不应小于0.5m,对其他非岩石土且不宜小于1.5m。(4)当场地有季节性冻土或膨胀土层时,桩身进入上述土层以下的深度应通过抗拔稳定性验算确定,其深度不应小于4倍桩径,扩大头直径及1.5m。 3.桩型选择原则 桩型的选择应根据建筑物的使用要求,上部结构类型、荷载大小及分布、工程地质情况、施工条件及周围环境等因素综合确定。 (1)预制桩(包括混凝土方形桩及预应力混凝土管桩)适宜用于持力层层面起伏不大的强风化层、风化残积土层、砂层和碎石土层,且桩身穿过的土层主要为高、中压缩性粘性土,穿越层中存在孤石等障碍物的石灰岩地区、从软塑层突变到特别坚硬层的岩层地区均不适用。其施工方法有锤击法和静压法两种。 (2)沉管灌注桩(包括小直径D<5O0mm,中直径D=500~600mm)适用持力层层面起伏较大、且桩身穿越的土层主要为高、中压缩性粘性土;对于桩群密集,且为高灵敏度软土时则不适用。由于该桩型的施工质量很不稳定,故宜限制使用。 (3)在饱和粘性土中采用上述两类挤土桩尚应考虑挤土效应对于环境和质量的影响,必要时采取预钻孔。设置消散超孔隙水压力的砂井、塑料插板、隔离沟等措施。钻孔灌注桩适用范围最广,通常适用于持力层层面起伏较大,桩身穿越各类上层以及夹层多、风化不均、软硬

毕业设计中英文翻译

本科毕业设计(论文)中英文对照翻译 院(系部)电气工程与自动化学院 专业名称电气工程及其自动化 年级班级电气05-5班 学生姓名辛玉龙 指导老师封海潮 2009年6月10日

可编程序控制器 可编程序控制器或可编程逻辑控制器(PLC),是一个具有编程能力且完成一定控制功能的设备。 PLC是1968年被美国通用汽车公司的一组工程师设想出来。可编程控制器起初被设计用于基于程序的灵敏性控制和执行逻辑指令。人们意识到它的主要优点是被用于梯形图编程语言,简化了维修并且减少了其余部分的清查。而且,PLC提供了更短的安装时间并通过程序实现比硬接线更加快捷的传输。 当前,世界上已有50多个不同的可编程控制器的生产厂家,因为有如此多的PLC在使用,所以涵盖市场上所有类型的设备是不可能的,幸运的是,根本就没有必要去理解每一个可用的PLC。所有的机器都有许多的相同之处。 1 可编程控制器的组成 所有的可编程控制器都有输入输出接口、存储器编程方法、中央处理器、电源。 输入接口为机器提供一个连接,或使过程被控制。 输入接口是模块且是可扩展的,当控制任务增加时,可以通过扩展模块来接收更多的输入。输入数量的多少是由CPU和存储容量来限制的。输入接口的功能与输出接口相反,它将信号从CPU输出,且将其转换成被外部设备螺线圈、电机启动器等设备来产生控制动作。输出接口本质上也是一个模块,所以当需要时,可以加入输出扩展功能。 PLC的编程语言有多种形式,大多数PLC语言都是基本梯形逻辑,它比继电器逻辑更加先进。流程图程序语言也被用于一些PLC中,流程图是图形语言,它显示出一个过程中的变量相互之间的关系。 编程设备或程序终端允许用户用程序的形式来键入指令,并存入存储器。 程序是由用户编写且存储于PLC的存储器当中,是在特定处理条件下用来产生正确的控制信号的所需动作的表现形式。这样一个程序包括允许

相关文档
相关文档 最新文档